Jump to content

Hitahikosan Line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 106.154.135.51 (talk) at 11:50, 14 July 2023 (Added BRT in Japan category). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Hitahikosan Line
Overview
Native name日田彦山線
StatusIn operation (as a railway between Jōno and Soeda)
(as a bus route between Soeda and Yoake)
OwnerJR Kyushu
LocaleKyushu
Termini
Stations23
Service
TypeRegional rail
Operator(s)JR Kyushu
Rolling stockKiHa 40 series DMU
History
Opened1899
Technical
Line length68.7 km (42.7 mi)
Number of tracksEntire line single tracked
CharacterMostly rural with a few urban areas
Track gauge1,067 mm (3 ft 6 in)
ElectrificationNone
Operating speed85 km/h (53 mph)
Route map
Hitahikosan Line

The Hitahikosan Line (日田彦山線, Hitahikosan-sen) is a railway line in Japan, operated by Kyushu Railway Company (JR Kyushu). It connects Jōno Station in Kitakyushu, Fukuoka Prefecture with Yoake Station in Hita, Ōita Prefecture and features the 4380 m Shakadake Tunnel between Chikuzen Iwaya and Hikosan station, where a fatal tunnel collapse occurred during construction in 1953, killing 21 construction workers. The line is named after Hita and Mount Hiko.

Stations

●: Stops, |: non-stop
No. Station Distance
(km)
Rapid Transfers Location
JF Nippō Main Line
JI  01  Kokura 小倉 Kokuraminami-ku, Kitakyūshū
JI  02  Nishi-Kokura 西小倉
JI  03  Minami-Kokura 南小倉
JI Hitahikosan Line
JI  04  Jōno 城野 0.0 Nippō Main Line Kokuraminami-ku, Kitakyūshū Fukuoka Prefecture
JI  05  Ishida 石田 3.3  
JI  06  Shii-Kōen 志井公園 5.1 Kitakyushu Monorail (Kikugaoka Station) - 400 m away
JI  07  Shii 志井 6.8  
JI  08  Ishiharamachi 石原町 9.0  
JI  09  Yobuno 呼野 12.3  
JI  10  Saidōsho 採銅所 18.1   Kawara
JI  11  Kawara 香春 23.4  
JI  12  Ipponmatsu 一本松 25.0  
JI  13  Tagawa-Ita 田川伊田 27.4 Heisei Chikuhō Railway Ita Line, Tagawa Line Tagawa
JI  14  Tagawa-Gotōji 田川後藤寺 30.0 Gotōji Line
Heisei Chikuhō Railway Itoda Line
Ikejiri 池尻 32.2   Kawasaki
Buzen-Kawasaki 豊前川崎 34.7  
Nishi-Soeda 西添田 38.3   Soeda
Soeda 添田 39.5  
Kanyūsha-Hikosan 歓遊舎ひこさん 41.6    
Buzen-Masuda 豊前桝田 43.2    
Hikosan 彦山 47.2    
Chikuzen-Iwaya 筑前岩屋 55.1     Tōhō
Daigyōji 大行司 59.3    
Hōshuyama 宝珠山 61.3    
Ōtsuru 大鶴 62.9     Hita Ōita Prefecture
Imayama 今山 65.4    
Yoake 夜明 68.7   Kyūdai Main Line

History

The Toyo-shu Railway Co. opened the Tagawa-Ita - Buzen Kawasaki section as part of the Tagawa Line in 1899. That company merged with the Kyushu Railway Company in 1901, which extended the line to Soeda in 1903. The company was nationalised in 1907.

The Jono - Tagawa-Ita section was opened in 1915 by the Kokura Railway Co., that company being nationalised in 1943. The Soeda - Daigyoji section opened between 1937 and 1946, and the Daigyoji - Yoake section opened in 1956.

CTC signalling was introduced on the entire line in 1984. Freight service ceased beyond Tagawa-Gotōji in 1986, and totally in 1999.

Typhoon damage

On 5 July 2017, torrential rainfall resulted in the closure of the section of the line between Soeda and Yoake. The damage was severe and included the destruction of several bridges and parts of the track being washed away. The line remained disconnected as of the start of 2020. On 12 February 2020, it was proposed by JR Kyushu to not restore the rail service, due to low passenger use and high maintenance costs, and permanently replace it with bus rapid transit (BRT).[1] JR Kyushu has formally announced that agreements have been made with local authorities, and the line will be replaced with BRT.[2] The BRT route is estimated to be completed by 2023. On 25 April 2023, the opening date for the BRT replacement was revised to take place on 28 August of that year.[3]

Former connecting lines

Buzen Kawasaki Station: The 26 km Kamiyamada Line opened from Iizuka (on the Chikuho Main Line) to Shimoyamada in 1898, extended to Kamiyamada in 1929 and to Buzen Kawasaki (as a passenger-only section) in 1966. Freight services ceased in 1980, and the line closed in 1988. This line had two connections:

  • A 2 km 3 ft (914 mm) gauge line from Okuma (16 km from Buzen Kawasaki) - Okumamachi operated between 1924 and 1933.
  • The 8 km Urushio line from Shimokamoo (14 km from Buzen Kawasaki) - Shimayamada (connecting to the Gotoji Line) opened in 1943, and closed in 1986.

Soeda station - The Ogura Railway Co. opened a line to Ipponmatsu in 1915. The line was nationalised in 1943 and closed in 1985.

References

  1. ^ "一部不通の日田彦山線 Jr九州が新たな「Brt復旧案」提示 九州北部豪雨で被災".
  2. ^ News about formally agreement
  3. ^ "JR日田彦山線「BRT」新路線 8月28日開業で調整" [Hitahikosan BRT line revised to open on 28 August 2023]. Nihon Keizai Shimbun WEB. 25 April 2023. Retrieved 26 April 2023.

This article incorporates material from the corresponding article in the Japanese Wikipedia.