Jump to content

Sagardighi Thermal Power Station

Coordinates: 24°22′06″N 88°06′04″E / 24.36833°N 88.10111°E / 24.36833; 88.10111
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 2402:3a80:196c:f9d9:778:5634:1232:5476 (talk) at 14:28, 17 November 2020 (→‎Capacity). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Sagardighi Thermal Power Project
Map
Location of the Sagardighi Thermal Power Station in West Bengal
Official nameWBPDCL
CountryIndia
LocationSagardighi, West Bengal
Coordinates24°22′06″N 88°06′04″E / 24.36833°N 88.10111°E / 24.36833; 88.10111
StatusOperational
Commission dateUnit 1: 7 September 2008
Unit 2: 6 November 2008
Unit 3: December 2015
Unit 4: January 2017
Operator(s)West Bengal Power Development Corporation Limited
Thermal power station
Primary fuelBituminous coal
Tertiary fuelOil
Power generation
Units operational2X300 MW; 2x500 MW
Nameplate capacity1600 MW
External links
Website[1]
CommonsRelated media on Commons

Sagardighi Thermal Power Station is a thermal power plant located at Manigram, 13 km north of Sagardighi in the Indian state of West Bengal. The power plant is operated by the West Bengal Power Development Corporation Limited.

The site is about 1 kilometre (0.62 mi) from Manigram railway station of the Bandel-Barhawara section of Eastern Railway. NH 34 is about 14 kilometres (8.7 mi) from the site. It is on the western bank of the Bhagirathi.[1][2] The project was developed by the Chinese firm, Dongfang Electric Corporation, at a cost of Rs. 27.50 billion.[3] The power plant had provided employment for about 2,000 people. The state government had acquired 1,600 acres (650 ha) of land without resistance.2x300MW & 2x500MW total generation now is 1600. Another 1x660MW is planned for which EPC contract has been to awarded to public sector engineering major BHEL at cost of around INR 3500 crore.[4]

Capacity

The Thermal Power Station has a planned capacity of 1600 MW; 2 units of 300 MW each and 2 units of 500 MW each.

Unit Number Installed Capacity (MW) Date of Commissioning Status
1 300 2008 September Commissioned
2 300 2008 November Commissioned
3 500 2015 December Commissioned [5]
4 500 2017 January Commissioned [6]
5 660 Work in progress (expected 2023 end) EPC awarded to BHEL[7]

References

  1. ^ "Sagardighi Thermal Power Station" (PDF). Summary Environment Assessment Report. West Bengal Power Development Corporation. Retrieved 14 February 2009.
  2. ^ "Sagardighi thermal plant to begin generation by Aug-end". Economic Times. 17 July 2008. Retrieved 14 February 2009.
  3. ^ "Sagardighi power plant to begin generation by August". Projects Today, 17 July 2008. Retrieved 14 February 2009.
  4. ^ "BHEL bags Rs 3500 cr for setting up 660 MW Supercritical Thermal Power Plant in West Bengal". Business Standard. 31 December 2018. Retrieved 7 September 2019.
  5. ^ http://www.business-standard.com/article/pti-stories/bhel-commissions-thermal-unit-in-west-bengal-115121500883_1.html
  6. ^ http://netindian.in/news/2017/01/16/00040549/bhel-commissions-500-mw-thermal-unit-west-bengal
  7. ^ https://energy.economictimes.indiatimes.com/news/power/bhel-bags-rs-3500-crore-order-for-west-bengal-supercritical-power-plant/67319825