2024 in rail transport
Appearance
Years in rail transport |
Timeline of railway history |
This article lists events related to rail transport that are currently scheduled to occur in 2024. Please be aware that the actual dates on which these events occur may differ substantially from what is shown here.
Events
December
- – expected completion of Stuttgart–Wendlingen high-speed railway.[1][2]
Unknown date
- – The Sydney Metro extension opening.[3]
- – The Lakeshore East line extension opening.[citation needed]
- – Confederation Line (Stage 2) East earliest opening date.[citation needed]
- – Alexandria – Aswan HSL claimed opening.[citation needed]
- – Proposed completion of Tallinn-Tartu line electrification.[citation needed]
- – Jokeri light rail opening.[citation needed]
- – RER E extension to Mantes-la-Jolie.[citation needed]
- – Opening of Agra Metro.[citation needed]
- – Opening of Indore Metro.[citation needed]
- – Opening of Kanpur Metro.[citation needed]
- – Opening of Patna Metro.[citation needed]
- – Opening of Green Line (Tel Aviv Light Rail) and Purple Line.[citation needed]
- – E8 series operation start. Speed of Yamagata Shinkansen trains (sharing 320 km/h Tohoku Shinkansen line) to increase from 275 km/h to 300 km/h.[citation needed]
- – Bandar Utama–Klang line opening.[citation needed]
- – George Town – Bayan Lepas LRT line opening.[citation needed]
- – Projected opening of the Auckland City Rail Link[citation needed]
- – Opening of Line 2 of Kazan Metro.[citation needed]
- – Extension of Stockholm Metro.[citation needed]
- – Phuket Island light rail transit opening.[citation needed]
- – Projected opening of Coventry Very Light Rail.[citation needed]
- – The Federal Way Extension of Link light rail is scheduled to open between SeaTac and Federal Way, Washington.[4]
- – The Lynnwood Extension of Link light rail is scheduled to open from Northgate to Lynnwood in Snohomish County, Washington.[5]
- – The Downtown Redmond extension of Link light rail's Blue Line is scheduled to open.[6]
- – Phoenix Valley Metro Rail South Central Extension/Downtown Hub project is expected to open to passenger operations as the second light rail line in the metro area.[7]
- – Phoenix Valley Metro Rail Northwest Extension Phase II is planned to open.[8]
References
- ^ Michael Kröger (29 November 2017). "Stuttgart 21 wird wohl eine Milliarde Euro teurer – und ein Jahr später fertig". Spiegel-Online (in German). Retrieved 6 January 2018.
- ^ Claus Hecking; Gerald Traufetter (12 December 2017). "Woche der Wahrheit für Stuttgart 21". Spiegel-Online (in German). Retrieved 6 January 2018.
- ^ "Sydney Metro Southwest Project Overview". Sydney Metro. Sydney Metro. Retrieved 13 June 2020.
- ^ "Federal Way Link Extension". Sound Transit. Retrieved May 3, 2016.
- ^ "Lynnwood Link Extension" (PDF). Sound Transit. July 2015. Retrieved February 15, 2016.
- ^ "Downtown Redmond Link Extension". Sound Transit. Retrieved September 23, 2019.
- ^ "South Central Extension/Downtown Hub". Valley Metro. Retrieved 28 February 2020.
- ^ "Northwest Extension Phase II Fact Sheet" (PDF). Third Quarter 2020. Retrieved 18 July 2020.