Jump to content

Heysham to M6 Link Road

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by MrHumanPersonGuy (talk | contribs) at 19:24, 18 June 2017 (Removed unsourced statement added by 217.44.108.29 (talk) that was probably added in good faith.). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

April 2015: Bridging the Lune

The Heysham to M6 Link Road, known as The Bay Gateway,[1] is a 4.8-kilometre-long (3.0 mi) dual carriageway linking the Heysham and Morecambe peninsula to Junction 34 of the M6 motorway in Lancashire, England. It was opened on 31 October 2016.[1] In the process, Junction 34 was remodelled.[2]

The concept was published in the document ‘Road Plan for Lancashire’, in 1948. The idea was revived in 1962 in the Lancashire Development Plan. The first phase, known as the Lancaster and Morecambe bypass, opened in 1994, leaving the Lune crossing and the motorway link unbuilt. Planning permission for this was granted in 2008, with the Department for Transport accepting the 'best and final bid offer' and confirming a funding contribution of £111m in 2011. The Secretary of State for Transport gave final approval in March 2013.[3]

References

Citations
  1. ^ a b "Heysham link road opens".
  2. ^ Lancaster City Council 2015.
  3. ^ Lancashire County Council 2015.
Sources