KiwiRail Holdings Limited
Company typeState-Owned Enterprise
IndustryRail transport, shipping, property management
PredecessorToll NZ
Founded1 July 2008 (2008-07-01)
Headquarters,
Area served
New Zealand
Key people
Trevor Janes (Chairman)[1]
Paula Rebstock (Deputy Chair)[2]
Peter Reidy (CEO)[3]
ProductsThe Great Journeys of New Zealand
ServicesRail freight
Long-distance passenger rail
Urban passenger rail
Inter-island ferries
RevenueDecrease NZ$694 million (2016)[4]
Decrease NZ$194 million loss (2016) [4]
Number of employees
3,400
Divisions
SubsidiariesKiwiRail Limited
Websitewww.kiwirail.co.nz

KiwiRail Holdings Limited is a New Zealand State-owned enterprise responsible for rail operations in New Zealand. Trading as KiwiRail and headquartered in Wellington, New Zealand, KiwiRail is the largest rail transport operator in New Zealand. KiwiRail has business units of KiwiRail Freight, The Great Journeys of New Zealand and Interislander. KiwiRail released a 10-Year Turn-around Plan in 2010 and has received significant government investment in support of this in an effort to make KiwiRail a viable long-term transport operator.

History

Background

Prior to the establishment of KiwiRail, rail transport in New Zealand has been under both public and private ownership. Government operators included the Public Works Department (1873–1880), New Zealand Railways Department (1880–1982), and the New Zealand Railways Corporation (1982–1990). New Zealand Rail Limited was split off from the Railways Corporation (which continued to own the land beneath the rail network) in 1990, privatised in 1993 and then renamed in 1995 to Tranz Rail. In 2004 Tranz Rail's rail, ferry and trucking operations were acquired by Toll Holdings and renamed Toll NZ, with the central government buying back the rail network under the New Zealand Railways Corporation (trading as ONTRACK). After several years of negotiations the two parties could not come to an agreement on the amount that Toll should pay for access to the rail network (track access fees). This effectively stifled the ability of rail in New Zealand to recover from the prior years of investment neglect and seriously threatened the ability of New Zealand to get its key primary products to market.

Establishment of KiwiRail

In July 2008, the government announced the purchase for $690 million of Toll Rail (but not its trucking operation), renaming it KiwiRail. The Railways Corporation then owned both KiwiRail and ONTRACK, with both companies merging in October 2008[5] to create one company that controls both rail and ferry operations and rail infrastructure.

Further restructuring: splitting of land and operations

In 2011, KiwiRail proposed splitting its land and rail corridor assets from its rail operation assets.[6] On 27 June 2012 it was announced by the company that the value of the land and rail operations will be written down from NZ$7.8 billion to $1.3 billion, and KiwiRail will continue as the rail and ferry operator, while the New Zealand Railways Corporation will manage KiwiRail's land.[7] The de-merger took effect on 31 December 2012.[8]

10-year Turnaround plan

A new DL class locomotive (9020), purchased as part of KiwiRail's turnaround plan.

Under the years of private ownership prior to the government's re-nationalisation and establishment of KiwiRail in 2008, infrastructure investment in rail outside of Wellington dropped to an average of just over $25m a year. Clearly, a significant capital injection along with a clear long-term strategic plan was required if rail was to survive as a viable transport operator in NZ. The result was the release by KiwiRail in 2010 of a 10-year turnaround plan and significant government investment in support of this in the years following. In support of the turn-around plan, from July 2008 to December 2016 KiwiRail received over $2.1 billion of Crown investment, which was mostly spent on infrastructure and new rolling stock.[9]

Aims of the 10 Year Turn-around Plan

The focus of the Plan is to increase rail traffic volumes, revenue and productivity, modernise assets and separate out the commercial elements of the business from the non-commercial.[10]

The plan included the following points:[10]

  • "Step change" on the Auckland – Wellington – Christchurch trunk route:
    • Reduce transit time and improve reliability along the route by easing curves, removing speed restrictions, greater investment in renewal of bridges and sleepers and passing loops. An express freight train journey between Auckland and Wellington took thirteen and a half hours. KiwiRail aimed to reduce transit times to 11 hours.
    • Improve exit and entry from Auckland and Wellington with improvements at terminals and on main lines to reduce transit times and conflicts with commuter services
    • Increase ferry rail-freight capacity by extending the length of the Aratere (achieved 2011) and make the Kaitaki rail–capable (idea since abandoned)
  • Improve reliability, capacity and enabling investment:
    • Increased renewals on "other key routes", including investment in sleeper replacement, bridge strengthening and track formation refurbishment.
    • Improved IT systems and processes, equipment and facilities at terminals
    • New locomotives (see DL class) (48 in service by 2017) and 3,000 new wagons (over 1,000 in service by 2017).[11]
  • Review of minor lines (close or mothball if no anchor customers emerge):
  • Clarify and assign costs associated with Auckland and Wellington metro services (resulting in Tranz Metro assets being transferred to the Greater Wellington Regional Council and contracts for running services being made "contestable", as in Auckland.

Two of KiwiRail's major customers, Mainfreight and Fonterra, invested heavily in rail-related infrastructure in line with the Turnaround Plan. Mainfreight has allocated $60 million for investment in new railhead depots, while Fonterra has invested $130 million in a new rail hub complex in Hamilton and another in Mosgiel.[13]

Progress on the Turnaround Plan by June 2016

The plan has had mixed success, with company Chairman John Spencer stating in 2013 that for its first three years, rail freight revenue had increased by over 25%.[14] Similar progress in attaining new customers and increasing freight volumes has been made over the life of the Plan to date (other than with coal).

Steady and at times rapid progress has been made on the enabling parts of the Turnaround Plan, such as new locomotives and wagons, lengthening of the rail ferry and track destressing, but not always effectively.

Unfortunately, the 10 Year Turnaround Plan was also quickly undermined by a series of adverse events, including:

Update 2017 of the Turnaround Plan

Partially as a response to the events outlined above, in the 2017 budget the government announced a further $450 million in capital funding for KiwiRail, and that the company's operations would be placed under another major review, believed to relate to future funding models. The $450 million was earmarked for repairs following the 2016 Kaikoura earthquake and for further locomotive and rolling stock purchases. As part of the Turnaround Plan's agenda to standardise locomotives and wagons, in 2016 KiwiRail announced it would effectively switch off the NIMT electrification in late 2017 and replace the electric locomotives with an additional eight DL locomotives (additional to the 15 as reported in the 2016 Annual Report).[16]

KiwiRail business units

Freight

KiwiRail Freight is the company's largest business unit, making up the majority of KiwiRail's revenue with $390 million in the financial year ended July 2016. In the same year, KiwiRail moved around 18 million tonnes of freight and carried about 16% of New Zealand's total freight task (tonnes-km) [17]

Freight types: Bulk commodities include coal, logs, milk (dry and wet), IMEX (import/export intermodal) and domestic intermodal freight. Formerly large scale freight types such as petroleum products have entirely been withdrawn, and fertilizer has almost disappeared. The freight trading revenue by sector, as per the December 2016 Half Year Report is [18]  :

  • Domestic 27%
  • Bulk 19%
  • Forestry 15%
  • Import/Export 39%


Railfreight depots: KiwiRail has a total of 17 railfreight depots. In the North Island, these are Whangarei, Auckland, Hamilton, Tauranga, New Plymouth, Napier, Wanganui, Palmerston North, Wanganui, Masterton. In the South Island they are Blenheim, Christchurch, Ashburton, Timaru, Oamaru, Dunedin, Invercargill.

Inland Ports: KiwiRail serves a number of Inland Port yards, although does not own the tracks. These include Conlinxx (Wiri), Midland Port (Rolleston), Longburn International Freight Hub (Napier), Manawatu Inland Port (Palmerston North), MetroPort (Rolleston) and will include Ruakua (Hamilton) when it opens in 2018.

Sea Ports: KiwiRail has major freight yards and sidings at Lyttelton port Company (containers, logs, coal), Port Chalmers (containers), Southport (Bluff), Timaru, Mt Maunganui, Auckland, Centreport( Wellington), Port of Napier.

Anchor freight customers: Key anchor customers include Fonterra, Westland Dairy Products (Rolleston and Hokitika), Solid Energy and the various freight forwarders including Mainfreight and port companies including Port of Tauranga.

Freight wagons: KiwiRail operates 4,855 wagons (2016 Annual Report unfortunately does not break down revenue and non-revenue wagon numbers). An additional 120 wagons were acquired in the year ending 2016, with over 1,000 new wagons added since 2008. One of KiwiRail's stated aims is to progressively move towards standardized wagons, with the container flat-top being overwhelmingly the dominant type (fitted with curtain sided swap bodies, liquid containers, log cradles and so on to meet almost all freight tasks). The Norwegian coupling is progressively being replaced with automatic Janney coupler on all wagons. A very small number of four wheel wagons have remained in revenue service in the Far North, but with the mothballing of the line north of Kauri in late 2016, no doubt these last remaining four wheelers will be scrapped.

Key freight routes:

  • Auckland - Christchurch: domestic general freight, mostly via 10', 20' and 40' containers and curtainsiders or box wagons.
  • Auckland - Tauranga: Containerized and bulk export products
  • Kinleith/Murapara - Mount Maunganui: wood products only
  • Midland Line: Bulk export coal from north of Westport and Reefton, coal containers for Fonterra, dry and wet milk between Westland Dairy plants at Hokitika and Rolleston, export dry milk from Fonterra at Darfield.
  • Edendale - Tairei - Port Chalmers: export milk powder in containers.
  • Wairio - Invercargill: solely coal in containers for Fonterra use.
  • Invercargill - Bluff: run as a 'shunt', sole freight is exports to Southport.


Interislander

Re-branded along with KiwiRail Scenic Journeys as the single brand The Great Journeys of New Zealand in 2017, The Interislander is the company's second largest business unit. It operates ferry services across Cook Strait between Wellington in the North Island and Picton in the South Island. In financial year 2012, $123.9M of KiwiRail's revenue came from the Interislander, with the majority of the Interislander's revenue coming from rail and road freight transport.[19]

Current fleet

The Interislander operates three ferries. In 2011, the Aratere was extended by 30 m to add extra capacity.[20]

Image Name Built Entered service Capacity Notes
Passengers Road Rail
DEV Aratere 1998 1999 600 + 31 crew 1050 lane metres [20] 420 lane metres (32 wagons)[20] Numbers are post 2011 modifications
MS Kaiarahi 1998 2014 550 1900 lane metres [21] none built 1998 as Dawn Merchant; chartered temporarily by Interislander in 2014 as Stena Alegra while Aratere was out of service, then chartered long-term in 2015 and renamed Kaiarahi
MV Kaitaki 1994 2005 1350 + 60 crew 1780 lane metres (550 cars) [22] none Built 1994 as Isle of Innisfree; chartered by Interislander in 2005 as Challenger; renamed Kaitaki 2007


Property and Corporate

KiwiRail is a major land owner in New Zealand, and manages over 18 thousand hectares of land, has in excess of 1,500 property assets with a combined value of over $965 million (Annual Report 2016). Increasingly, KiwiRail is pursuing a commercial approach to asset management, and in the 2016 financial year received over $18 million from property sales.[17]


Scenic Journeys

Re-branded along with Interislander as the single brand The Great Journeys of New Zealand in 2017, KiwiRail Scenic Journeys is the long-distance passenger transport subsidiary of KiwiRail, operating the Capital Connection, Northern Explorer, TranzAlpine and Coastal Pacific. The passenger trains are predominantly patronized by tourists to NZ, with the exception of the Capital Connection, which is a commuter train.

In 2012 KiwiRail attempted to sell Tranz Scenic [23], but was unsuccessful, and KiwiRail continues to run these services. The division is now experiencing rapid double digit annual growth, due to the growth of Chinese tourism to New Zealand, so much so that Kiwirail in 2017 may purchase an additional eight carriages [24] to the 17 AK carriages purchased in 2012.

Tranz Metro

Suburban rail passenger operations in Auckland and Wellington are contracted by their respective local governments and not operated by KiwiRail. In Auckland rolling stock is owned by Auckland Transport which has contracted operation to Transdev Auckland, while in Wellington rolling stock is owned by Greater Wellington Regional Council which has contracted operation to Transdev Wellington. Until 2016, KiwiRail division Tranz Metro had the contract to operate the Wellington services, but lost a bid to renew this contract in 2015. KiwiRail however is sub-contracted by Transdev Wellington to provide and operate the diesel locomotives required to haul the Wairarapa Connection service.


Infrastructure and Asset Management

KiwiRail Network replacing sleepers on the Main South Line at Blueskin Bay, Otago.[25] Closest machine is a dynamic track stabiliser, followed by a Regulator, then a Continuous Action Tamper.

The KiwiRail Infrastructure and Engineering division, formerly known as ONTRACK, has three main areas of operation:

  • Development, maintenance and operation of all of New Zealand's main-line rail infrastructure (see List of New Zealand railway lines).[26]
  • Provides rail operators with access to the rail network in return for the payment of track access charges.
  • Rail network controller, providing services such as train control and signalling.

The network it is responsible for consists of:

  • Route length: 3,898 kilometres (2,422 mi)
  • Tunnels: 149
  • Bridges: 1,700
  • Electrification: 95 km at 1.5 kV DC (Wellington area), 411 km at 25 kV 50 Hz AC (NIMT central section)

The divisions current (2016/2017) major project is refurbishment work in the Kaimai tunnel.

Engineering

The Engineering division provides mechanical assistance to the Freight and Passenger businesses, as well as to Auckland Transport. Engineering maintains, refurbishes and occasionally builds rolling stock for the network.

In 2012, KiwiRail announced it was putting its Hillside Engineering division on the market.[27] and subsequently sold part of the division and transferred remaining work to Hutt workshops.

KiwiRail now operates the Hutt Workshops in the Hutt Valley of Wellington, along with a number of small wagon maintenance depots, for example, at Addington (Christchurch) and Frankton.

Stabling yards

Most rail operations are a 'there and back' service with motive power being held in a few key strategic locations. Motive power stabling yards are as follows:

  • Henderson (Auckland)
  • Papakura (Auckland)
  • Strand Distributed Stabling Facility (Auckland)
  • Westfield (Auckland)
  • Wiri (Auckland)[28]
  • Frankton (Hamilton)
  • Palmerston North
  • Thorndon (Wellington)
  • Middleton (Christchurch)
  • Dunedin

Yards and facilities

Some of the more prominent rail facilities used by KiwiRail include:

Current rolling stock fleet

Locomotives

The table below lists only the current locomotives used by KiwiRail.

Image Class Introduced Number in class Number in service Power output (kW) Notes
DC 1978–1983 69 19 1230 Mainline diesel-electric. Thirty-six stored and fourteen scrapped.
DCP 1978–1983 16 10 1230 Mainline diesel-electric. Six stored.
DFB 1979–1981 16 16 1800 Mainline diesel-electric.
DFT 1979–1981 14 9 1800 Mainline diesel-electric. Four stored and one being converted to DFBs.[29]
DH 1978-1979 6 6 672 Heavy shunting locomotive.
DL 2010–present 48 48 2700 Mainline diesel-electric.
DSC 1959–1967 70 30 315 Light shunting. Thirty-four scrapped, two preserved, and three owned by industrial owners.
DSG 1981-1983 24 24 700 Heavy shunting.
DSJ 1984-1985 5 5 350 Light shunting.
DXB 1972–1976 14 14 2240 Mainline diesel-electric.
DXC 1972–1976 32 32 2240 Mainline diesel-electric.
DXR 1972–1976 2 2 2420 Mainline diesel-electric.
EF 1988–1989 22 15 3000 25kV AC electric locomotives. Five stored and two scrapped.
TR 1936–1978 90 17 138 Light shunting, positioned in smaller yards and leased to industrial customers. Forty-four scrapped, twenty-eight preserved and one stored.
Railcars and carriages
Image Class Number in class In service Passenger capacity Notes
Silver Fern Railcar 3 1972–present 96 Two are used for excursions and charters by both Kiwirail and Dunedin Railways Limited.
AK carriage 17 2012 - present AK 63; AKC 10 Used on the Tranz Alpine, Coastal Pacific, Northern Explorer services
S class carriages 8 1999–present 60 Used on Capital Connection service.

Corporate governance

Executive Board[30]
Trevor Janes Chairman
Dame Paula Rebstock Deputy Chair
John Leuchars Director
Guy Royal Director
Paul Harper Director
Mike Pohio Director
Executive Team[31]
Peter Reidy Chief Executive
Kate Jorgensen Chief Financial Officer
Rob McAlpine Group General Manager Operations
Alan Piper Group General Manager Sales and Commercial
Roy Sullivan Group General Manager Rolling Stock and Asset Services
Todd Moyle Group General Manager Network Services
David Gordon Group General Manager Asset Management and Investment
Andrew Norton Group General Manager Human Resources

Financial performance

Divisional financial revenue (NZ $ millions)

Financial year[* 1] Freight Interislander Scenic Journeys Tranz Metro Property and Corporate Infrastructure and Asset Management
2008-09
2009-10 367.1 (56%) 120.2 (18%) 28.3 (4%) 63 (10%) 30.2 (5%) 41.6 (6%)
2010-11 [32] 396.7 (59%) 122.9 (18%) 21.5 (3%) 65.5 (10%) 31.8 (5%) 37.9 (6%)
2011-12 [33] 457.6 (64%) 123.9 (17%) 45.7 (6%) 20.3 (3%) 34.1 (5%) 34.2 (5%)
2012-13 [19][34] 466.9 (64%) 124.3 (17%) 20 (3%) 43.6 (6%) 33.8 (5%) 38.4 (5%)
2013-14 [35] 462 (62%) 120.8 (16%) 21 (7%) 52.6 (3%) 49.3 (7%) 35.2 (5%)
2014-15 [17] 433.7 (60%) 127.3 (18%) 24.8 (7%) 53.7 (3%) 43.2 (6%) 37.9 (5%)
2015-16 [17] 389.8 (56%) 127.6 (18%) 29.7 (4%) 59.7 (9%) 44.5 (6%) 42.7 (6%)
  1. ^ Financial year is 1 July-30 June.

Consolidated financial performance (NZ $ millions)

Financial year[* 1] Operating revenue Operating surplus Total comprehensive surplus (deficit)
2008-09[36] 636 63 (186)
2009-10[37] Increase 646 Increase 74 Increase (48.1)
2010-11[32] Increase 667.4 Increase 100.3 Increase (31.1)
2011-12[33] Increase 715.8 Decrease 77.6 Decrease (77.7)
2012-13[19][34][38] Increase 727 Decrease 77.5 Decrease (174)
2013-14 [35] Increase 740.9 Increase 108.2 Decrease (229.3)
2014-15 [17] Decrease 720.6 Decrease 90.5 Decrease (168)
2015-16 [17] Decrease 694 Decrease 75.9 Decrease (194.4)
  1. ^ Financial year is 1 July-30 June.

See also

References

  1. ^ "Board of Directors". KiwiRail – kiwirail.co.nz. Retrieved 21 June 2017.
  2. ^ "Board of Directors". KiwiRail – kiwirail.co.nz. Retrieved 21 June 2017.
  3. ^ "Executive Team". KiwiRail – kiwirail.co.nz. Retrieved 21 June 2017.
  4. ^ a b "Annual Report 2015" (PDF). KiwiRail Holdings Ltd.
  5. ^ "Annual Report 2008-09" (PDF). KiwiRail. Retrieved 23 April 2015.
  6. ^ "No ulterior motive to sell off land or business says KiwiRail". Radio New Zealand. 31 October 2011.
  7. ^ Adam Bennett (27 June 2012). "Huge writedown in KiwiRail value".
  8. ^ "Positive growth continues alongside improvements to business capability". KiwiRail. 28 February 2013.
  9. ^ "KiwiRail funding since July 2008'". 10 March 2017.
  10. ^ a b "Overview of KiwiRail's turnaround plan" (PDF). KiwiRail. 5 May 2010. Retrieved 6 August 2010.
  11. ^ "KiwiRail Orders Another 20 Chinese Locomotives". Otago Daily Times. 20 July 2011. Retrieved 22 July 2011.
  12. ^ "KiwiRail to mothball Napier-Gisborne Line". KiwiRail. 2 October 2012.
  13. ^ "KiwiRail survival plan is on track". The Dominion Post. 25 September 2010. Retrieved 25 September 2010.
  14. ^ "KiwiRail growth momentum 'still on track'". 25 October 2013.
  15. ^ "Midland line closed by fire".
  16. ^ "KiwiRail to dump electrics". Stuff. 21 December 2016.
  17. ^ a b c d e f "Annual Report 2015-2016" (PDF).
  18. ^ www.kiwirail.co.nz/uploads/Publications/Annual%20Integrated%20Report%202016.pdf "Half Year Report 2016" (PDF). {{cite web}}: Check |url= value (help)
  19. ^ a b c "Results for announcement to the market – 29 August, 2012" (PDF). KiwiRail. 29 August 2012.
  20. ^ a b c "Facts and Figures - Aratere". The Interislander.
  21. ^ "Facts and Figures - Kaiarahi". The Interislander.
  22. ^ "Facts and Figures - Kaitaki". The Interislander.
  23. ^ "Opposition parties criticise TranzScenic plans". Radio New Zealand. 1 August 2012.
  24. ^ "KiwiRail may spend $50M on new carriages". 7 May 2017.
  25. ^ "Half-million dollar rail project at Waitati". Otago Daily Times. 22 September 2009. Retrieved 26 September 2009.
  26. ^ "Companies Office – ONTRACK Infrastructure Limited". Retrieved 25 September 2010.
  27. ^ "KiwiRail Putting Hillside Workshops Up for sale". Radio New Zealand. 19 April 2012.
  28. ^ "Maintenance and stabling facility opens for Auckland's new trains". Auckland Transport – at.govt.nz. 5 July 2013. Retrieved 11 July 2017.
  29. ^ "Railfan". 23 (1). Triple M Publications. December 2016. ISSN 1173-2229. {{cite journal}}: Cite journal requires |journal= (help)
  30. ^ "Board of Directors". KiwiRail – kiwirail.co.nz. Retrieved 21 June 2017.
  31. ^ "Executive Team". KiwiRail – kiwirail.co.nz. Retrieved 21 June 2017.
  32. ^ a b "Annual Report 2010-2011" (PDF).
  33. ^ a b "Annual Report 2011-2012" (PDF).
  34. ^ a b "KiwiRail Annual Report 2013" (PDF). KiwiRail. 2013. Retrieved 21 January 2016.
  35. ^ a b "Annual Report 2014" (PDF). KiwiRail Holdings Ltd.
  36. ^ "Annual Report 2008-2009" (PDF).
  37. ^ "Annual Report 2009-2010" (PDF).
  38. ^ Catherine Harris. "KiwiRail narrows annual loss". Fairfax New Zealand.

KiwiRail subsidiaries

Articles about KiwiRail