Rostov Metro (Russian: Ростовский Метрополитен) is a planned rapid transit system in Rostov-on-Don, Russia. As of October 2008, the city authorities are redesigning the historical proposal (created in the 1980s) at the request of the federal government. Construction may begin no earlier than 2016 if the federal government approves financing of the project.
History
Plans for creating a Rostov metro go back to the 1970s and 1980s. A publicised 1991 map of a system provided a single 14 kilometre line with 10 stations, running parallel to the northern bank of the Don River and reaching Rostov-on-Don Airport;[citation needed] far future plans provided for a three line system.
The plans were revived in November 2007 when the Rostov Metro reappeared in the development program for rapid transit approved by the Ministry of Transport. The program required Rostov authorities to redraft the old proposal, taking account of past and projected development in and around the city, so that construction could resume in 2011. No other commitments were ever made. In April 2008, the Rostov city hall announced an upcoming feasibility study that would supersede the old studies conducted in previous decades.[1]
In January 2008, the deputy mayor of Rostov estimated construction costs at 1 billion roubles (42 million US dollars) per kilometer; the total project cost, including land and supporting infrastructure, would cost three times more.[2]
In September 2008, the mayor of Rostov formed a city commission for metro construction. The deputy mayor announced that in November 2008 – February 2009 the city would select design and engineering contractors; the preliminary design stage for the metro would last into 2011. In 2011, the city hall was expected to have sound cost estimates for initiating a federal funds appropriation. City officials expected the first stretch of the Rostov metro to be operational in thirteen to fourteen years, assuming normal financing from the federal budget.[3] However, due to a lack of funding, it is unknown when the construction of the metro will start.
References
- ^ "Obnovlenie TEO oboidetsya Rostovy-na-Dony v 300 millionov (Oбновление ТЭО строительства метро обойдется Ростову в 300 млн рублей)" (in Russian). rosbalt.ru. Retrieved 2008-10-05.
- ^ "Svet v nachale tonnelya (Свет в начале тоннеля?)" (in Russian). rosmetrostroy.ru. 2003. Retrieved 2008-10-05. Archived 2004-12-31 at the Wayback Machine
- ^ "Pervaya vetka Rostovskogo metropolitena budet postroyena cherez 13-14 let (Первая ветка Ростовского метрополитена будет построена через 13-14 лет)" (in Russian). rostovgorod.ru. 2008. Retrieved 2008-10-05.