Jump to content

Pemalang-Batang Toll Road

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Costialla1403 (talk | contribs) at 19:29, 22 February 2020. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Pemalang-Batang Toll Road
Pematang Toll Road
Trans-Java Toll road en.svg
Route information
Part of AH2
Maintained by PT Pemalang Batang Tol Road
Length39 km (24 mi)
Major junctions
FromPemalang
Major intersectionsBatang-Semarang Toll Road
Pejagan–Pemalang toll road
ToBatang
Location
CountryIndonesia
Major citiesPekalongan, Pemalang
Highway system

Pemalang-Batang Toll Road or abbreviated to Pematang Toll Road, is a 39.2 kilometer highway that connects Pemalang area with Batang, Central Java, Indonesia. This toll road is part of Trans-Java Expressway which will connect Merak to Banyuwangi of the island of Java. The toll road is fully opened on November 9, 2018 by 7th President of Indonesia Joko Widodo.[1][2]

Sections

This toll road has two sections:[3]

  • Section I: (Pemalang - Pekalongan), length 20,05
  • Section II: (Pekalongan - Batang), length 16,7 km.

Toll gates

Name km Destination
Pemalang 306 Pantura
Pekalongan 326 Pekalongan
Batang
Batang 343 Batang
Kendel
Semarang
Batang-Semarang Toll Road

References

  1. ^ "Jokowi to Open 2 Toll Roads in Central Java Today". Tempo. Retrieved 9 November 2017.
  2. ^ "Proyek Jalan Tol Pemalang-Batang Bisa Dilintasi Lebaran 2017". Tempo. Retrieved 23 December 2017.
  3. ^ "Merak-Semarang Tersambung Tol Lebaran 2017, Begini Kondisi Lahannya". Detik. Retrieved 23 December 2017.