Jump to content

Kadapa Feeder Road

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by InternetArchiveBot (talk | contribs) at 06:33, 12 February 2020 (Rescuing 2 sources and tagging 0 as dead.) #IABot (v2.0). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Kadapa Feeder Expressway
Route information
Length104.05 km (64.65 mi)
Major junctions
North endAmaravati Anantapur Expressway
South endKadapa
Location
CountryIndia
StateAndhra Pradesh
Major citiesAmaravathi, Kadapa
Highway system
State Highways in Andhra Pradesh

Kadapa Feeder Expressway is a proposed greenfield expressway road in the Indian state of Andhra Pradesh.[1][2] It is being built by the National Highways Authority of India under Phase–VII of National Highways Development Project.

The project

The cost of project is expected to be 27,635 crore (equivalent to 400 billion or US$4.8 billion in 2023).[3] It would cut travel time between Amaravathi and Kadapa by 70 minutes. The expressway will be 4-lane wide with service roads.It was proposed that this road will be designed for a speed of 120 kmph with straight alignments, avoiding habitations and locations of archaeological and religious importance. Tunnels and viaducts are proposed to be constructed to avoid hilly terrains and valley sections.[4] The Express-way will carry all public amenities viz. under passes, service roads, provision for green belt, rest houses, petrol pumps, service centres, restaurants and four agricultural mandis for milk, potatoes, grains, fruits and vegetables etc.

Route

The expressway would stretch for a length of 104.05 km (64.65 mi) and include 36.71 km (22.81 mi) of service road. It will be connected to Amaravati Anantapur Expressway from Kadapa.It will have a total length of 4 Major bridges, 1 Railway Over Bridges, 4 Interchanges, and 2 km Length of Tunnel.[5]

References

  1. ^ "Greenfield Expressway (Anantapur to Amaravati)". Andhra Pradesh Road Development Corporation. Roads and Buildings Department. Archived from the original on 26 October 2017. Retrieved 9 November 2016.
  2. ^ "Amaravati-Anantapur highway to cost Rs 27,635 crore". Vijayawada: Deccan Chronicle. 4 October 2016. Retrieved 9 November 2016.
  3. ^ "Amaravati-Anantapur highway to cost Rs 27,635 crore". deccanchronicle.com/. 4 October 2016. Retrieved 9 November 2016.
  4. ^ "Amaravati-Anantapur highway to cost Rs 27,635 crore".
  5. ^ "Green Field Express Way (Anantapur to Amaravati)". Archived from the original on 26 October 2017. Retrieved 10 November 2016.