Jump to content

Line 2 (Nanchang Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ASDFGH (talk | contribs) at 06:20, 20 May 2018 (→‎Opening timeline). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 2
 2 
Overview
Other name(s)Nanchang Rail Transit Line 2
Native name南昌地铁2号线
StatusOperational
LocaleNanchang, Jiangxi, China
Termini
Stations17
Service
TypeRail Transit
SystemNanchang Metro
Depot(s)Nanchang West station MPD[1]
Rolling stockModel-B EMU, 6 cars coupled
Technical
Line length19.6 km (12.2 mi)
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead catenary, 1500 V DC
Operating speed80 km/h (50 mph)

Nanchang Metro Line 2 (also known as Nanchang Rail Transit Line 2 in official documents) is a rail transit line under construction in Nanchang, planned to connect Jiulonghu (Chinese: 九龙湖) and Luojia Town (Chinese: 罗家镇); its Phase 1 starts at Zhanqian Nan Dadao (Chinese: 站前南大道) and ends at Xinjia'an (Chinese: 辛家庵), both termini designed for further extension. The Phase 1 is 23.3 km in length with 21 stations (including 6 transfer stations).[2] The construction of Phase 1 started in July 2013, and opened on 18 August 2017.[3][needs update]

Opening timeline

Segment Commencement Length Station(s) Name
Metro Central — Nanlu 18 August 2017 19.600 km (12.18 mi) 17 Phase 1 (Xinjian section)

Route and stations

station name Connections Distance
km
Location
English Chinese
Template:NCM stations 地铁大厦  1  0.00 0.00 Qingshanhu/Donghu/Xinjian
Template:NCM stations 翠苑路 1.38 1.38 Xinjian
Template:NCM stations 学府大道东  5  1.60 2.98
Template:NCM stations 前湖大道 0.85 3.83
Template:NCM stations 岭北 1.43 5.26
Template:NCM stations 卧龙山 1.30 6.56
Template:NCM stations 国体中心 1.17 7.73
Template:NCM stations 龙岗 1.60 9.33
Template:NCM stations 南昌西站 Nanchang West railway station NXG 1.09 10.42
Template:NCM stations 西站南广场  4  Nanchang West railway station NXG 0.65 11.07
Template:NCM stations 国博 1.19 12.26
Template:NCM stations 鹰潭街 1.29 13.55
Template:NCM stations 市民中心 1.03 14.58
Template:NCM stations 九龙湖南 1.19 15.77
Template:NCM stations 生米 0.91 16.68
Template:NCM stations 大岗 1.21 17.89
Template:NCM stations 南路 0.89 18.78

Rolling stock

Nanchang Metro Line 2 is planned to be operated with Model-B rolling stock with maximum speed of 80 km/h. 22 trains of 6 EMUs, 132 cars in total will be operated at the first stage. These cars are 2.8 m in width, 3.8 m in height and 19 m in length, providing the system with maximum capacity of 30 000 to 55 000 passenger per hour per direction, and minimum service interval of 2 minutes.[4]

Future development

In the initial plan of 2008, Line 2 spans from Luojia Town in the east to Wangcheng (Chinese: 望城) in the west, and is 39 km in length in the long-term plan.[5] Its Phase 1 starts from CR Nanchang West station to Hongdu Zhong Dadao,[6] which was extended to Xinjia'an to the east in the end of 2010 and then extended further south to Jiulonghu in early 2013.[7][8]

  • South extension: Phase 2 extends Line 2 from Zhanqian Nan Dadao, which is transferrable to Line 4 to Shengmi Town;
  • East extension: Phase 2 extends Line 2 to Luojia town via Xinjia'an.

References

  1. ^ "Nanchang Metro map". Sinaming.cn (in Chinese).
  2. ^ "南昌轨道交通2号线基本情况" (in Chinese). 28 December 2011. Archived from the original on 29 October 2013.
  3. ^ "南昌地铁2号线7月全线开工 卧龙山站今日正式动工". jxnews.com (in Chinese). 15 January 2013.
  4. ^ "南昌地铁拟采用B型车 单向每小时载乘客5.5万人次". jxnews.com.cn (in Chinese). 18 November 2008.
  5. ^ "南昌地铁远景规划征询民意(图)". jxnews.com.cn (in Chinese). 16 October 2008.
  6. ^ "南昌地铁一期勘察招标 拟于2015年完工投运". jxnews.com.cn (in Chinese). 21 April 2009.
  7. ^ "南昌地铁2号线拟南延增8站 下穿九龙湖抵达生米大道". jxcn.cn (in Chinese). 5 February 2013.
  8. ^ "南昌地铁2号线拟南延至九龙湖 新增8个站点". jxnews.com.cn (in Chinese). 4 February 2013.