Jump to content

Solarpark Alt Daber

Coordinates: 53°12′N 12°31′E / 53.200°N 12.517°E / 53.200; 12.517
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Joppa Chong (talk | contribs) at 19:36, 2 December 2020 (localization+cat-fix). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Solarpark Alt Daber
Map
CountryGermany
LocationWittstock, Brandenburg
Coordinates53°12′N 12°31′E / 53.200°N 12.517°E / 53.200; 12.517
StatusOperational
Commission date3 December 2011
Construction cost€100 million
Solar farm
TypeFlat-panel PV
Site area133 hectares (329 acres)
Power generation
Units operational850,000
Nameplate capacity67.805 MW
Annual net output71.4 GWh

The Solarpark Alt Daber is a photovoltaic facility in Germany with 67.8 megawatts (MW, 90,900 hp).[1] It was completed 3 December 2011, for a cost of €100 million,[2] and is expected to produce 71 GWh/year.[3] It is located on a former military airport.

In 2014 a prototype of a battery storage system was added, mainly to provide frequency-response.[4]

See also

References

External links