Zhuanqiao station
Appearance
General information | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Location | Humin Road and Zhuanxing Road (颛兴路) Zhuanqiao, Minhang District, Shanghai China | ||||||||||
Coordinates | 31°04′07″N 121°23′49″E / 31.0686°N 121.397°E | ||||||||||
Operated by | Shanghai No. 1 Metro Operation Co. Ltd. | ||||||||||
Line(s) | Line 5 | ||||||||||
Platforms | 2 (2 side platforms) | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Structure type | Elevated | ||||||||||
Accessible | Yes | ||||||||||
History | |||||||||||
Opened | 25 November 2003 | ||||||||||
Services | |||||||||||
| |||||||||||
|
Zhuanqiao (simplified Chinese: 颛桥; traditional Chinese: 顓橋; pinyin: Zhuānqiáo) is an above-ground station on Line 5 of the Shanghai Metro. Located at the intersection of Humin Highway and Zhuanxing Road in the city's Minhang District, the station opened with the rest of the first phase of Line 5 on 25 November 2003.[1] Between 28 December 2018 and 26 December 2020, passengers who wish to travel to stations on the branch line of Line 5 between Dongchuan Road and Minhang Development Zone stations must transfer to four-car trains at Dongchuan Road station.[2] Since 26 December 2020, both the main and the branch line trains run all the way to Xinzhuang with no shuttle service.
References
- ^ Shanghai Morning Post (2003-11-25). "轻轨莘闵线今正午首发 与1号线换乘暂不能ណាំងប៉ូ一票通". Sina (in Chinese). Retrieved 2018-12-26.
- ^ Shanghai Shentong Metro Group Co., Ltd. (2018-08-15). "5号线南延伸工程年底通车 既有线信号系统等同步升级". Shanghai Metro (in Chinese). Retrieved 2018-12-26.