M85 expressway (Hungary)
Appearance
You can help expand this article with text translated from the corresponding article in Hungarian. (April 2018) Click [show] for important translation instructions.
|
M85 expressway | |
---|---|
M85-ös autóút | |
Route information | |
Length | 83 km (52 mi) 95 km (59 mi) planned |
Existed | 2008–present |
Major junctions | |
From | M1 near Győr |
To | Sopron A 3 border with Austria |
Location | |
Country | Hungary |
Counties | Győr-Moson-Sopron |
Major cities | Győr, Csorna, Sopron |
Highway system | |
|
The M85 expressway (Hungarian: M85-ös autóút) is a Hungarian expressway connecting Győr to Sopron. It will eventually connect M1 motorway to the Austrian border.
Openings timeline
- Győr; M1 – Enese (8 km): 2015.06.16.[1]
- Enese bypass (7 km): 2011.12.21.
- Enese – Kóny (3 km): 2015.06.16.[1]
- Kóny – Csorna (6 km): 2015.09.09.[2]
- Csorna bypass; I.section (east) (5 km):[2] 2015.09.09.; (this section was extended 2x3 lane)
- Csorna bypass; II.section (west) (4.5 km):[3] 2017.12.15.
- Csorna -Sopron Kelet, 51km, 2020.12.16
Junctions, exits and rest area
km | Destinations | Route | Notes | |
---|---|---|---|---|
0 | Győr-nyugat M85-M1 interchange |
M1 E60 E75 |
Western connection to Győr, towards to Budapest or Austria | |
Győr, Ikrény | 85 | |||
8 | Rábapatona | 84128 | ||
10 | Enese, Bezi | 8417 | ||
16 | Kóny, Rábcakapi | 8502 8509 |
||
21 | Csorna-kelet | 85 | Eastern connection to Csorna | |
23 | M85-M86 interchange (Csorna bypass) |
M86 E65 |
Eastern part of Csorna bypass Connection to Mosonmagyaróvár and Slovakia The northern terminus of European routes E65 | |
Bridge over Railway Line 8 (Győr-Sopron) | ||||
25 | Bridge over Railway Line 14 (Pápa-Csorna) | |||
27 | M85-M86 interchange (Csorna bypass) |
M86 E65 |
Southern part of Csorna bypass Connection to Szombathely and Slovenia The southern terminus of European routes E65 | |
28 | Bridge over Railway Line 16 (Hegyeshalom-Szombathely) | |||
32 | Csorna-nyugat, Farád | 85 | Western connection to Csorna | |
40 | Babóti pihenőhely | Rest area | ||
44 | Kapuvár, Kisfalud | 8611 | ||
53 | Fertőendréd, Fertőd | 85 | ||
60 | Fertőszentmiklós, Röjtökmuzsaj | 8627 | ||
68 | Bridge over Railway Line 8 (Győr-Sopron) | |||
72 | Nagycenk, Pereszteg | 84 | ||
77 | Nagycenki pihenőhely | Rest area | ||
79 | Bridge over Railway Line 15 (Sopron-Szombathely) | |||
82 | Sopron-kelet, Kópháza, Harka | 84 8645 |
Eastern connection to Sopron | |
84 | Balf | 8518 | ||
87 | Sopron-észak, Fertőrákos | 8527 | Northern connection to Sopron | |
89 | Bécsi domb (Tunnel - 780 m) | |||
90 | Sopron-nyugat, Ágfalva | 84 | Western connection to Sopron | |
95 | Soproni pihenőhely | Rest area | ||
Sopron (H) – Klingenbach (A) border crossing | ||||
Südost Autobahn → to Vienna, Austria |
- Under construction, Planned section
Maintenance
The operation and maintenance of the road by Hungarian Public Road Nonprofit Pte Ltd Co. This activity is provided by these highway engineers.
Payment
Hungarian system has 2 main type in terms of salary:
1, time-based fee vignettes (E-matrica); with a validity of either 10 days (3500 HUF), 1 month (4780 HUF) or 1 year (42980 HUF).[4]
2, county vignettes (Megyei matrica); the highway can be used instead of the national sticker with the following county stickers:
Type of county vignette Available section Győr-Moson-Sopron County full length (0 km – 83 km)
See also
References
External links
Wikimedia Commons has media related to Autópálya M85.
- National Toll Payment Services Plc. (in Hungarian, some information also in English)
- Hungarian Public Road Non-Profit Ltd. (Magyar Közút Nonprofit Zrt.)
- National Infrastructure Developer Ltd.