Talk:Suniva

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

400 MW capacity[edit]

Can anyone explain what it means for a solar panel factory to have a capacity of 400 MW? Kendall-K1 (talk) 21:41, 14 March 2016 (UTC)[reply]

External links modified[edit]

Hello fellow Wikipedians,

I have just modified one external link on Suniva. Please take a moment to review my edit. If you have any questions, or need the bot to ignore the links, or the page altogether, please visit this simple FaQ for additional information. I made the following changes:

When you have finished reviewing my changes, you may follow the instructions on the template below to fix any issues with the URLs.

This message was posted before February 2018. After February 2018, "External links modified" talk page sections are no longer generated or monitored by InternetArchiveBot. No special action is required regarding these talk page notices, other than regular verification using the archive tool instructions below. Editors have permission to delete these "External links modified" talk page sections if they want to de-clutter talk pages, but see the RfC before doing mass systematic removals. This message is updated dynamically through the template {{source check}} (last update: 18 January 2022).

  • If you have discovered URLs which were erroneously considered dead by the bot, you can report them with this tool.
  • If you found an error with any archives or the URLs themselves, you can fix them with this tool.

Cheers.—InternetArchiveBot (Report bug) 02:59, 11 July 2017 (UTC)[reply]

Uhh, something is very wrong here[edit]

The lawsuit that SolarWorld is involved in began years ago, I recall everyone rolling their eyes at the company I was working at - and I haven't worked in the industry for a while now. This is easy enough to confirm in google. Maury Markowitz (talk) 18:57, 22 September 2017 (UTC)[reply]

Or not, they got in on this one too. Maury Markowitz (talk) 20:01, 22 September 2017 (UTC)[reply]