Jump to content

Bainchigram railway station

Coordinates: 23°06′23″N 88°12′58″E / 23.106517°N 88.216109°E / 23.106517; 88.216109
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Colonies Chris (talk | contribs) at 14:56, 13 December 2020 (minor fixes, replaced: India → India (2), - → – , | style = Indian railway → | style = Indian Railways, Indian state of [[ → Indian state of [[, Howrah-Bardhaman → Howrah–Bardhaman (3), |websi). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.


Bainchigram
Kolkata Suburban Railway
General information
LocationGrand Trunk Road, Bainchigram, Hooghly district, West Bengal
India
Coordinates23°06′23″N 88°12′58″E / 23.106517°N 88.216109°E / 23.106517; 88.216109
Elevation27 metres (89 ft)
Owned byIndian Railways
Operated byEastern Railway
Line(s)Howrah–Bardhaman main line
Platforms3
Tracks3
Construction
Structure typeStandard (on ground station)
ParkingNo
Other information
StatusFunctioning
Station codeBCGM
Division(s) Howrah
History
Opened1855
Electrified1958
Previous namesEast Indian Railway Company
Services
Preceding station   Kolkata Suburban Railway   Following station
Template:Kolkata Suburban Railway lines
Location
Bainchigram is located in West Bengal
Bainchigram
Bainchigram
Location in West Bengal
Bainchigram is located in India
Bainchigram
Bainchigram
Location in India

Bainchigram railway station is a Kolkata Suburban Railway station on the Howrah–Bardhaman main line operated by Eastern Railway zone of Indian Railways. It is situated beside Grand Trunk Road at Bainchigram in Hooghly district in the Indian state of West Bengal.[1][2]

History

The East Indian Railway Company was formed on 1 June 1845, The first passenger train in the eastern section was operated up to Hooghly, on 15 August 1854. On 1 February 1855 the first train ran from Howrah to Raniganj through Howrah–Bardhaman main line. Bandel to Bardhaman rout was opened for traffic on 1 January 1885. Electrification of the Howrah–Bardhaman main line was initiated up to Bandel in 1957, with the 3000V DC system, and the entire Howrah–Bardhaman route including Bainchigram railway station completed with AC system, along with conversion of earlier DC portions to 25 kV AC, in 1958.[3]

References

  1. ^ "BCGM/Bainchigram". Retrieved 10 May 2019.
  2. ^ "BAINCHIGRAM (BCGM) Railway Station". NDTV. Retrieved 10 May 2019.
  3. ^ "HISTORICAL PERSPECTIVE – THE FIRST JOURNEY". er.indianrailways.gov.in. Retrieved 10 May 2019.