Liverpool and Manchester Railway: Difference between revisions
m typo fixes - spelling/grammar ( you can help! ) |
Copy-editing |
||
Line 1: | Line 1: | ||
{{mergefrom|Liverpool and Manchester Railway Company}} |
{{mergefrom|Liverpool and Manchester Railway Company}} |
||
The '''Liverpool and Manchester Railway''' ( |
The '''Liverpool and Manchester Railway''' (L&MR) was the world's first intercity passenger [[railway]] in which all the trains were timetabled and operated for most of the distance solely by [[steam locomotive]]s. (The [[Stockton and Darlington]] Railway opened in 1825, but sections of this line employed cable haulage, and only the coal trains were hauled by locomotives. Horse-drawn traffic could use the railway upon payment of a toll.) The LMR was primarily built to provide faster transport of raw materials and finished goods between the port of [[Liverpool]] and mills in [[Manchester]] in north-west [[England]]. |
||
[[image:2004-10-09 Sankey Brook.jpg|thumb|right|200px|[[Sankey Viaduct|Stephenson's |
[[image:2004-10-09 Sankey Brook.jpg|thumb|right|200px|[[Sankey Viaduct|Stephenson's viaduct]] crossing the Sankey Brook]] |
||
==Historic Line== |
==Historic Line== |
||
=== Up to Construction === |
=== Up to Construction === |
||
The |
The L&MR was intended to achieve cheap transport of raw materials and finished goods between Manchester and its natural port outlet; Liverpool. The existing means of water transport, the [[Mersey and Irwell Navigation]] and the [[Bridgewater Canal]], dated from the previous century, and were felt to be making excessive profits from the existing trade and throttling the growth of Manchester. (Similar feelings with regard to the railways led in turn to the construction of the [[Manchester Ship Canal]] in the 1890s). There was support for the railway from the cities at either end, but opposition from the landowners over whose land the railway was proposed to pass. |
||
The original promoters are usually ackowledged to be [[Joseph Sandars]], a rich Liverpool corn merchant, and [[John Kennedy]], then owner of the largest spinning mill in Manchester. They were influenced by the writings of [[William James (railway engineer)|William James]]. Now something pf a forgotten figure, James was a land surveyor who had made a fortune in property speculation. He advocated a national network of 'railways', based upon what he had seen of the development of colliery lines and locomotive technology in the north of England. |
The original promoters are usually ackowledged to be [[Joseph Sandars]], a rich Liverpool corn merchant, and [[John Kennedy]], then owner of the largest spinning mill in Manchester. They were influenced by the writings of [[William James (railway engineer)|William James]]. Now something pf a forgotten figure, James was a land surveyor who had made a fortune in property speculation. He advocated a national network of 'railways', based upon what he had seen of the development of colliery lines and locomotive technology in the north of England. |
||
The initial survey for the line was carried out by [[William James (railway engineer)|William James]] and [[Robert Stephenson]] and, being done surreptitiously and/or by trespass, was |
The initial survey for the line was carried out by [[William James (railway engineer)|William James]] and [[Robert Stephenson]] and, being done surreptitiously and/or by trespass, was defective. Robert departed for [[South America]] and William James became bankrupt. Consequently, in [[1824]] [[George Stephenson]] was appointed engineer in their place. By this time, he was taking on too much. As Robert was absent, George (who could not do the calculations required, and had relied on his son for this part of the business) left checking the survey to subordinates. Upon presentation to Parliament in [[1825]] it was shown to be inaccurate (particularly in relation to the Irwell bridge), and the first Bill was thrown out. A key opposition figure in this had been [[G. H. Bradshaw]], one of the trustees of the [[George Leveson-Gower, 1st Duke of Sutherland|Marquess of Stafford]]'s Worsley estate, which included the [[Bridgewater Canal]]. |
||
In place of Stephenson, who was now in disgrace, the railway promoters appointed [[George Rennie (engineer)|George]] and [[John Rennie (railway engineer)|John Rennie]] as engineers, who chose [[Charles Vignoles|C.B.Vignoles]] as their surveyor. They also set out to placate the canal interests and had the good fortune to be able to approach the Marquess directly through the good offices of their counsel, Mr. Adam, who was a relative of one of the trustees, and the support of [[William Huskisson]] who knew the Marquess personally. Implacable opposition to the line changed to financial support, a considerable coup. |
In place of Stephenson, who was now in disgrace, the railway promoters appointed [[George Rennie (engineer)|George]] and [[John Rennie (railway engineer)|John Rennie]] as engineers, who chose [[Charles Vignoles|C. B. Vignoles]] as their surveyor. They also set out to placate the canal interests and had the good fortune to be able to approach the Marquess directly through the good offices of their counsel, Mr. Adam, who was a relative of one of the trustees, and the support of [[William Huskisson]] who knew the Marquess personally. Implacable opposition to the line changed to financial support, a considerable coup. |
||
The second Bill received the Royal Assent in [[1826]], and was for a railway on a considerably different alignment, avoiding the properties of particularly vociferous or effective opponents of the previous Bill, but as a consequence facing the challenge of crossing ''[[Chat Moss]]'' [[bog]]. It was intended to place the Manchester terminus on the Salford side of the river, but the [[Mersey and Irwell Navigation]] withdrew their opposition to a crossing of their river at the last moment, in return for access for their carts to the intended railway bridge. The Manchester station was thus fixed at Liverpool Road in the heart of [[Castlefield]]. |
The second Bill received the Royal Assent in [[1826]], and was for a railway on a considerably different alignment, avoiding the properties of particularly vociferous or effective opponents of the previous Bill, but as a consequence facing the challenge of crossing ''[[Chat Moss]]'' [[bog]]. It was intended to place the Manchester terminus on the Salford side of the river, but the [[Mersey and Irwell Navigation]] withdrew their opposition to a crossing of their river at the last moment, in return for access for their carts to the intended railway bridge. The Manchester station was thus fixed at Liverpool Road in the heart of [[Castlefield]]. |
||
=== Construction === |
=== Construction === |
||
The terms asked for by the Rennies proving unnacceptable, George Stephenson was reappointed as engineer with his assistant |
The terms asked for by the Rennies proving unnacceptable, George Stephenson was reappointed as engineer with his assistant [[Joseph Locke]]. Previous experience with civil engineers set Stephenson against allowing Vignoles to continue his survey and he resigned. L. T. C. Rolt in his biography of Stephenson suggests that a faction on the Board continued to ask Stephenson for second opinions, and Rennie took umbrage at this. Vignoles may have resigned because he had been appointed by Rennie, and as an ex-army engineer thought it the honourable thing to do. |
||
The 35-mile line was a remarkable engineering achievement for its time, beginning with the 2250 |
The 35-mile line was a remarkable engineering achievement for its time, beginning with the 2250-[[yard]] [[Wapping Tunnel]] beneath Liverpool from the docks to [[Edge Hill]]. Following this was a two mile-long-cutting, up to 70 feet deep, through rock at Olive Mount, and a nine 50-foot span arch viaduct over the Sankey Brook Valley, around 70 feet high. Not least was the famous 4.75-mile crossing of Chat Moss. |
||
Having found it impossible to drain the bog, Stephenson began constructing a large number of wooden and heather hurdles which were |
Having found it impossible to drain the bog, Stephenson began constructing a large number of wooden and heather hurdles, which were sunk into the bog using stones and earth until they could provide a solid foundation - it was reported that at one point tipping went on solidly for weeks until such a foundation had been created. To this day the track across Chat Moss floats on the hurdles that Stephenson's men laid and if one stands near the lineside one can feel the ground move as a train passes. It is worthy of note that the line now supports locomotives 25times the weight of the Rocket, which hauled the first experimental train over the moss in January 1830. |
||
The line was laid using |
The line was laid using 15-foot fish-belly rails at 35 lb. per yard, laid either on stone blocks or wooden sleepers. |
||
==== Cable or locomotive haulage ==== |
==== Cable or locomotive haulage ==== |
||
In [[1829]] adhesion-worked locomotives had not proved particularly reliable. The experience on the [[Stockton and Darlington Railway]] was well-publicised, and a section of the [[Hetton colliery railway]] had been converted to cable |
In [[1829]] adhesion-worked locomotives had not proved particularly reliable. The experience on the [[Stockton and Darlington Railway]] was well-publicised, and a section of the [[Hetton colliery railway]] had been converted to cable haulage. The success of the latter method was undisputable, while the steam locomotive was still untried. The L&MR had sought to de-emphasise the use of them during the passage of the bill, the public having become alarmed at the idea of these monstrous machines which, if they did not explode, would fill the countryside with noxious fumes. Moreover, attention was turning towards steam road carriages, such as those of [[Goldsworthy Gurney]]. There was thus a division in the L&MR board between those who supported Stephenson's "loco-motive" and those who favoured cable haulage, the latter supported by the opinion of the engineer, [[John Urpeth Rastrick|John Rastrick]]. Stephenson was not averse to cable haulage - he continued to build such lines where he felt it appropriate - but knew its main disadvantage, that any breakdown anywhere would paralyse the whole line. |
||
The gradient profile of the line had been arranged so as to concentrate the steep grades in three places (either side of Rainhill at 1 in 100 and down to the docks at Liverpool at 1 in 50 |
The gradient profile of the line had been arranged so as to concentrate the steep grades in three places (either side of Rainhill at 1 in 100 and down to the docks at Liverpool at 1 in 50) and make the rest of the line very gently graded, say 1 in 2000. To determine whether and which locomotives would be suitable, the directors organised the [[Rainhill Trials]]. When the line opened the final passenger section from Edge Hill to [[Crown Street railway station]] was cable hauled as was the section down the [[Wapping Tunnel]]. |
||
==== Double track ==== |
==== Double track ==== |
||
Line 38: | Line 38: | ||
[[Image:2004-10-09 Bridge over A49.jpg|thumb|right|200px|Stephenson's bridge over the Warrington - Wigan Turnpike Road]] |
[[Image:2004-10-09 Bridge over A49.jpg|thumb|right|200px|Stephenson's bridge over the Warrington - Wigan Turnpike Road]] |
||
[[Image:2004-10-09 Huskisson monument.jpg|thumb|right|200px|Huskisson monument]] |
[[Image:2004-10-09 Huskisson monument.jpg|thumb|right|200px|Huskisson monument]] |
||
The line opened on [[September 15]], [[1830]] with termini at Liverpool Road, [[Manchester]] ( |
The line opened on [[September 15]], [[1830]] with termini at Liverpool Road, [[Manchester]] (now part of the [[Museum of Science and Industry in Manchester]]) and Edge Hill, Liverpool. The festivities of the opening day were marred when [[William Huskisson]], the popular Member of Parliament for Liverpool, seized the opportunity of a temporary halt to alight and talk to the [[Arthur Wellesley, 1st Duke of Wellington | Duke of Wellington]], then [[Prime Minister]], through the Duke's carriage window. Standing on the permanent way, he misjudged the speed of the approaching [[Stephenson's Rocket|''Rocket'']] and was run over, becoming the world's first railway passenger fatality. (He was not killed instantly; the locomotive ''Northumbrian'' was detached from the Duke's train and rushed him to [[Eccles, Greater Manchester|Eccles]], where he died in the vicarage). The somewhat subdued party proceeded to Manchester, where, the Duke being deeply unpopular with the labouring classes, they were given a lively reception (bricks thrown, etc), and returned to Liverpool. |
||
Notwithstanding the unfortunate start to its career, the |
Notwithstanding the unfortunate start to its career, the L&MR was very successful. Within a few weeks of opening it ran its first excursion trains, carried the first mails, and was conveying road-rail containers for Pickfords; by the summer of 1831 it was carrying tens of thousands by special trains to Newton Races. |
||
Although the Act had allowed for it to be used by private carriers paying a toll, |
Although the Act had allowed for it to be used by private carriers paying a toll, from the start the company decided to own and operate the trains itself. Although the original intention had been to carry goods, the canal companies reduced their prices, (an indication that, perhaps the railwaymen had been right to suggest their charges were excessive) and the extra transit time was acceptable in most cases. In fact the line did not start carrying goods until December, when the first of some more powerful engines, "Planet", was delivered. What was not expected was the line's success in carrying passengers. The experience at Rainhill had shown that uprecedented speed could be achieved. The train was also cheaper and more comfortable than travel by road. So, at first, the company concentrated on this, a decision that had repercussions across the country and triggered the "[[railway mania]]". |
||
Initially trains travelled at |
Initially trains travelled at 17 mph, due the limitations of the track. Drivers could, and did, travel more quickly, but they would be reprimanded. By [[1840]], the track seems to have been largely replaced by parallel rail of 60-75 lb. per yard, with wooden sleepers. |
||
The tunnel from Lime Street to Edge Hill was fully completed in 1836 and when it opened carriages were separated from their engines and lowered to Lime Street station by gravity, their descent controlled by brakemen, and hauled back up to Edge Hill by rope from a stationary engine. The tunnel is approximately 1811 metres (1980 yards) long. |
The tunnel from Lime Street to Edge Hill was fully completed in 1836, and when it opened carriages were separated from their engines and lowered to Lime Street station by gravity, their descent controlled by brakemen, and hauled back up to Edge Hill by rope from a stationary engine. The tunnel is approximately 1811 metres (1980 yards) long. |
||
On [[30 July]] [[1842]] work started to extend the line from Ordsall Lane to the new Manchester Victoria station. The extension was opened on [[4 May]] [[1844]] and Liverpool Road closed. |
On [[30 July]] [[1842]] work started to extend the line from Ordsall Lane to the new Manchester Victoria station. The extension was opened on [[4 May]] [[1844]] and Liverpool Road closed. |
||
Line 52: | Line 52: | ||
=== Pioneer === |
=== Pioneer === |
||
Being one of the first railways, many lessons had to be learnt from experience, but not many passengers were killed except by their own negligence. The |
Being one of the first railways, many lessons had to be learnt from experience, but not many passengers were killed except by their own negligence. The L&MR developed the practice of red signals for stop, green for caution and white for clear, which spread by the early 1840s to other railways in Britain and the United States. These colours later changed to the more familiar red, yellow and green. The L&MR was also responsible for the [[Standard gauge|gauge]] of 4' 8½", or 1435mm), which came to be used more or less universally. |
||
In [[1845]] the |
In [[1845]] the L&MR was absorbed by its principal business partner, the [[Grand Junction Railway]]; the following year the GJR formed part of the [[London and North Western Railway]]. |
||
==Modern Line== |
==Modern Line== |
||
The original Liverpool and Manchester line still operates |
The original Liverpool and Manchester line still operates as a secondary line between the two cities - the former [[Cheshire Lines Committee]] route via [[Warrington Central railway station|Warrington Central]] is the busier route. A stopping service operates between [[Manchester Victoria station|Manchester Victoria]] and [[Lime Street Station|Liverpool Lime Street]], while a fast service leaves from [[Manchester Piccadilly railway station|Manchester Piccadilly]]. |
||
Services are described in detail in the [[Liverpool to Manchester Line]] article. |
Services are described in detail in the [[Liverpool to Manchester Line]] article. |
||
Line 64: | Line 64: | ||
== Stations == |
== Stations == |
||
*'''[[Lime Street Station|Lime Street]]''' (work started on Edge Hill - Lime Street tunnel [[23 May]] [[1832]]; opened [[15 August]] [[1836]]) |
*'''[[Lime Street Station|Lime Street]]''' (work started on Edge Hill - Lime Street tunnel [[23 May]] [[1832]]; opened [[15 August]] [[1836]]) |
||
*[[Crown Street railway station|Crown Street]] (original Liverpool terminus |
*[[Crown Street railway station|Crown Street]] (original Liverpool terminus, replaced by Lime Street; |
||
*'''[[Edge Hill railway station|Edge Hill]]''' (at first Edge Hill linked |
*'''[[Edge Hill railway station|Edge Hill]]''' (at first Edge Hill linked Wapping Dock to the L&MR; Wapping Tunnel opened in 1829). It was also the site of its [[Edge Hill railway works|locomotive works]]. |
||
*'''[[Wavertree Technology Park railway station|Wavertree Technology Park]]''' ( |
*'''[[Wavertree Technology Park railway station|Wavertree Technology Park]]''' (opened in 1990s) |
||
*'''[[Broad Green railway station|Broad Green]]''' |
*'''[[Broad Green railway station|Broad Green]]''' |
||
*'''[[Roby railway station|Roby]]''' |
*'''[[Roby railway station|Roby]]''' |
||
Line 72: | Line 72: | ||
*'''[[Whiston railway station|Whiston]]''' |
*'''[[Whiston railway station|Whiston]]''' |
||
*'''[[Rainhill railway station|Rainhill]]''' |
*'''[[Rainhill railway station|Rainhill]]''' |
||
*'''[[Lea Green railway station|Lea Green]]''' (closed and |
*'''[[Lea Green railway station|Lea Green]]''' (closed and re-opened with a completely new station in [[2000]]) |
||
*'''[[St Helens Junction railway station|St Helens Junction]]''' (opened |
*'''[[St Helens Junction railway station|St Helens Junction]]''' (opened between 1833 and 1837; junction with the [[St Helens and Runcorn Gap Railway]]) |
||
*Collins Green |
*Collins Green |
||
*'''[[Earlestown railway station|Earlestown]]''' (built in 1831 by the [[Warrington and Newton Railway]] company; originally named Newton Junction; renamed |
*'''[[Earlestown railway station|Earlestown]]''' (built in 1831 by the [[Warrington and Newton Railway]] company; originally named Newton Junction; renamed after 1837) |
||
*'''[[Newton-le-Willows railway station|Newton-le-Willows]]''' (originally named Newton Bridge; renamed after Newton Junction was renamed Earlestown) |
*'''[[Newton-le-Willows railway station|Newton-le-Willows]]''' (originally named Newton Bridge; renamed after Newton Junction was renamed Earlestown) |
||
*Parkside (in 1833 the line to Wigan was opened) |
*Parkside (in 1833 the line to Wigan was opened) |
||
*Kenyon Junction (built |
*Kenyon Junction (built between 1833 and 1837; junction with the ''[[Bolton and Leigh Railway]]''; closed [[2 January]] [[1961]]) |
||
*Glazebury & Bury Lane (closed [[7 July]] [[1958]]) |
*Glazebury & Bury Lane (closed [[7 July]] [[1958]]) |
||
*Astley (closed [[2 May]] [[1956]]) |
*Astley (closed [[2 May]] [[1956]]) |
||
Line 87: | Line 87: | ||
*'''[[Patricroft railway station|Patricroft]]''' |
*'''[[Patricroft railway station|Patricroft]]''' |
||
*'''[[Eccles railway station|Eccles]]''' |
*'''[[Eccles railway station|Eccles]]''' |
||
*Weaste (closed [[19 October]] [[1942]]; destroyed when M602 built) |
*Weaste (closed [[19 October]] [[1942]]; destroyed when M602 road built) |
||
*Seedley (closed [[2 January]] [[1956]]; destroyed when M602 built) |
*Seedley (closed [[2 January]] [[1956]]; destroyed when M602 road built) |
||
*Cross Lane (closed [[15 August]] [[1949]]; destroyed when M602 built) |
*Cross Lane (closed [[15 August]] [[1949]]; destroyed when M602 road built) |
||
*Ordsall Lane (work on extension of line to Manchester Victoria started [[30 July]] [[1842]] and the extension opened on [[4 May]] [[1844]]; station closed [[4 February]] [[1957]]) |
*Ordsall Lane (work on extension of line to Manchester Victoria started [[30 July]] [[1842]] and the extension opened on [[4 May]] [[1844]]; station closed [[4 February]] [[1957]]) |
||
*Liverpool Road (original Manchester terminus, closed [[4 May]] [[1844]]) |
*Liverpool Road (original Manchester terminus, closed [[4 May]] [[1844]]) |
||
*Exchange Station (closed [[5 May]] [[1969]]) |
*Exchange Station (closed [[5 May]] [[1969]]) |
||
*'''[[Manchester Victoria station|Victoria]]''' (opened in 1844 |
*'''[[Manchester Victoria station|Victoria]]''' (opened in 1844) |
||
(stations still open in bold) |
(stations still open in bold) |
||
Line 99: | Line 99: | ||
== Bibliography == |
== Bibliography == |
||
*''The Last Journey of William Huskisson: The Day the Railway Came of Age''; Simon Garfield (UK 2002); ISBN 0571210481 |
*''The Last Journey of William Huskisson: The Day the Railway Came of Age''; Simon Garfield (UK 2002); ISBN 0571210481 |
||
* Ransom, P.J.G., (1990) ''The Victorian Railway and How It Evolved,'' London: Heinemann |
* Ransom, P. J. G., (1990) ''The Victorian Railway and How It Evolved,'' London: Heinemann |
||
[[Category:Grand Junction Railway]] |
[[Category:Grand Junction Railway]] |
Revision as of 09:32, 26 June 2006
It has been suggested that Liverpool and Manchester Railway Company be merged into this article. (Discuss) |
The Liverpool and Manchester Railway (L&MR) was the world's first intercity passenger railway in which all the trains were timetabled and operated for most of the distance solely by steam locomotives. (The Stockton and Darlington Railway opened in 1825, but sections of this line employed cable haulage, and only the coal trains were hauled by locomotives. Horse-drawn traffic could use the railway upon payment of a toll.) The LMR was primarily built to provide faster transport of raw materials and finished goods between the port of Liverpool and mills in Manchester in north-west England.
Historic Line
Up to Construction
The L&MR was intended to achieve cheap transport of raw materials and finished goods between Manchester and its natural port outlet; Liverpool. The existing means of water transport, the Mersey and Irwell Navigation and the Bridgewater Canal, dated from the previous century, and were felt to be making excessive profits from the existing trade and throttling the growth of Manchester. (Similar feelings with regard to the railways led in turn to the construction of the Manchester Ship Canal in the 1890s). There was support for the railway from the cities at either end, but opposition from the landowners over whose land the railway was proposed to pass.
The original promoters are usually ackowledged to be Joseph Sandars, a rich Liverpool corn merchant, and John Kennedy, then owner of the largest spinning mill in Manchester. They were influenced by the writings of William James. Now something pf a forgotten figure, James was a land surveyor who had made a fortune in property speculation. He advocated a national network of 'railways', based upon what he had seen of the development of colliery lines and locomotive technology in the north of England.
The initial survey for the line was carried out by William James and Robert Stephenson and, being done surreptitiously and/or by trespass, was defective. Robert departed for South America and William James became bankrupt. Consequently, in 1824 George Stephenson was appointed engineer in their place. By this time, he was taking on too much. As Robert was absent, George (who could not do the calculations required, and had relied on his son for this part of the business) left checking the survey to subordinates. Upon presentation to Parliament in 1825 it was shown to be inaccurate (particularly in relation to the Irwell bridge), and the first Bill was thrown out. A key opposition figure in this had been G. H. Bradshaw, one of the trustees of the Marquess of Stafford's Worsley estate, which included the Bridgewater Canal.
In place of Stephenson, who was now in disgrace, the railway promoters appointed George and John Rennie as engineers, who chose C. B. Vignoles as their surveyor. They also set out to placate the canal interests and had the good fortune to be able to approach the Marquess directly through the good offices of their counsel, Mr. Adam, who was a relative of one of the trustees, and the support of William Huskisson who knew the Marquess personally. Implacable opposition to the line changed to financial support, a considerable coup.
The second Bill received the Royal Assent in 1826, and was for a railway on a considerably different alignment, avoiding the properties of particularly vociferous or effective opponents of the previous Bill, but as a consequence facing the challenge of crossing Chat Moss bog. It was intended to place the Manchester terminus on the Salford side of the river, but the Mersey and Irwell Navigation withdrew their opposition to a crossing of their river at the last moment, in return for access for their carts to the intended railway bridge. The Manchester station was thus fixed at Liverpool Road in the heart of Castlefield.
Construction
The terms asked for by the Rennies proving unnacceptable, George Stephenson was reappointed as engineer with his assistant Joseph Locke. Previous experience with civil engineers set Stephenson against allowing Vignoles to continue his survey and he resigned. L. T. C. Rolt in his biography of Stephenson suggests that a faction on the Board continued to ask Stephenson for second opinions, and Rennie took umbrage at this. Vignoles may have resigned because he had been appointed by Rennie, and as an ex-army engineer thought it the honourable thing to do.
The 35-mile line was a remarkable engineering achievement for its time, beginning with the 2250-yard Wapping Tunnel beneath Liverpool from the docks to Edge Hill. Following this was a two mile-long-cutting, up to 70 feet deep, through rock at Olive Mount, and a nine 50-foot span arch viaduct over the Sankey Brook Valley, around 70 feet high. Not least was the famous 4.75-mile crossing of Chat Moss.
Having found it impossible to drain the bog, Stephenson began constructing a large number of wooden and heather hurdles, which were sunk into the bog using stones and earth until they could provide a solid foundation - it was reported that at one point tipping went on solidly for weeks until such a foundation had been created. To this day the track across Chat Moss floats on the hurdles that Stephenson's men laid and if one stands near the lineside one can feel the ground move as a train passes. It is worthy of note that the line now supports locomotives 25times the weight of the Rocket, which hauled the first experimental train over the moss in January 1830.
The line was laid using 15-foot fish-belly rails at 35 lb. per yard, laid either on stone blocks or wooden sleepers.
Cable or locomotive haulage
In 1829 adhesion-worked locomotives had not proved particularly reliable. The experience on the Stockton and Darlington Railway was well-publicised, and a section of the Hetton colliery railway had been converted to cable haulage. The success of the latter method was undisputable, while the steam locomotive was still untried. The L&MR had sought to de-emphasise the use of them during the passage of the bill, the public having become alarmed at the idea of these monstrous machines which, if they did not explode, would fill the countryside with noxious fumes. Moreover, attention was turning towards steam road carriages, such as those of Goldsworthy Gurney. There was thus a division in the L&MR board between those who supported Stephenson's "loco-motive" and those who favoured cable haulage, the latter supported by the opinion of the engineer, John Rastrick. Stephenson was not averse to cable haulage - he continued to build such lines where he felt it appropriate - but knew its main disadvantage, that any breakdown anywhere would paralyse the whole line.
The gradient profile of the line had been arranged so as to concentrate the steep grades in three places (either side of Rainhill at 1 in 100 and down to the docks at Liverpool at 1 in 50) and make the rest of the line very gently graded, say 1 in 2000. To determine whether and which locomotives would be suitable, the directors organised the Rainhill Trials. When the line opened the final passenger section from Edge Hill to Crown Street railway station was cable hauled as was the section down the Wapping Tunnel.
Double track
The line was built as double track. Firstly, there was no convenient means of operating the line as single track as the line predated the telegraph. Secondly, the amount of traffic was expected to require double track.
A decision had to be made about how far apart the rails of the double track should be. It was decided to make the space between the separate tracks the same as the track gauge itself, so that is would be possible to operate over-gauge trains up the middle, something which probably never happened. In later years, it was decided that the tracks were too close together, restricting the width of the trains, so the gap between tracks was widened.
Opening
The line opened on September 15, 1830 with termini at Liverpool Road, Manchester (now part of the Museum of Science and Industry in Manchester) and Edge Hill, Liverpool. The festivities of the opening day were marred when William Huskisson, the popular Member of Parliament for Liverpool, seized the opportunity of a temporary halt to alight and talk to the Duke of Wellington, then Prime Minister, through the Duke's carriage window. Standing on the permanent way, he misjudged the speed of the approaching Rocket and was run over, becoming the world's first railway passenger fatality. (He was not killed instantly; the locomotive Northumbrian was detached from the Duke's train and rushed him to Eccles, where he died in the vicarage). The somewhat subdued party proceeded to Manchester, where, the Duke being deeply unpopular with the labouring classes, they were given a lively reception (bricks thrown, etc), and returned to Liverpool.
Notwithstanding the unfortunate start to its career, the L&MR was very successful. Within a few weeks of opening it ran its first excursion trains, carried the first mails, and was conveying road-rail containers for Pickfords; by the summer of 1831 it was carrying tens of thousands by special trains to Newton Races.
Although the Act had allowed for it to be used by private carriers paying a toll, from the start the company decided to own and operate the trains itself. Although the original intention had been to carry goods, the canal companies reduced their prices, (an indication that, perhaps the railwaymen had been right to suggest their charges were excessive) and the extra transit time was acceptable in most cases. In fact the line did not start carrying goods until December, when the first of some more powerful engines, "Planet", was delivered. What was not expected was the line's success in carrying passengers. The experience at Rainhill had shown that uprecedented speed could be achieved. The train was also cheaper and more comfortable than travel by road. So, at first, the company concentrated on this, a decision that had repercussions across the country and triggered the "railway mania".
Initially trains travelled at 17 mph, due the limitations of the track. Drivers could, and did, travel more quickly, but they would be reprimanded. By 1840, the track seems to have been largely replaced by parallel rail of 60-75 lb. per yard, with wooden sleepers.
The tunnel from Lime Street to Edge Hill was fully completed in 1836, and when it opened carriages were separated from their engines and lowered to Lime Street station by gravity, their descent controlled by brakemen, and hauled back up to Edge Hill by rope from a stationary engine. The tunnel is approximately 1811 metres (1980 yards) long.
On 30 July 1842 work started to extend the line from Ordsall Lane to the new Manchester Victoria station. The extension was opened on 4 May 1844 and Liverpool Road closed.
Pioneer
Being one of the first railways, many lessons had to be learnt from experience, but not many passengers were killed except by their own negligence. The L&MR developed the practice of red signals for stop, green for caution and white for clear, which spread by the early 1840s to other railways in Britain and the United States. These colours later changed to the more familiar red, yellow and green. The L&MR was also responsible for the gauge of 4' 8½", or 1435mm), which came to be used more or less universally.
In 1845 the L&MR was absorbed by its principal business partner, the Grand Junction Railway; the following year the GJR formed part of the London and North Western Railway.
Modern Line
The original Liverpool and Manchester line still operates as a secondary line between the two cities - the former Cheshire Lines Committee route via Warrington Central is the busier route. A stopping service operates between Manchester Victoria and Liverpool Lime Street, while a fast service leaves from Manchester Piccadilly.
Services are described in detail in the Liverpool to Manchester Line article.
Stations
- Lime Street (work started on Edge Hill - Lime Street tunnel 23 May 1832; opened 15 August 1836)
- Crown Street (original Liverpool terminus, replaced by Lime Street;
- Edge Hill (at first Edge Hill linked Wapping Dock to the L&MR; Wapping Tunnel opened in 1829). It was also the site of its locomotive works.
- Wavertree Technology Park (opened in 1990s)
- Broad Green
- Roby
- Huyton
- Whiston
- Rainhill
- Lea Green (closed and re-opened with a completely new station in 2000)
- St Helens Junction (opened between 1833 and 1837; junction with the St Helens and Runcorn Gap Railway)
- Collins Green
- Earlestown (built in 1831 by the Warrington and Newton Railway company; originally named Newton Junction; renamed after 1837)
- Newton-le-Willows (originally named Newton Bridge; renamed after Newton Junction was renamed Earlestown)
- Parkside (in 1833 the line to Wigan was opened)
- Kenyon Junction (built between 1833 and 1837; junction with the Bolton and Leigh Railway; closed 2 January 1961)
- Glazebury & Bury Lane (closed 7 July 1958)
- Astley (closed 2 May 1956)
- Flow Moss Cottage (closed 1842)
- Lamb's Cottage (closed 1842)
- Barton Moss 1st (closed 1 May 1862)
- Barton Moss 2nd (closed 23 September 1929)
- Patricroft
- Eccles
- Weaste (closed 19 October 1942; destroyed when M602 road built)
- Seedley (closed 2 January 1956; destroyed when M602 road built)
- Cross Lane (closed 15 August 1949; destroyed when M602 road built)
- Ordsall Lane (work on extension of line to Manchester Victoria started 30 July 1842 and the extension opened on 4 May 1844; station closed 4 February 1957)
- Liverpool Road (original Manchester terminus, closed 4 May 1844)
- Exchange Station (closed 5 May 1969)
- Victoria (opened in 1844)
(stations still open in bold)
Bibliography
- The Last Journey of William Huskisson: The Day the Railway Came of Age; Simon Garfield (UK 2002); ISBN 0571210481
- Ransom, P. J. G., (1990) The Victorian Railway and How It Evolved, London: Heinemann