Jump to content

Dandenong Bypass

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by AussieLegend2 (talk | contribs) at 23:14, 12 May 2016 (top: replace deprecated parameter using AWB). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Dandenong Bypass

General information
TypeHighway
Length11 km (6.8 mi)
Opened2007 & 2012
Route number(s) State Route 49
Major junctions
West end
 
East end
Location(s)
Major settlementsKeysborough
Highway system

The Dandenong Bypass runs along the Dingley Freeway route from Springvale Road in Springvale South to the South Gippsland Highway in Dandenong South.

History

The Dandenong Bypass was completed along the alignment reserved for the Dingley Freeway corridor. The project has been staged in two separate projects over seven years, and has been recently opened to traffic between Springvale Road and South Gippsland Highway in December 2012. The entire bypass has a speed limit of 80 km/h with traffic light controlled intersections and overpasses at Cheltenham Road and EastLink.

Perry Road to South Gippsland Highway

The bypass commenced construction in late 2005 between Perry Road and South Gippsland Highway as part of the EastLink project, with the $65 million works involving the creation of a four lane divided road with traffic light controlled access at roads which run north-south along the constructed route.

The 4.8 km bypass also included an overpass of the Cranbourne railway line as well as a diamond interchange with EastLink. The entire bypass has an 80 km/h speed limit. The project was completed and opened to traffic on 9 December 2007.[1]

Springvale Road to Perry Road

The Springvale Road - Perry Road section of the bypass connects Westall Road with the then open Dandenong Bypass at Perry Road, creating an arterial standard highway, with traffic light controlled intersections and an overpass at Cheltenham Road, for 11 km from Westall Road to the South Gippsland Highway.[2]

The new section of road, which commenced construction in 2011, is expected to carry between 30,000 and 40,000 vehicles per day as well as a shared path being constructed alongside, linking to existing shared paths which already run along the built sections of the arterial. The construction of this section (at a cost of $74.6 million) was brought forward to commence in 2010 as part of the "Nation Building" initiatives in the 2009 Victorian State Budget.[3] . The project was completed early and under budget (previously estimated to cost $80 million) to traffic on 20 December 2012.[4]

Major Intersections

Dandenong Bypass
Westbound Distance to
Melbourne
via &
(km)
Distance to
Cranbourne
(km)
Eastbound
CONTINUES AS
Westall Road
to Moorabbin, Blackburn and Melbourne
Edithvale, Springvale
Springvale Road
29 21 Springvale, Edithvale
Springvale Road
Chapel Road 31.5 18.5 Chapel Road
Perry Road 32.5 17.5 Perry Road
Chandler Road 33 17 Chandler Road
WANGOONI BRIDGE
Frankston, Ringwood, Melbourne
EastLink Melbourne / Avalon Airport Grade Separated Intersection
34 16 WANGOONI BRIDGE
Ringwood, Melbourne, Frankston
EastLink Melbourne / Avalon Airport Grade Separated Intersection
Hammond Road 35.5 14.5 Hammond Road
Frankston, Dandenong
Dandenong-Frankston Road
36 14 Dandenong, Frankston
Dandenong-Frankston Road
CRANBOURNE RAIL LINE 37 13 CRANBOURNE RAIL LINE
Start Dandenong Bypass 37.5 12.5 End Dandenong Bypass
Traffic Lights (clockwise from bypass)
South Gippsland Highway to Dandenong and Warragul
South Gippsland Highway to Cranbourne and Phillip Island

References