Jump to content

Sasang–Hadan Line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ZandDev (talk | contribs) at 14:26, 5 May 2022 (line not opened: lightgrey background, typo). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Sasang–Hadan Line
Overview
StatusUnder construction
LocaleBusan, South Korea
Termini
Stations6 (Phase 1), 13 (Phase 2)
Service
SystemBusan Metro
History
Planned openingIndefinite postponement due to landslides
Technical
Line length6.9 km (4.3 mi)
CharacterUnderground automated light metro

Sasang–Hadan Line is a prospective light metro line in Busan, South Korea. The first phase will connect Sasang Station to Hadan Station. It is highly likely to open under the name "Line 5".

Infrastructure

All stations will have elevators, escalators, and platform screen doors. The line will be equipped for unmanned automatic operation and will have a central control system for management of the entire line, eliminating the need for staff to be present at stations. Construction began in 2016 and is expected to be completed in 2023 with total operating expenses of 73.2 billion won.[1]

Stations

Station
Number
Station name Transfer Distance
in km
Total
distance
Location
English Hangul Hanja
501 Sasang 사상 Busan–Gimhae Light Rail Transit - 0.0 Busan Sasang District
502 - -
503 - -
504 - -
505 - - Saha District
506 Hadan 하단 6.90

See also

References

  1. ^ "˝사상~하단선 3공구 재입찰˝ 부산교통공사의 형식적인 쇼". 국제신문.