Jump to content

Verbund Casimcea Wind Farm

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Kingdom(Hearts)Come (talk | contribs) at 00:01, 19 July 2020 (Subcat). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Verbund Casimcea Wind Farm
Country
LocationCasimcea
StatusOperational
Commission date2013
Owner(s)Verbund
Power generation
Units operational88
Nameplate capacity225 MW

The Verbund Casimcea Wind Farm is an operational wind power project located in Tulcea County, Romania. It consists of 88 individual wind turbines with a nominal output 2.5 MW each which will deliver up to 540 GWh of power, enough to power over 350,000 homes, with a capital investment required of approximately €380 million.[1]

References

  1. ^ "Verbund a investit 380 milioane de euro in parcul eolian Casimcea" (in Romanian). business24.ro. 6 June 2013. Retrieved 10 December 2013.