Jump to content

Line 1 (Nanchang Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by WOSlinkerBot (talk | contribs) at 21:46, 20 June 2020 (remove un-needed options from tables). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 1
 1 
Overview
Native name南昌地铁1号线
StatusOperational
LocaleNanchang, Jiangxi, China
Termini
Stations24 (Phase 1)
Service
TypeRail Transit
SystemNanchang Metro
Depot(s)Jiaoqiao Train Shed
Yaohu MPD[1][2]
Rolling stock6-car Type B
History
Opened26 December 2015; 8 years ago (2015-12-26)
Technical
Line length28.737 km (17.856 mi)
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead catenary,DC 1500 V
Operating speed80 km/h (50 mph)
Route map

Shuanggang
Kongmuhu Lake
Changjiang Road
Zhujiang Road
South Lushan Avenue
Lüyin Road
Weidong
Connection to Line 2
Metro Central
 2 
Qiushui Square
Tengwang Pavilion
Wanshou Palace
Bayi Memorial
 3 
Bayi Square
 2 
Dinggong Road North
 4 
Beijing–Kowloon Railway
Shidanan Road
Pengjiaqiao
Xiejiacun
Qingshanhu Avenue
Gaoxin Avenue
Aixihu Lake West
Aixihu Lake East
Taizidian
Olympic Stadium
Yaohu Lake West

Nanchang Metro Line 1 (also known as Nanchang Rail Transit Line 1 in official documents) is the first rail transit line ever constructed in Nanchang and has opened in 2015. The Phase 1 of Line 1 runs from Shuanggang to Olympic Stadium, covered North Nanchang (Changbei, Chinese: 昌北), Old Town and East Nanchang (Changdong, Chinese: 昌东). It is planned in Phase 2 that Line 1 will be extended to Changbei Airport to the northwest and Maqiu (Chinese: 麻丘) to the east.

Introduction

Nanchang Metro Line 1 shapes like the letter 'L', its Phase 1 is 28.737 km in length and includes 24 stations.[3][4] The average distance between stations is 1,251 m.[5] The construction has begun in 2009 and was finished by 2015.[6]

Opening timeline

Segment Commencement Length Station(s) Name
Shuanggang — Yaohu Lake West 26 December 2015 28.737 km (17.86 mi) 24 Phase 1

Route and stations

The Phase 1 of Metro Line 1 is 28.737 km in length and includes 24 stations; further extension has been planned in Phase II.

station name Connections Distance
km
Location
English Chinese
Template:NCM stations 双港 0.00 0.00 Qingshanhu
Template:NCM stations 孔目湖 1.20 1.20
Template:NCM stations 长江路 3.07 4.27
Template:NCM stations 珠江路 1.18 5.45
Template:NCM stations 庐山南大道 1.48 6.93
Template:NCM stations 绿茵路 0.77 7.70
Template:NCM stations 卫东 1.18 8.88
Template:NCM stations 地铁大厦  2  1.00 9.88 Qingshanhu/Donghu/Xinjian
Template:NCM stations 秋水广场 0.82 10.70 Donghu
Template:NCM stations 滕王阁 1.95 12.65 Donghu/Xihu
Template:NCM stations 万寿宫 0.98 13.63
Template:NCM stations 八一馆  3  0.56 14.19
Template:NCM stations 八一广场  2  1.12 15.31
Template:NCM stations 丁公路北 1.00 16.31
Template:NCM stations 师大南路 1.04 17.35
Template:NCM stations 彭家桥  4  0.85 18.20 Qingshanhu
Template:NCM stations 谢家村 0.82 19.02
Template:NCM stations 青山湖大道 0.75 19.77
Template:NCM stations 高新大道  5  1.13 20.90
Template:NCM stations 艾溪湖西 1.33 22.23
Template:NCM stations 艾溪湖东 1.88 24.11 Nanchang Co.
Template:NCM stations 太子殿 1.73 25.84
Template:NCM stations 奥体中心 1.30 27.14
Template:NCM stations 瑶湖西 1.33 28.47

Rolling stock

The line is operated with Type B rolling stock at a maximum speed of 80 km/h. 27 trains of 6-car set, 162 cars in total will be operated at the first stage.[7] These cars are 2.8 m in width, 3.8 m in height and 19 m in length, providing the system with maximum capacity of 30 000 to 55 000 passenger per hour per direction, and minimum service interval of 2 minutes.[8]

Future development

In the initial plan of 2008, Line 1 spanned from Yao Lake (Chinese: 瑶湖) in the east to Lehua (Chinese: 乐化) in the northwest, and is 35 km in length in the long-term plan,[9] which was confirmed in June 2013 again.[10]

  • East extension: Phase 2 extends Line 1 from Olympic Stadium on the west bank of Yao Lake to Maqiu on the east bank. This extension is planned to be 4 km in length, underground, and have 2 stations.
  • North extension: Phase 2 extends Line 1 to Changbei Airport via Lehua.

References

  1. ^ 南昌地铁1号线停车场设在蛟桥镇 建设项目面向全国招标
  2. ^ http://ww3.sinaimg.cn/large/9f5bd91dgw1drtbou74ecj.jpg
  3. ^ 南昌地铁一号线起点站双港大道站 邻近华东交大 Archived 2013-04-25 at archive.today
  4. ^ 南昌地铁1号线两标段招标
  5. ^ 南昌市轨道交通1号线一期工程系统设计06、08、09、11合同段资格预审招标公告 Archived 2015-04-18 at the Wayback Machine
  6. ^ 南昌地铁1号线推迟至2015年底通车 明确11个建设节点
  7. ^ 南昌地铁1号线24个车站确定 将拆除中山桥
  8. ^ 南昌地铁拟采用B型车 单向每小时载乘客5.5万人次
  9. ^ "南昌地铁远景规划征询民意(图)". Archived from the original on 2017-08-31. Retrieved 2013-08-11.
  10. ^ 南昌地铁三四号线拟建19.7公里高架 1号线北延至昌北机场