Jump to content

Line 3 (Wuhan Metro)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by ASDFGH (talk | contribs) at 02:32, 22 September 2016. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 3
A train at Hongtu Boulevard station in December 2015
Overview
StatusOperating
OwnerGovernment of Wuhan
LocaleWuhan, China
Termini
Stations24
Service
TypeRapid transit
SystemWuhan Metro
Services1
Operator(s)Wuhan Metro Group Co., Ltd.
Rolling stockChinese Type B
History
OpenedDecember 28, 2015
Technical
Line length33.2 km (20.63 mi)[1]
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)

The Line 3 of Wuhan Metro (Chinese: 武汉地铁三号线) is the first underground metro line crossing the Han River. This line crosses five districts of Wuhan: Jiang'an District, Jianghan District, Qiaokou District, Hanyang District and Hannan District (Wuhan Economic-Technological Zone, WEDZ). It started operation on December 28, 2015.[2][3]

History

On February 23, 2012, National Development and Reform Commission approved all construction of Line 3[4] and construction started on March 31.[5][6] All tunnels of Line 3 were finished on October 8, 2015,[7] and all tracks were finished on October 28, 2015.[8] It started operation on December 28, 2015.[2]

Stations

Station name Transfer Location
English Hanzi
Hongtu Boulevard 宏图大道 Jiang'an
Citizens Home 市民之家
Houhu Boulevard 后湖大道
Xingye Road 兴业路
Erqi Branch Road 二七小路
Luojiazhuang 罗家庄
Zhaojiatiao 赵家条
Huiji 2nd Road 惠济二路
Xianggang Road 香港路
Lingjiaohu 菱角湖 Jianghan
Fanhu 范湖  2 
Yunfei Road 云飞路
Wuhan Business District 武汉商务区
Shuangdun 双墩 Qiaokou
Zongguan 宗关  1 
Wangjiawan 王家湾  4  Hanyang
Longyangcun 龙阳村
Taojialing 陶家岭
Sixin Boulevard 四新大道
Hanyang Long-Distance Bus Station 汉阳客运站
Sanjiaohu 三角湖
Sports Center 体育中心
Dongfeng Motor Corporation 东风公司
Zhuanyang Boulevard 沌阳大道

Rolling stock

Line 3 train

The first train of Line 3 arrived on March 25, 2015.[9]

References

  1. ^ "挖了五年武汉地铁2号线26日贯通 年底通车" (in Chinese). Retrieved 2012-02-24.
  2. ^ a b "武汉即将地铁成环 "环金时代"重构商业地理" (in Chinese). 长江日报. 2015-12-24. Retrieved 2015-12-24.
  3. ^ "One more line! Map of new Wuhan Metro Line 3". Wuhan Time. Nov 27, 2015. Retrieved Dec 24, 2015.
  4. ^ "武汉地铁3号线获国家发改委批复 一期下月全面开工" (in Chinese). Retrieved 2012-02-22.
  5. ^ "武汉地铁3号线今天正式动建 首穿汉江江底" (in Chinese). Retrieved March 30, 2012.
  6. ^ "武汉地铁3号线拟于31日全线开工 线路图抢先看" (in Chinese). Retrieved March 28, 2012.
  7. ^ "武汉市副市长王立到武汉三号线七标调研" (in Chinese).
  8. ^ "由公司承建的武汉地铁三号线一期工程全线轨道工程顺利贯通,标志着该工程主体施工全面完成" (in Chinese).
  9. ^ "1st train of Wuhan Metro Line 3 arrives in Wuhan". Hubei Provincial People’s Government. March 26, 2015. Retrieved Dec 24, 2015.