Jump to content

Line 1 (Kunming Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Lennart97 (talk | contribs) at 18:03, 1 January 2021 (Route: fixed link to disambiguation page (by replacing {{KunmingRT stations}} with a manual link)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Kunming Metro Line 1/2
 1  2 
Overview
StatusOperational
LocaleKunming, China
Termini
Stations35
Service
TypeRapid transit
SystemKunming Metro
Operator(s)Kunming Rail Transit Corp., Ltd
History
Opened20 May 2013; 11 years ago (2013-05-20)
Technical
Line length22.1 km (13.73 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Highest elevationUnderground and elevated

The Line 1/2 of the Kunming Metro (Chinese: 昆明轨道交通1/2号线; pinyin: Kūnmíng Guǐdào Jiāotōng Yī/Èr Hào Xiàn) is an rapid transit line that connects the Chenggong with Kunming's urban center. The line is 40.4 kilometres (25.1 mi) long and currently has 35 stations with the Template:KunmingRT stations as the northern terminal, and Template:KunmingRT stations as the southern terminal of the main line, and Template:KunmingRT stations as the southern terminal of the branch line. The line entered into operation on 20 May 2013. On subway maps, the Line's color is   red/  blue. Line 1/2 will be split into two operational lines once Line 1 (phase 3) and Line 2 (phase 2) is completed.

Hours of operation

From 2013, the hours of operation for line 1, from 6:00 AM to 12:00 midnight daily with an 8 minutes interval frequency.

Line 1/2 trains travels at speeds of up to 80 kilometres per hour (50 mph). On the initial operation one-way trip will take approximately 34 minutes.[1]

Opening timeline

Line 1
Segment Commencement Length Station(s) Name
Xiaodongcun — University Town South 20 May 2013 22.1 km (13.73 mi) 12 Phase 1 (southern section)
South Ring Rd — Xiaodongcun 30 April 2014 6.9 km (4.29 mi) 6 Phase 1 (northern section)
Chunrong Street — Kunming South Railway Station 28 December 2016 4.7 km (2.92 mi) 4 Kunming South Railway Station connector project
Line 2
Segment Date opened Length Station(s) Name
North Coach Station — South Ring Rd 30 April 2014 11.4 km (7.08 mi) 14 Phase 1

Route

Line 1/2 runs in Panlong District, Guandu District and Chenggong District.

station name Connections Distance
km
Location
English Chinese
Template:KunmingRT stations 北部汽车站 0.00 0.00 Panlong
Template:KunmingRT stations 龙头街 1.13 1.13
Template:KunmingRT stations 司家营 1.18 2.31
Template:KunmingRT stations 羊肠村 1.00 3.31
Template:KunmingRT stations 霖雨桥 0.93 4.24
Template:KunmingRT stations 北辰 1.54 5.78
Jinxing 金星 0.73 6.51
Template:KunmingRT stations 白云路 1.18 7.69
Template:KunmingRT stations 火车北站  4   5 
Kunming North railway station KBM
1.08 8.77
Template:KunmingRT stations 穿心鼓楼 0.80 9.57
Template:KunmingRT stations 交三桥 0.80 10.37
Template:KunmingRT stations 东风广场  3  0.49 10.86
Template:KunmingRT stations 塘子巷  6  0.58 11.44 Panlong/Guandu
style = "background:#Template:KunmingRT color; height: 2pt" colspan = "5" |
Template:KunmingRT stations 环城南路  1  2 [a] 0.95 12.39
style = "background:#Template:KunmingRT color; height: 2pt" colspan = "5" |
Template:KunmingRT stations 昆明火车站 Kunming railway station KMM 1.27 13.66 Guandu
Template:KunmingRT stations 福德 1.03 14.69
Template:KunmingRT stations 日新路 0.82 15.51
Template:KunmingRT stations 巫家坝 0.88 16.39
Template:KunmingRT stations 昌宏西路 1.57 17.96
Template:KunmingRT stations 晓东村 1.08 19.04
Template:KunmingRT stations 珥季路 1.74 20.78
Template:KunmingRT stations 星耀路 1.74 22.52
Template:KunmingRT stations 新亚洲体育城 1.11 23.63
Template:KunmingRT stations 南部汽车站 2.05 25.68
Template:KunmingRT stations 斗南  4  3.01 28.69 Chenggong
Template:KunmingRT stations 春融街 4.51 33.2
Template:KunmingRT stations 驼峰街 1.33 34.53
Template:KunmingRT stations 联大街  4  1.47 36.00
Template:KunmingRT stations 谊康南路 1.42 37.42
Template:KunmingRT stations 大学城 1.37 38.79
Template:KunmingRT stations 大学城南 2.36 41.15
Template:KunmingRT stations 市级行政中心清风 1.25 42.40 Chenggong
Template:KunmingRT stations 宜和路 0.89 43.29
Template:KunmingRT stations 白龙潭 1.88 45.17
Template:KunmingRT stations 昆明南火车站  4 
China Railway KOM
1.25 46.42
  1. ^ Line 1/2 will be split into two operational lines once Line 1 (phase 3) and Line 2 (phase 2) is completed.

References

  1. ^ "昆明地铁首期南段5月20日试运营". 昆明信息港网. 昆明信息港网. Retrieved 21 May 2013.