Nebraska Highway 91
Route information | ||||
---|---|---|---|---|
Maintained by NDOT | ||||
Length | 230.63 mi[1] (371.16 km) | |||
Existed | 1934[2]–present | |||
Major junctions | ||||
West end | N-2 north of Dunning | |||
East end | US 30 / US 75 in Blair | |||
Location | ||||
Country | United States | |||
State | Nebraska | |||
Counties | Blaine, Loup, Garfield, Greeley, Boone, Platte, Colfax, Dodge, Washington | |||
Highway system | ||||
|
Nebraska Highway 91 is a highway in central and eastern Nebraska. Its western terminus is at an intersection with Nebraska Highway 2 north of Dunning. Its eastern terminus is at an intersection with U.S. Highway 30 and U.S. Highway 75 in Blair.
Route description
Nebraska Highway 91 begins at an intersection with NE 2 just north of Dunning. It heads in a northeasterly direction through the Sand Hills, where it has an intersection with NE 7 south of Brewster. The highway continues to the east and southeast into farmland, heading into Taylor. In Taylor, NE 91 meets US 183 and runs concurrently southward with it for about a mile. NE 91 then splits off and head eastward, where it intersects with NE 11 south of Burwell. NE 91 and NE 11 run concurrently northward for a couple of miles as it passes through Burwell, before splitting off to head east again. West of Ericson, the highway intersects NE 70, where it then runs concurrently with that route for about 20 miles (32 km).[1][3]
Further east, NE 91/NE 70 intersect with US 281, which is where the overlap with NE 70 ends. NE 91 then runs concurrently southward. NE 91 then splits off and head eastward some more, passing through Spalding. After leaving Spalding, the highway passes NE 52. To the east, it enters Albion where it intersects with NE 14. Further east, it passes NE 45 before entering Lindsay. NE 91 intersects US 81 northeast of Humphrey. The highway continues to the east, where it passes NE 57 north of Leigh, as well as NE 15 southeast of Clarkson.[1][3]
In Snyder, NE 91 passes by NE 79 before continuing eastward. East of Snyder, it meets and runs concurrently southeastward with US 275. After passing through Scribner and bypassing Hooper, NE 91/US 275 meet with US 77 and run concurrently southward along it as well. North of Fremont, NE 91 splits off to the east yet again. It continues eastward through Nickerson and continues into Blair, where it terminates at an intersection with US 30 and US 75.[1][3]
Major intersections
County | Location | mi[1] | km | Destinations | Notes |
---|---|---|---|---|---|
Blaine | Dunning | 0.00 | 0.00 | N-2 | |
Brewster | 15.09 | 24.29 | N-7 north | ||
Loup | Taylor | 44.94 | 72.32 | US 183 north (3rd Street) | West end of US 183 overlap |
45.96 | 73.97 | US 183 south | Eastern end of US 183 overlap | ||
Garfield | Burwell | 58.37 | 93.94 | N-96 west | |
59.36 | 95.53 | N-11 south | Western end of N-11 overlap | ||
61.35 | 98.73 | N-11 north | Eastern end of N-11 overlap | ||
| 77.41 | 124.58 | N-70 south | Western end of N-70 overlap | |
Wheeler | Ericson | 91.00 | 146.45 | US 281 north / N-70 east | Eastern end of N-70 overlap, western end of US 281 overlap |
Greeley | | 96.97 | 156.06 | US 281 south | Eastern end of US 281 overlap |
Boone | | 112.31 | 180.75 | N-52 south | |
Albion | 125.45 | 201.89 | N-14 north (South 6th Street) | Western end of N-14 overlap | |
125.81 | 202.47 | N-14 south | Eastern end of N-14 overlap | ||
Platte | | 137.56 | 221.38 | N-45 north | |
Cornlea | 148.52 | 239.02 | S-71F south | ||
Humphrey | 153.52 | 247.07 | US 81 | ||
Creston | 159.00 | 255.89 | S-71C south | ||
Colfax | Leigh | 165.72 | 266.70 | S-19A south | |
166.97 | 268.71 | N-57 north | |||
Clarkson | 171.96 | 276.74 | S-19B north (Bryan Street) | ||
| 174.96 | 281.57 | N-15 | ||
Howells | 177.88 | 286.27 | S-19C north | ||
Dodge | Dodge | 183.88 | 295.93 | S-27A north | |
Snyder | 189.03 | 304.21 | N-79 south (Range Line Street) | ||
| 193.32 | 311.12 | US 275 north | Western end of US 275 overlap | |
Hooper | 204.91 | 329.77 | S-27D north | ||
| 207.35 | 333.70 | US 77 north | Interchange, western end of US 77 overlap | |
Nickerson | 211.20 | 339.89 | US 77 / US 275 south | Eastern end of US 77 and US 275 overlaps | |
Washington | Blair | 230.36 | 370.73 | US 30 west / US 75 north (19th Street) / US 30 east / US 75 south (Washington Street) | |
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
References
- ^ a b c d e Nebraska Highway Reference Log Book
- ^ The Nebraska Highways Page: Highways 61 to 100
- ^ a b c "overview of Nebraska Highway 91" (Map). Google Maps. Retrieved 2010-11-10.
External links
- State highways in Nebraska
- Transportation in Blaine County, Nebraska
- Transportation in Loup County, Nebraska
- Transportation in Garfield County, Nebraska
- Transportation in Greeley County, Nebraska
- Transportation in Boone County, Nebraska
- Transportation in Platte County, Nebraska
- Transportation in Colfax County, Nebraska
- Transportation in Dodge County, Nebraska
- Transportation in Washington County, Nebraska