Jump to content

Heathcote railway line: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
O'Keefe Rail Trail
Line 33: Line 33:
==Today==
==Today==


The original line may have been ripped up, but there are few instances where the original track still remains.
The original line may have been ripped up, but there are few instances where the original track still remains. It now makes up the [[O'Keefe Rail Trail]]


==References==
==References==

Revision as of 10:50, 22 May 2024

The Heathcote railway line was a cross-country link between Bendigo and Heathcote Junction. It was partly opened in 1888 and, by 1890, it was fully operational.[1] It was partially closed in 1958 and fully closed in 1968.

In 1975, it was decided to dismantle the track and, today, only some trestle bridges remain.[2]

History

The line was authorised by the Victorian Parliament in 1881, and construction began in 1888.[citation needed] The first section, between Heathcote and Bendigo opened in October 1888, and the entire line became operational in August 1890.[3] Including 50 bridges, the line took 21 months to complete, at a cost of 88,409 pounds, with two derailments during the process.[4]

Stations

The line had the following stations:[1]

Today

The original line may have been ripped up, but there are few instances where the original track still remains. It now makes up the O'Keefe Rail Trail

References

  1. ^ a b Wallan - Bendigo Victorian Railways Grades Book
  2. ^ Bendigo - Kilmore Friends of the Bendigo - Kilmore rail trail
  3. ^ Harrigan, Leo J. (1962). Victorian Railways to ‘62. Melbourne: Victorian Railways Public Relations and Betterment Board. p. 283.
  4. ^ O'Keefe Rail Trail Heathcote stories
  5. ^ "Strathfieldsaye Detail". VK3CKC. Retrieved 16 April 2023.