Soroti Fruit Processing Factory

Coordinates: 01°47′11″N 33°36′55″E / 1.78639°N 33.61528°E / 1.78639; 33.61528
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Fsmatovu (talk | contribs) at 16:02, 18 September 2018 (→‎Timetable: new inline reference). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Soroti Fruit Processing Factory
Company typePublic Private Partnership
IndustryManufacture & Distribution of Sugar
Founded2014
HeadquartersArapai, Soroti, Uganda
ProductsFruit juice, fruit concentrate, packaged fruit
Total assetsUS$10 million (2014)

Soroti Fruit Processing Factory, also Soroti Fruit Factory, is a fruit processing plant under construction in Uganda.[1][2]

Location

The factory is under construction in Arapai sub-county, Soroti District, near the town of Soroti, approximately 292 kilometres (181 mi), by road, north-east of Kampala, Uganda's capital and largest city.[3]

Overview

The government of Uganda (GOU), with the assistance of the Korea International Cooperation Agency (KOICA) and in partnership with the Teso Tropical Fruit Growers Cooperative Union (TETFGCU), decided to establish a fruit processing factory in Soroti District to take advantage of the abundant citrus crop in the Teso sub-region and the high yield per tree. GOU provided the land, utilities, and infrastructure. KOICA set aside US$7.4 million for equipment and training and is building the factory.[2] And TETFGCU will grow the fruit that the factory will process. Citrus fruit and mangoes are the principal fruits under consideration.[1]

Ownership

The ownership of the factory is as depicted in the table below:[4]

Soroti Fruit Processing Factory Stock Ownership
Rank Name of Owner Percentage Ownership
1 Uganda Development Corporation 80.0
2 Teso Tropical Fruit Growers Cooperative Union 20.0
Total 100.00

Timetable

Construction of the factory began in April 2015 and was scheduled to be completed in May 2016. Installing and commissioning the machinery and equipment was anticipated from August 2016 to October 2016. The factory was scheduled to commence commercial operation in November 2016.[1][5]

After years of delay, the factory began test runs of its production lines in May 2018, with commercial commissioning planned for August 2018.[4] Production is planned to be phased, starting with one 8-hour shift and gradually increasing to two and eventually three daily shifts.[4][6]

References

  1. ^ a b c UDC (9 February 2015). "Soroti Fruit Factory Project". Kampala: Uganda Development Corporation (UDC). Retrieved 17 March 2016.
  2. ^ a b Felix Osujo, and James Odong (19 September 2014). "Museveni launches construction of Soroti fruit factory". New Vision. Kampala. Retrieved 17 March 2016.
  3. ^ GFC (17 March 2016). "Distance between Kampala Road, Kampala, Central Region, Uganda and Arapai, Eastern Region, Uganda". Globefeed.com (GFC). Retrieved 17 March 2016.
  4. ^ a b c Ismail Musa Ladu, and George Muron (22 May 2018). "After years of waiting, the fruit factory is now ready". Daily Monitor. Kampala. Retrieved 18 September 2018.
  5. ^ Odyek, John (11 April 2016). "Soroti fruit factory experiences delays in completion". New Vision. Kampala. Retrieved 10 October 2016.
  6. ^ Nassali, Fatiah (17 May 2018). "Teso fruit factory set to open in August". Kampala: NilePost Uganda. Retrieved 18 September 2018.

External links

01°47′11″N 33°36′55″E / 1.78639°N 33.61528°E / 1.78639; 33.61528