Pensacola Bay Bridge

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Cydebot (talk | contribs) at 20:00, 22 October 2016 (Robot - Speedily moving category Bridges on the U.S. Highway System to Category:Bridges on the United States Numbered Highways per CFDS.). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Pensacola Bay Bridge
On the bridge, heading south
Coordinates30°23′46″N 87°11′08″W / 30.395983°N 87.185644°W / 30.395983; -87.185644
Carries4 lanes of US 98
CrossesPensacola Bay
LocalePensacola, Florida, and Gulf Breeze, Florida, U.S.
Official namePhilip Dane Beall, Sr., Memorial Bridge
Maintained byFlorida Department of Transportation (FDOT)
ID number480035
Characteristics
DesignReinforced concrete girder bridge
Total length15,640 feet (4,767.1 meters)
Width55 feet (16.8 meters)
Clearance below50 feet (15.2 meters)
History
OpenedJune 13, 1931 (original bridge)
October 31, 1960 (current bridge)
Statistics
Daily traffic50,065[1]

The Pensacola Bay Bridge, also known locally as the Three-Mile Bridge, runs between downtown Pensacola, Florida, and Gulf Breeze, Florida. It carries four lanes of U.S. Highway 98 across Pensacola Bay.

History

The bridge, which is dedicated to Sen. Phillip D. Beall Sr., opened to traffic on October 31, 1960, at which time it replaced the Thomas A. Johnson Bridge, a narrow two-lane facility that ran parallel just to the east. This original bridge, which had been in service since June 13, 1931,[2] was tolled and was signed as TOLL US 98 until the bridge bonds were paid off. The decommissioned original bridge served as two 1.5-mile-long fishing piers until they were largely destroyed by Hurricane Ivan in 2004. By 2007, the remainder of the northernmost fishing pier was demolished. Demolition has begun on the southernmost part of the fishing pier. In 2010, construction was completed on a northern replacement fishing pier about half as long as the original pier.[3]

In 1989, the bridge was struck by a barge and was out of service for several months. All traffic was diverted to ferries, causing severe backups in both Gulf Breeze and downtown Pensacola. The Florida Department of Transportation took the opportunity to modernize the bridge, adding emergency lanes and replacing barrier walls and lighting.

The Pensacola Bay Bridge as viewed from Naval Live Oaks Preserve.

Replacement

FDOT announced in January 2010, near the end of the bridge's 50-year design life, that the bridge was structurally deficient and would have to be replaced within six years.[4] As of 2011, a study is underway to determine the "feasibility, location, and conceptual design" of a replacement bridge.[5] As of February 2013, plans have begun to replace the bridge with construction beginning within two years, at a cost of $595.6 million, on a course slightly to the west of the existing bridge. The new bridge, like the current one, will not charge a toll.[6]

References

  1. ^ FDOT Florida Traffic Online Accessed May 25, 2011.
  2. ^ "Bridge dedication attracts 20,000." The Frisco Employees' Magazine, July 1931. p. 4-5.
  3. ^ http://www.fox10tv.com/dpp/news/pensacola-fishing-pier-reopens
  4. ^ "Pensacola Bay Bridge is 'structurally deficient,' must be replaced." Northwest Florida Daily News, January 21, 2010. Accessed May 24, 2011.
  5. ^ Pensacola Bay Bridge PD&E Study Accessed May 24, 2011.
  6. ^ Sen. Don Gaetz: No toll for Pensacola Bay Bridge Accessed February 1, 2013.

External links

Media related to Pensacola Bay Bridge at Wikimedia Commons