Jump to content

Line 1 (Changsha Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 45.139.212.27 (talk) at 09:23, 20 July 2020. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 1
 1 
Line 1 train arriving at Shangshuangtang station
Overview
StatusOperational
OwnerCity of Changsha
LocaleChangsha, China
Termini
Stations20
Service
TypeRapid transit
SystemChangsha Metro
Services1
Operator(s)Changsha Metro Corporation
History
Opened28 June 2016; 7 years ago (2016-06-28)
Technical
Line length23.55 km (14.63 mi)
Number of tracks2
CharacterUnderground and Elevated
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationThird rail, 1,500 V DC
Route map

Kaifu District Government
Machang
Liuyang River
Beichen Delta
Changsha–Zhuzhou–Xiangtan intercity railway
Kaifu Temple
Wenchangge
Peiyuanqiao
Line 2 (Changsha Metro)
Wuyi Square  2 
Huangxing Square
Nanmenkou
Houjiatang
Nanhu Road
Huangtuling
Line 4 (Changsha Metro)
Huangtuling  4 
Tujiachong
Railway Campus
Youyi Road
Provincial Government
Guihuaping
Datuo
Changsha–Zhuzhou–Xiangtan intercity railway
Xianfeng
Zhongxin Square
Shangshuangtang
Shangshuangtang Depot

Line 1 of the Changsha Metro (Chinese: 长沙地铁1号线; pinyin: Chángshā Dìtiě Yī Hào Xiàn) is a line of the Changsha Metro that runs across Changsha, from Kaifu District Government in the north to Shangshuangtang in the south. It serves 20 stations over 23.55 km, and is coloured red on the system map. It first began operations on June 28, 2016.

History

The first phase of the line, spanning 23.55 km (14.63 mi) from Kaifu District Government to Shangshuangtang, commenced construction work on December 26, 2010. Excavation work was completed on October 2015,[1] and the section was opened on June 28, 2016.[2]

Opening timeline

Segment Commencement Length Station(s) Name
Kaifu District Government — Shangshuangtang 28 June 2016 23.55 km (14.63 mi) 20 Phase 1

Stations

Station name Connections Distance
km
Location
English Chinese
Template:CSM stations 开福区政府 0.00 0.00 Kaifu
Template:CSM stations 马厂 1.70 1.70
Template:CSM stations 北辰三角洲 1.80 3.50
Template:CSM stations 开福寺  CZT  1.70 5.20
Template:CSM stations 文昌阁  6  1.00 6.20
Template:CSM stations 培元桥 0.80 7.00
Template:CSM stations 五一广场  2  1.30 8.30 Kaifu/Furong/Tianxin
Template:CSM stations 黄兴广场 0.60 8.90
Template:CSM stations 南门口 0.60 9.50 Tianxin
Template:CSM stations 侯家塘  3  1.35 10.85
Template:CSM stations 南湖路 1.00 11.85 Tianxin/Yuhua
Template:CSM stations 黄土岭  4  0.70 12.55
Template:CSM stations 涂家冲 0.75 13.30
Template:CSM stations 铁道学院 1.95 15.25 Tianxin
Template:CSM stations 友谊路 1.00 16.25
Template:CSM stations 省政府 1.80 18.05
Template:CSM stations 桂花坪 1.30 19.35
Template:CSM stations 大托 1.85 21.20
Template:CSM stations 中信广场  CZT  1.00 22.20
Template:CSM stations 尚双塘 1.40 23.60

Rolling stock

Services on the line are provided by a fleet of 23 Type B train sets manufactured by CRRC Zhuzhou. These train sets run in a six-car formation and have a top speed of 80 km/h (50 mi/h), and have double-layered flooring installed for noise reduction and improved passenger comfort.[3]

Future plans

A 5-station, 9.93 km long extension north to Caixia Road from Kaifu District Government began construction in end-2017.[4]

References

  1. ^ "长沙地铁1号线昨起试运行 1、2号线换乘最高票价7元". china.com.cn (in Chinese). March 22, 2016. Retrieved March 13, 2018.
  2. ^ "长沙地铁一号线正式开通运营". huaqi.info (in Chinese). June 29, 2016. Retrieved March 13, 2018.
  3. ^ "长沙地铁1号线超节能 明年上路". chinatimes.com (in Chinese). August 28, 2015. Retrieved March 13, 2018.
  4. ^ "长沙地铁1号线北延线、7号线一期有望年底开建". hunan.ifeng.com (in Chinese). February 20, 2017. Retrieved March 13, 2018.