Jump to content

Talk:Eccup Reservoir

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

Date?

[edit]

The Blackmoor tunnel was built around the 1830's and Seven Arches were "open" in 1837, so the reservoir was probably working before 1843. Other sources report that the reservoir was built in 1830. I have not yet found a reliable source, but I suspect work was started in 1830 and may have been continued through 1837 and completed in 1843. --GhostInTheMachine (talk) 01:19, 9 January 2012 (UTC)[reply]