Jump to content

Line 5 (Chengdu Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Terramorphous (talk | contribs) at 03:51, 20 November 2016 (added info). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 5
Overview
Statusunder consturation
OwnerCity of Chengdu
LocaleChengdu, China
Termini
  • Huazang
  • Huilong Road
Stations41
Service
TypeRapid transit
SystemChengdu Metro
Services2
Operator(s)Chengdu Metro Corporation
Depot(s)Dafeng
Rolling stockYuanhua, Huilong
History
OpenedLate 2019
Technical
Line length49.018 km (30.46 mi)
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)

Line 5 of the Chengdu Metro (Chinese: 成都地铁5号线; pinyin: Chéngdū Dìtiě Wǔ Hào Xiàn) runs from Xindu District to Tianfu New District. It starts at Huazang and ends at Huilong Road. The total length is 49.018 km. Line 5's color is purple. This line began construction on 14 September 2015, is scheduled to be complete on late 2019,[1] from Huazang to Huilong Road. Anticipating high demand as the line will provide relief for the older Line 1 and connect several important business and residential districts, the line will use high capacity 8 car A size trains capable of providing capacities of 64,300 people per hour.[2]

Stations

Huazang - Qilong
Huazang - Huilong Road

Phase 1

  • Huazang
  • Poshuichang (Planned transfer )
  • Liaojiawan
  • Northen Trade city
  • Xinfuqiao
  • Jiudaoyan
  • Dujianian
  • Dafeng (Planned transfer
      Line 1
    )
  • Shixi Park
  • Huanghuayuan
  • Gubai
  • Quanshui Road (Planned transfer
      Line 9
    )
  • Dongzikou
  • Fuing Road
  • Wukiaushi
  • Yujvan
  • Beizhan West No.2 Road (Consturationed transfer
      Line 7
    )
  • Xibeiqiao (Consturationed transfer
      Line 6
    )
  • Fuqing
  • CUTCM & Sichuan People's Hospital (Transfer
      Line 2
    or
      Line 4
    )
  • Qinyanggong (Planned transfer )
  • Provincial orthopaedic hospital (Planned transfer )
  • Gaoshengqiao (Transfer
      Line 3
    )
  • Keyuan
  • Jiuxing Avenue (Planned transfer
      Line 8
    )
  • Shenxianshu (Consturationed transfer
      Line 7
    )
  • Shiyang Flyover
  • Chengdu city No.1 hospital
  • Jiaozi Avenue
  • Jincheng Avenue (Planned transfer
      Line 9
    )
  • Jincheng Lake
  • Dayuan
  • Minle (Planned transfer )
  • Qilong (Planned transfer
      Line 6
    )

Phase 2

  • Chengdu Police academy
  • Erjiang Temple
  • Nanhu Flyover
  • Gaofeng
  • Longma Road
  • Huilong Road (Planned transfer )
  • South Extsion No Name given

See also

References

  1. ^ "成都地铁5号线设41个站 2019年开通运营" (in Chinese). Sichuan News. 21 May 2015. Retrieved 2015-07-04. {{cite news}}: Italic or bold markup not allowed in: |publisher= (help); Unknown parameter |trans_title= ignored (|trans-title= suggested) (help)
  2. ^ "成都地铁5号线将进行扩容 运能提高约70% ——凤凰房产成都". cd.house.ifeng.com. Retrieved 2016-11-20.