A596 road: Difference between revisions
Added the junction with the B5300 near Maryport. |
Rescuing 1 sources and tagging 0 as dead. #IABot (v1.2.4) |
||
Line 18: | Line 18: | ||
==Incidents== |
==Incidents== |
||
===November 2009 Great Britain and Ireland floods=== |
===November 2009 Great Britain and Ireland floods=== |
||
Workington Bridge on the A596 was closed after the [[November 2009 Great Britain and Ireland floods]] as were many other roads across the [[River Derwent, Cumbria|River Derwent]]. A temporary station, called [[Workington North railway station|Workington North]] was constructed north of the Derwent to provide access to the town to those cut off by road.<ref>{{ cite web | url=http://www.networkrailmediacentre.co.uk/content/Detail.aspx?ReleaseID=4831&NewsAreaID=2 | title=NETWORK RAIL TO BUILD NEW TEMPORARY STATION TO HELP WORKINGTON FLOOD VICTIMS | accessdate=2009-11-24 }}</ref> |
Workington Bridge on the A596 was closed after the [[November 2009 Great Britain and Ireland floods]] as were many other roads across the [[River Derwent, Cumbria|River Derwent]]. A temporary station, called [[Workington North railway station|Workington North]] was constructed north of the Derwent to provide access to the town to those cut off by road.<ref>{{ cite web | url={{cite web|url=http://www.networkrailmediacentre.co.uk/content/Detail.aspx?ReleaseID%3D4831%26NewsAreaID%3D2 |title=Archived copy |accessdate=2012-03-02 |deadurl=yes |archiveurl=https://web.archive.org/web/20120229182606/http://www.networkrailmediacentre.co.uk/content/Detail.aspx?ReleaseID=4831&NewsAreaID=2 |archivedate=29 February 2012 |df=dmy }} | title=NETWORK RAIL TO BUILD NEW TEMPORARY STATION TO HELP WORKINGTON FLOOD VICTIMS | accessdate=2009-11-24 }}</ref> |
||
==References== |
==References== |
Revision as of 23:10, 30 September 2016
A596 | |
---|---|
Major junctions | |
From | A595 in Thursby |
To | A595 in Workington |
Location | |
Country | United Kingdom |
Road network | |
The A596 is a primary route in Cumbria, in northern England, that runs between Thursby (5 miles (8.0 km) north-east of Wigton) and Workington. For its entirety the A596 parallels the A595, and meets the A595 at both ends. The A596 begins its course at a roundabout junction with the A595 at Thursby, before continuing past the towns of Wigton and Aspatria. As it travels further towards the coast, it reaches the town of Maryport, where there is a junction to the B5300 heading up the coast to Silloth via Allonby, Mawbray, and Beckfoot. It then crosses over the River Derwent, skirting the eastern edge of Workington shortly before terminating at the junction with the A595 at Lillyhall.
Incidents
November 2009 Great Britain and Ireland floods
Workington Bridge on the A596 was closed after the November 2009 Great Britain and Ireland floods as were many other roads across the River Derwent. A temporary station, called Workington North was constructed north of the Derwent to provide access to the town to those cut off by road.[1]
References
- ^ ["Archived copy". Archived from the original on 29 February 2012. Retrieved 2012-03-02.
{{cite web}}
: Unknown parameter|deadurl=
ignored (|url-status=
suggested) (help)CS1 maint: archived copy as title (link) "NETWORK RAIL TO BUILD NEW TEMPORARY STATION TO HELP WORKINGTON FLOOD VICTIMS"]. Retrieved 24 November 2009.{{cite web}}
: Check|url=
value (help); templatestyles stripmarker in|url=
at position 1 (help)
External links
54°45′44″N 3°20′20″W / 54.7621°N 3.3390°W