Jump to content

Boonton Branch

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Mackensen (talk | contribs) at 12:51, 21 May 2016 (update Taber; book was co-authored by father and son and published in separate volumes in 1980-1981). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Template:BS-headerTemplate:BS-table
Boonton Branch
Dover
East Dover Jct.
fmr M&E main line/Rockaway Loop (freight only)
Denville - junction created in 1903
NJT Morristown Line - fmr M&E main line/Rockaway Loop
Fox Hill (closed)
Mountain Lakes
Boonton
Montville (closed)
Towaco
Lincoln Park
Mountain View (closed)
Water Spur (abandoned)
Totowa–Little Falls (closed)
West Paterson (closed)
Paterson (closed)
NJT Main Line / Fmr Newark Branch
Clifton
Passaic
Delawanna
Lyndhurst
Kingsland
Kingsland Tunnel
Secaucus Yard
Erie Newark Branch/NY&GL
Erie Railroad
Hoboken Yard
Hoboken

The Boonton Branch refers to the railroad line in New Jersey that was completed in 1870 and ran 34 miles (54.8 km) from Hoboken to East Dover Junction as part of the Morris & Essex Railroad (M&E). Although the branch hosted commuter trains (and to a lesser extent, passenger trains), the line was primarily built as a freight bypass line. The term "branch", therefore, is somewhat of a misnomer since the Boonton Branch was built to higher mainline standards than the Morristown Line, the line that it bypassed. As a result, the Boonton Branch better meets the definition of a "cut-off" rather than a branch. Some of the towns that the Boonton Branch passed through included Lyndhurst, Passaic, Clifton, Paterson, Wayne, Lincoln Park, Mountain Lakes, and its namesake, Boonton.

History and construction

By the end of the American Civil War in 1865, the management of the Morris & Essex Railroad had recognized that the Morristown Line was inadequate as a freight line. The line was circuitous and had to climb the steep 1.5% westbound grade to Summit, New Jersey. Although not yet the issue it would become in the 20th Century, the Morristown Line also passed through numerous small towns that were served by passenger trains. (The term "commuter" was just coming into vogue at that time.) Rather than attempting to rebuild an existing line, the Lackawanna Railroad, which controlled the M&E, decided to build a completely new line. The new line would leave the Morristown Line just west of the Bergen Tunnel at West End and then would rejoin the Morristown line at East Dover Jct., a total of 34 miles. (In 1903, Denville Jct. would be created at its present location and East Dover Jct. would be downgraded.)

The Boonton Branch was built between 1869 and 1870. Reportedly, very few construction problems were encountered. The line more or less paralleled the Morris Canal for its entire length. This was hardly a coincidence for competitive and topographical reasons. From a competitive point of view, the canal still carried a significant amount of coal traffic at the time the Boonton Branch was built. Anthracite coal played a major role in creating a need for the Boonton Branch. As the Road of Anthracite, the Lackawanna Railroad tapped the anthracite-rich hills of the Scranton, Pennsylvania, Valley to supply the suburbs of New Jersey. That situation would rapidly change as the railroad's delivery schedule was counted in hours—not days (as was the case of the canal)—and the railroad didn't freeze over for four months out of the year, at the time when its more profitable commodity was in greatest demand. From a topographical point of view, the Boonton Branch's alignment allowed for fast freight service over a line that was relatively uncongested by commuter and passenger traffic. Westbound, trains had to overcome a ruling grade of 1%, which often required pusher engines and helper engines. Even so, the Boonton Branch's grade profile was a decided improvement over the Morristown Line's.

Growth and severing

Denville Jct. looking westbound in Dec 2010. Until 1903, the Morristown Line crossed over the Boonton Branch here (through what is now a NJ Transit parking lot off to the left), continuing on to Rockaway (on what would become known as the Rockaway Loop to the right) and then onto East Dover Jct. (about 2 miles west of here), where the Morristown Line joined into the Boonton Branch on its way to Dover.

The Lackawanna's freight business grew decidedly from the time of the opening of the Boonton Branch until the First World War. During the 1920s, it continued to grow, necessitating additional tracks being laid on the Boonton Branch. But by the time of the Second World War, the Lackawanna was already in decline, having suffered during the Great Depression (like most other American railroads), and although traffic saw a large upswing during the war, by the 1950s the financial outlook was bleak. In attempt to avoid inevitable bankruptcy, the railroad merged with the Erie Railroad in 1960. The new railroad, Erie Lackawanna Railroad (EL), was full of promise, but did poorly for its first few years, losing millions of dollars. During this time, EL management looked for ways to stave off receivership. In a move that was extremely controversial, the New Jersey Highway Department (now NJDOT) moved to buy the right-of-way of the Boonton Branch between Paterson and Totowa, New Jersey, for Interstate 80 from the Erie Lackawanna. The highway department approached EL management with an offer of $2 million if the railroad agreed to completely sever the route. The highway department would have permitted the EL to retain one track (it was a double-track line), but the railroad would not have received any cash. Public hearings were held where rail advocates criticized the idea of severing the line, but to no avail.

Since most of the railroad's freight had been shifted off of the former Boonton Branch at Mountain View, with the Erie's Greenwood Lake Branch to be used as the new eastern connection to Hoboken, creating the new Boonton Line for commuter purposes, the impact of the severing of the line initially seemed to be minimal. On paper, the severing of the line only affected the City of Paterson with the closing of the former Lackawanna passenger station located on a hill above the city. Paterson was already served by the former Erie mainline station in downtown Paterson and did not protest the move. What was lost, and what would eventually come back to haunt the EL, was that of a high-speed freight route.

Indeed, in a decade's time after the severing of the line at Garret Mountain, all long-haul freights would be brought back to the "Lackawanna side". The aforementioned Greenwood Lake Branch had a grade profile similar to that of the Morristown Line, a line which the Morris & Essex Railroad's management had decided to bypass a century earlier. The use of the Greenwood Lake Branch would prove to be an operational headache. And after the EL became part of Conrail in 1976, Conrail specifically would point to the severing of the Garret Mountain section of the Boonton Branch as a key reason in its decision to abandon the Lackawanna Cutoff.

With the opening of the Montclair Connection in 2002, trains over the Boonton Line were rerouted at Montclair over the Montclair Branch, resulting in the renaming of the line to the Montclair-Boonton Line.


Station list

All mileposts are from Hoboken Terminal.

County Milepost Station Opened Rebuilt Closed Notes
Hudson
3.7[1]
Secaucus
1903–04[1]
Station constructed as part of a new yard replacing the one at Kingsland.[1]
Bergen
7.1[2]
Kingsland
1903–04[3]
Still in use for New Jersey Transit's Main Line.
8.2[4]
Lyndhurst
1928[4]
Passaic
9.4[5]
Delawanna
1925[5]
10.1[6]
South Passaic 1902[6] The station was discontinued when the Passaic depot was moved further south.[6]
10.6[7]
Passaic
1901–02[7]
Still in use for New Jersey Transit's Main Line.
12.1[8]
Athenia
1903[8]
Renamed from Clifton prior to 1900. Now the Clifton station on New Jersey Transit's Main Line.
15.1[7]
Paterson 1928[9]
1963
The Lackawanna Railroad decided the need for three stations in Paterson was unnecessary and instead, replaced with one station in 1928.[10] The original station at Paterson was located 0.5 miles (0.80 km) south.[7] The station was demolished for the Passaic Plan by the Erie-Lackawanna Railroad in 1963.
15.9[11]
West Paterson 1903–1906[11] A turntable was located at this station until being removed between 1903 and 1917.[11]
18.2[4]
Totowa–Little Falls 1909[4]
1963
20.8[12]
Mountain View 1909[12]
1963
Morris
22.9[13]
Lincoln Park
1905[13]
Station formerly known as Beavertown.[13] Station still in use as part of New Jersey Transit's Montclair-Boonton Line.
25.2[14]
Towaco 1909[12] Station formerly known as Whitehall until 1905.[14] Station still in use as part of New Jersey Transit's Montclair-Boonton Line.
27.8[15]
Montville
29.2[16]
Boonton 1905[16] Station relocated from 0.4 miles (0.64 km) west in 1905.[16] Station still in use as part of New Jersey Transit's Montclair-Boonton Line.
31.2[17]
Mountain Lakes 1912[17] Station replaced the original Fox Hill station, 0.9 miles (1.4 km) west.[17] Station still in use as part of New Jersey Transit's Montclair-Boonton Line.
34.9[18]
Denville 1903[18] The original station was located 0.25 miles (0.40 km) south. Junction with the Morristown Line [18] Station still in use as part of New Jersey Transit's Montclair-Boonton and Morristown lines.
38.1[18]
Dover 1901[18] Station still in use as part of New Jersey Transit's Montclair-Boonton and Morristown lines.

See also

Notes

  1. ^ a b c Taber & Taber 1981, p. 762.
  2. ^ Taber & Taber 1981, p. 745.
  3. ^ Taber & Taber 1981, p. 746.
  4. ^ a b c d Taber & Taber 1981, p. 749.
  5. ^ a b Taber & Taber 1981, p. 734.
  6. ^ a b c Taber & Taber 1981, p. 764.
  7. ^ a b c d Taber & Taber 1981, p. 758.
  8. ^ a b Taber & Taber 1981, p. 723.
  9. ^ Taber & Taber 1980, p. 107.
  10. ^ Taber & Taber 1980, p. 106.
  11. ^ a b c Taber & Taber 1981, p. 770.
  12. ^ a b c Taber & Taber 1981, p. 753.
  13. ^ a b c Taber & Taber 1981, p. 748.
  14. ^ a b Taber & Taber 1981, p. 766.
  15. ^ Taber & Taber 1981, p. 751.
  16. ^ a b c Taber & Taber 1981, p. 727.
  17. ^ a b c Taber & Taber 1981, p. 752.
  18. ^ a b c d e Taber & Taber 1981, p. 735.

References

  • Taber, Thomas Townsend; Taber, Thomas Townsend III (1980). The Delaware, Lackawanna & Western Railroad in the Twentieth Century. Vol. 1. Muncy, PA: Privately printed. ISBN 0-9603398-2-5. {{cite book}}: Invalid |ref=harv (help)
  • Taber, Thomas Townsend; Taber, Thomas Townsend III (1981). The Delaware, Lackawanna & Western Railroad in the Twentieth Century. Vol. 2. Muncy, PA: Privately printed. ISBN 0-9603398-3-3. {{cite book}}: Invalid |ref=harv (help)