Jump to content

South Carolina Highway 253

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Mr. Matté (talk | contribs) at 02:04, 2 June 2018 (Add map, KML, the whole point of defining abbrvs once is so you can continue using it later). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

South Carolina Highway 253 marker
South Carolina Highway 253
Route information
Maintained by SCDOT
Length19.4 mi[1] (31.2 km)
Existed1939–present
Major junctions
South end SC 124 in Parker
Major intersections
North end SC 414 in Tigerville
Location
CountryUnited States
StateSouth Carolina
CountiesGreenville
Highway system
SC 252 SC 254

South Carolina Highway 253 (SC 253) is a primary state highway in the U.S. state of South Carolina. It runs in Greenville and is the gateway to Paris Mountain State Park and runs from Parker to Tigerville.

Route description

The highway begins at SC 124 near Parker and travels 12 mi (0.80 km) northeast to SC 183 as West Blue Ridge Drive. It then moves up to Sulphur Springs Road where the road changes to East Blue Ridge Drive before intersecting at Poinsett Highway on U.S. Highway 276 (US 276) before running concurrently on SC 291 as North Pleasantburg Drive for 0.16 mi (0.26 km) before turning left at Paris Mountain Road. After traveling 2.53 mi (4.07 km) and passing Greenvista Drive, SC 253 becomes East Mountain Creek Road and traveling and additional 6.71 mi (10.80 km) before intersecting with SC 290. SC 253 then turns left and goes 7.22 mi (11.62 km) before terminating at SC 414 in Tigerville.[1][2]

History

SC 253 started in 1939 at the intersection of US 25 and US 276 to form an 11 mi (18 km) highway around Paris Mountain State Park, ending around Travelers Rest. Nine years later, SC 253 was reduced to secondary status with par of the road becoming county roads S-23-22. The road was resurrected in 1950 as a north-south road to Tigerville. In 1965, SC 253 was extended to SC 250 which is now part of US 25 and then extended southwest again between 1968 and 1970 to its current terminus at SC 124.

Improvements to the road include the road being fully paved in 1941 or 1942, being four-laned with SC 291 between 1968 and 1970, and four-laned again for a distance south of US 276 in 1977.

Major intersections

The entire route is in Greenville County.

Locationmi[1]kmDestinationsNotes
Parker0.00.0 SC 124 (Old Easley Highway) – Greenville, Easley
0.50.80
US 25 (White Horse Road) to I-85 – Greenwood, Travelers Rest
2.33.7 SC 183 (Cedar Lane Road) – Greenville, Pickens
Sans Souci4.57.2 US 276 (Poinsett Highway) – Greenville, Travelers Rest
4.77.6
SC 291 east (Pleasantburg Drive) – Wade Hampton
13.621.9
SC 290 east (Locust Hill Road) – Greer
South end of concurrency with SC 290
13.822.2
SC 290 west (Locust Hill Road) – Slater-Marietta
North end of concurrency with SC 290
Tigerville19.431.2 SC 414 – Campobello, Slater-Marietta
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

  1. ^ a b c "South Carolina Highway 253" (Map). Google Maps. Retrieved 2014-01-21.
  2. ^ "General County Highway Maps". South Carolina Department of Transportation. Retrieved 2014-01-21.
KML is not from Wikidata