DRB Class 01.10

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Andy Dingley (talk | contribs) at 23:02, 3 October 2016 (Undid revision 742465821 by 2607:FEA8:2360:724:4136:DDAA:8E31:1CD0 (talk)). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

DRB Class 01.10
DB Class 011, 012
DRG 01 1001
Type and origin
BuilderSchwartzkopff
Total produced55
Specifications
Configuration:
 • Whyte4-6-2
 • UIC2′C1′ h3
 • GermanS 36.20
Gauge1,435 mm (4 ft 8+12 in)
Leading dia.1,000 mm (39.37 in)
Driver dia.2,000 mm (78.74 in)
Trailing dia.1,250 mm (49.21 in)
Length:
 • Over buffers24.130 m (79 ft 2 in)
Axle load20 tonnes (20 long tons; 22 short tons)
Tender type2'3 T 38
Fuel capacity10.0 tonnes (9.8 long tons; 11.0 short tons) coal or
13,500 L (2,970 imp gal; 3,570 US gal) fuel oil
Water cap.38.0 m3 (1,340 cu ft) or
38,000 litres (8,360 imp gal; 10,000 US gal)
Boiler pressure16 bar (1.60 MPa; 232 psi)
Cylinders3
Cylinder size500 mm (19.69 in)
Piston stroke660 mm (25.98 in)
Valve gearWalschaerts (Heusinger)
Loco brakeKnorr, single-chamber, compressed air brakes acting on both sides of coupled wheels + compressed air quick-acting brakes on driving and tender wheels
Auxiliary brakeyes
Parking brakeyes
Performance figures
Maximum speedForwards: 150 or 140 km/h (93 or 87 mph)
Reverse: 50 km/h (31 mph)
Indicated power1,559 kW (2,091 hp)
1,728 kW (2,317 hp) (coal, with Austausch boiler)
1,817 kW (2,437 hp) (oil, with Austausch boiler)
Career
Retired1975
Light engine, Rheine August 1973.
File:012 at Rheine, 1975.jpg
At Rheine shed, Easter 1974.
012 100-4 on the Flensburg Steam Runabout (Dampfrundum) 2007

The locomotives of DRB Class 01.10 were standard locomotives (Einheitsdampflokomotiven) used for express train services by the Deutsche Reichsbahn. The Class 01.10 was a development of the Class 01.

History

The Deutsche Reichsbahn needed powerful steam locomotives with a top speed of 150 km/h and the ability to haul trains of 500 tonnes at 120 km/h, as well as trains of 350 tonnes at 100 km/h up ramps with a 5 ‰ incline, for its network of fast D and FD trains. This was more than the existing Class 01 and 03 engines were able to cope with because their two-cylinder driving gear did not have sufficient reserves of power, the 01.10 had three cylinders. To reduce air resistance, the new vehicles were equipped with a streamlined body shell that reached down to 400 mm above the top of the rails, and to reduce frictional losses they were equipped with roller bearings on the drive and coupling rods.

Out of a perceived requirement for 400 locomotives, 204 were initially ordered in 1939 from all the major locomotive factories in Germany. However, as a result of the Second World War only 55 were eventually delivered, all of which came from Schwartzkopff.

The Class 01.10 was delivered to the following locomotive sheds (Bahnbetriebswerke): Leipzig HBF West, Berlin Anhalter Bahnhof, Halle, Hamburg-Altona, Hannover-Ost, Bebra, Erfurt P, Dresden-Altstadt, Frankfurt/Oder PBF, Würzburg and Munich as well as the Grunewald Locomotive Research Office. During the war, some of the locomotives were transferred to Breslau and Kattowitz .

In 1944 all the locomotives were moved to western Germany due to the course of the war.

After the Second World War the engines were in a pitiful state. Sections of streamlining were missing and the boilers, made of steel that was not particularly durable, showed the first signs of fatigue. On 20 June 1945 the entire class was retired. At that stage, the locomotives had each driven less than 500,000 km. However, as a result of the overriding shortage of locomotives after the war, the class was partially reprieved, and several engines with minor damage were even temporarily overhauled. However the majority of the engines remained sidelined until 1949. In the same year it was decided that all the locomotives, apart from one (01 1067) which was finally retired, should be refurbished. As part of this refurbishment the streamlined shells of locomotive and tender were completely removed, and Witte smoke deflectors were fitted. The frontal view of the locomotives had an unusual appearance for German locomotives at that time. The feedwater heater remained in its old location across the front of the chimney and the smokebox door was cut off above the middle. Only 2 engines were provided with the otherwise normal round smokebox door.

However, the problem of the boiler being made of non-durable St 47 K steel remained. Because the machines needed to be operational, it was decided in 1953 to tender for a new, welded, high-performance boiler. This was built by Henschel between 1953 and 1956 in Kassel, and installed at the Brunswick repair depot, along with a mixer preheater system.

In 1956 number 01 1100 was given, along with a new boiler, oil-firing by way of a trial. This enabled its performance to be increased. In addition, oil-firing can be more finely controlled and could be matched more easily to the operating conditions. The engines were therefore more economical than coal-fired locomotives. Working conditions for stokers were also improved. The energy supply was regulated by slides (Schieber). Greasing the driving gear, however, remained a stoker's task. Nevertheless, the stoker was now freed from the hard work of shovelling coal and could better support the engine driver in observing the line. Fuel oil, then available as a waste product, was used for firing. Following their positive experience with this system, the DB decided in 1957 to convert another 33 locomotives of this class to oil-firing.

In 1968 the coal-fired locomotives were given the designation 011 and the oil-fired ones the number 012, as part of the renumbering to conform with electronic data processing (EDP).

The locomotives were used on all important main lines until their electrification, for example on the WürzburgHamburg or Hamm–Hamburg routes. Towards the end they were deployed on the Hamburg–Westerland and Rheine–Norddeich lines.

On 31 May 1975 the last engines from Rheine shed ran scheduled services, with a great deal of participation from railway fans, and finally retired.

Table of withdrawals
Year Coal-fired
locomotives
at start of year
Oil-fired
locomotives
at start of year
Quantity
withdrawn
Locomotive numbers
1968 20 34 6 011 053/087/094/097, 012 079/089.
1969 16 32 8 011 069/078/083/086/090/096/097/099.
1970 8 32 4 011 070/093/098, 012 088.
1971 5 31 7 011 056/065/091, 012 057/059/076/085.
1972 2 27 10 011 072, 012 001/052/054/060/064/053/074/103/105.
1973 1 18 6 011 062, 012 058/071/084/092/102.
1974 0 13 5 012 068/077/082/101/104.
1975 0 8 8 012 055/061/063/066/075/080/081/100.

Preserved locomotives

Thanks to their relatively recent withdrawal from service, ten of these locomotives have been preserved.

Class 01.10 engines may be visited in a number of museums, such as the German Steam Locomotive Museum in Neuenmarkt-Wirsberg, Upper Franconia in Bavaria. Number 01 1081 is being refurbished as a museum exhibit at the Augsburg Railway Park (Bahnpark Augsburg).

Still[when?] working are:

See also

References

  • Greß, Gerhard; Sauter, Jörg (2001). Die Baureihe 01.10. Von der Stromlinienlok zum DB-Renner. Freiburg: EK-Verlag. ISBN 3-88255-216-6. {{cite book}}: Invalid |ref=harv (help)
  • Konzelmann, Peter (1973). Die Baureihe 01.10. Deutsche Dampflokomotiven. Vol. 4. Solingen: Arbeitsgemeinschaft Eisenbahn-Kurier e.V. {{cite book}}: Invalid |ref=harv (help)
  • Obermayer, Horst J. (2000). Baureihe 01.10. Stuttgart: transpress Fahrzeugportrait. ISBN 3-613-71138-9. {{cite book}}: Invalid |ref=harv (help)
  • Sauter, Jörg (1996). Die Schnellzuglokomotiven der Ulmer Eisenbahnfreunde 01 1066, 01 509, 01 1081, 01 173. Leutkirch: UEF. {{cite book}}: Invalid |ref=harv (help)

External links