Jump to content

STS-61-B

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 80.187.112.15 (talk) at 06:36, 19 April 2016 (Crew). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

STS-61-B
Construction of the ACCESS structure.
Mission typeSatellite deployment
Technology
OperatorNASA
COSPAR ID1985-109A Edit this at Wikidata
SATCAT no.16273
Mission duration6 days, 21 hours, 4 minutes, 49 seconds
Distance travelled3,970,181 kilometres (2,466,956 mi)
Orbits completed109
Spacecraft properties
SpacecraftSpace Shuttle Atlantis
Launch mass118,664 kilograms (261,609 lb)
Landing mass93,316 kilograms (205,727 lb)
Payload mass21,791 kilograms (48,041 lb)
Crew
Crew size7
MembersBrewster H. Shaw, Jr.
Bryan D. O'Connor
Jerry L. Ross
Mary L. Cleave
Sherwood C. Spring
Charles D. Walker
Rodolfo Neri Vela
Start of mission
Launch date27 November 1985, 00:29:00 (1985-11-27UTC00:29Z) UTC
Launch siteKennedy LC-39A
End of mission
Landing date3 December 1985, 21:33:49 (1985-12-03UTC21:33:50Z) UTC
Landing siteEdwards Runway 22
Orbital parameters
Reference systemGeocentric
RegimeLow Earth
Perigee altitude361 kilometres (224 mi)
Apogee altitude370 kilometres (230 mi)
Inclination28.5 degrees
Period91.9 min

Back row L-R: Walker, Ross, Cleave, Spring, Neri Vela
Front row L-R: O'Conner, Shaw

STS-61-B was NASA's 23rd Space Shuttle mission, and its second using Space Shuttle Atlantis. The shuttle was launched from Kennedy Space Center, Florida, on 26 November 1985. During STS-61-B, the shuttle crew deployed three communications satellites, and tested techniques of constructing structures in orbit. Atlantis landed at Edwards Air Force Base, California, at 16:33 EST on 3 December 1985, after 6 days and 21 hours in orbit.

STS-61-B marked the quickest turnaround of a Shuttle orbiter from launch to launch in history – just 54 days elapsed between Atlantis' launch on STS-51-J and launch on STS-61-B. The mission was also notable for carrying the first and until today only Mexican astronaut, Rodolfo Neri Vela.

Crew

Position Astronaut
Commander United States Brewster H. Shaw, Jr.
Second spaceflight
Pilot United States Bryan D. O'Connor
First spaceflight
Mission Specialist 1 United States Jerry L. Ross
First spaceflight
Mission Specialist 2 United States Mary L. Cleave
First spaceflight
Mission Specialist 3 United States Sherwood C. Spring
Only spaceflight
Payload Specialist 1 United States Charles D. Walker
Third spaceflight
Payload Specialist 2 Mexico Rodolfo Neri Vela
Only spaceflight

Backup crew

Position Astronaut
Payload Specialist 1 United States Robert J. Wood
First spaceflight
Payload Specialist 2 Mexico Ricardo Peralta y Fabi
First spaceflight

Crew seating arrangements

Seat[1] Launch Landing
Seats 1–4 are on the Flight Deck. Seats 5–7 are on the Middeck.
S1 Shaw Shaw
S2 O'Connor O'Connor
S3 Ross Spring
S4 Cleave Cleave
S5 Spring Ross
S6 Walker Walker
S7 Neri Vela Neri Vela

Shuttle processing

After landing at the Edwards Air Force Base at the end of STS-51-J on 7 October 1985, Atlantis returned to the Kennedy Space Center on 12 October. The shuttle was moved directly into an Orbiter Processing Facility (OPF), where post-flight de-servicing and pre-flight processing took place simultaneously.

After only 26 days in the OPF, a record fast processing in the history of the Space Shuttle program, the shuttle was rolled to the Vehicle Assembly Building on 7 November.[2] Atlantis was mated with the External Tank and Solid Rocket Booster stack and was rolled out to launch pad 39A on 12 November 1985.

Payload

Deployment of the Satcom K2 satellite.

Three satellites were deployed during the mission: Aussat 2, Morelos II, and Satcom K2. The first two were the second in their series, the first examples having been deployed during STS-51-I and STS-51-G. Both were Hughes HS-376 satellites equipped with a PAM-D booster to reach geosynchronous transfer orbit. Satcom K2, meanwhile, was a version of the RCA 4000 series. RCA American Communications owned and operated the satellite system of which Satcom K2 was a part. The satellite was deployed using a PAM-D2 booster, a larger version of the PAM-D. This was the first flight of this booster stage on a Space Shuttle.

All three satellites were successfully deployed, one at a time, and their booster stages fired automatically to lift them to geosynchronous transfer orbits. Their respective owners assumed charge, and later fired the onboard kickmotors at apogee, to circularize the orbits and align them with the equator.

Middeck payloads

  • Continuous Flow Electrophoresis System (CFES)
  • Diffusive Mixing of Organic Solutions (DMOS)
  • Morelos Payload Specialist Experiments (MPSE) and Orbiter Experiments (OEX)

Other items

A checkered racing flag was carried onboard Atlantis during STS-61-B; the flag is now on display at the Indianapolis Motor Speedway Hall of Fame Museum.

Mission summary

Night launch of Atlantis at the beginning of the STS-61-B mission.
Construction of the EASE structure.

Space Shuttle Atlantis lifted off from Pad A of Launch Complex 39 at Kennedy Space Center at 19:29 pm EST on 26 November 1985. The launch marked the second night launch of the Space Shuttle program, and the ninth and final flight of 1985.[3]

A key element of the mission's objectives was EASE/ACCESS, an experiment in assembling large structures in space. EASE/ACCESS was a joint venture between the Langley Research Center and the Marshall Space Flight Center. ACCESS was a "high-rise" tower composed of many small struts and nodes. EASE was a geometric structure shaped like an inverted pyramid, composed of a few large beams and nodes. Together, they demonstrated the feasibility of assembling large pre-formed structures in space. Astronauts Jerry Ross and Sherwood Spring performed the two spacewalks of the mission which marked the 50th and 51st U.S. (12th and the 13th for the Shuttle) EVAs. An IMAX camera mounted in the cargo bay filmed the activities of the astronauts engaged in the EASE/ACCESS work, as well as other scenes of interest.

"This is probably not the preferred way of building a space station," Ross said later of EASE.[4][5] The astronauts reported that the most difficult part of the spacewalks was torquing their own masses while holding the EASE beams. The ACCESS worked well, while EASE required too much free floating. The astronauts judged that performing six-hour spacewalks every other day over a five or six-day period was feasible, and recommended glove changes to reduce hand fatigue. Ross said in the Extra-Vehicular Activity (EVA) debrief that the crew had tried to have the Manned Maneuvering Unit (MMU) manifested for use in the second spacewalk, because "for certain applications it would be very useful. In particular if you were building portions of a space station attached to the orbiter, then moving those portions farther than the manipulator arm could transport them." He added that the MMU could be used to attach cable runs and instruments in places out of reach of the shuttle's robotic arm (RMS).

During the mission, astronaut Rodolfo Neri Vela accomplished a series of experiments, primarily related to human physiology. He also photographed Mexico and Mexico City as part of the mission's Earth observations. Astronaut Charles Walker again operated the Continuous Flow Electrophoresis System, the third flight of this larger and improved equipment, to produce commercial pharmaceutical products in microgravity. An experiment in Diffusive Mixing of Organic Solutions, or DMOS, was conducted successfully for 3M. The object of this experiment was to grow single crystals that were larger and more pure than any that could be grown on Earth. One Getaway Special canister stored in Atlantis' payload bay carried a Canadian student experiment, which involved the fabrication of mirrors in microgravity with higher performance than ones made on Earth.

All the experiments on this mission were successfully accomplished, and all equipment operated within established parameters. Atlantis landed safely at Edwards Air Force Base at 16:33 EST on 3 December 1985, after a mission lasting 6 days, 21 hours, and 5 minutes. Atlantis landed one orbit earlier than planned due to lighting concerns at the Edwards AFB. Rollout distance on landing was 10,759 feet lasting 78 seconds.[6]

Spacewalks

Two spacewalks were conducted during the STS-61-B mission to demonstrate assembly techniques which might be used in space station assembly.[4]

EVA Spacewalkers Start (UTC) End Duration
EVA 1 Jerry Ross
Sherwood Spring
29 November 29 November 5 hours 32 minutes
EVA 1 focused on human performance during assembling of an experimental erectable truss structure. Ross and Spring first assembled the 3.4-m (11-ft) Assembly Concept for Construction of Erectable Space Structures (ACCESS) assembly jig in Atlantis’ payload bay. Each cell was assembled in the jig, then pushed up so that the next cell could be assembled. The astronauts assembled the ACCESS truss in 55 minutes, (EVA time line allotted two hours for a single ACCESS assembly) so they assembled it and built it again. The Experimental Assembly of Structures through EVA (EASE) task involved putting together beams weighing 29 kg (64 lb) to make a 3.6-m (12-ft) three-sided pyramid assessed the capabilities of free-floating astronauts. EASE was scheduled to be assembled six times, but Ross and Spring managed eight assemblies. During the first four assemblies the astronauts used foot restraints. In his post flight debriefing, Spring noted that his fingers grew numb during the third EASE assembly and very tired during the fourth. At the end of the EVA Spring assembled and hand-deployed a small target satellite to be used after the EVA as a station-keeping target for Atlantis, which played the role of an automated orbital maneuvering vehicle in rendezvous software tests.
EVA 2 Jerry Ross
Sherwood Spring
1 December 1 December 6 hours 41 minutes
The purpose of EVA 2 was to assess the ability of astronauts to handle large structural elements and the ability of the Shuttle's robotic arm (RRM) to support future station assembly. Ross and Spring assembled nine bays of ACCESS, then placed parts for the tenth bay on the RMS. Ross stepped into the Manipulator Foot Restraint (MFR) and astronaut Mary Cleave positioned him within reach of the top of the ACCESS girder, where he assembled the tenth bay. The parts were not tethered. Ross performed a cable run assembly simulation by attaching a tether along the side of the tower while Cleave positioned him. Then Spring released the bottom of the tower so Ross could try to precisely handle the beam from the RMS. He replaced it in the assembly jig where it started, demonstrating astronaut ability to assemble a truss in one place and install it in another. Spring then replaced Ross on the MFR. He changed a beam on the tower to simulate structural repair, then pointed the truss at the Moon to judge his handling ability. The astronauts took down ACCESS, and Spring assembled EASE from the RMS. Before finishing, he joined two beams to simulate handling a thermal control heat pipe. Ross unlatched the EASE pyramid so that Spring could maneuver it. Then he replaced Spring on the MFR to duplicate the EASE activities.

Wake-up calls

NASA began a tradition of playing music to astronauts during the Gemini program, and first used music to wake up a flight crew during Apollo 15. Each track is specially chosen, often by the astronauts' families, and usually has a special meaning to an individual member of the crew, or is applicable to their daily activities.[7]

Flight Day Song Artist/Composer Played for
Day 2 "Air Force Hymn" Brewster H. Shaw, Jr.
Day 3 "America the Beautiful"
Day 4 "Marine Corps Hymn" Bryan O’Connor
Day 5 "Notre Dame Victory March" Jerry Ross
Day 6 "Born in the U.S.A." Bruce Springsteen

See also

References

Public Domain This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration.

  1. ^ "STS-61B". Spacefacts. Retrieved 26 February 2014.
  2. ^ Chris Gebhardt (2 July 2011). "OV-104/ATLANTIS: An International Vehicle for a Changing World". NASAspaceflight.com. Retrieved 3 July 2011.
  3. ^ NASA (November 1985). "SPACE SHUTTLE MISSION STS-61B PRESS KIT" (PDF). NASA. Retrieved 3 July 2011.
  4. ^ a b David S. Portree and Robert C. Trevino (October 1997). "Walking to Olympus :An EVA chronology (Monograpahs in Aerospace History Series #7)" (PDF). NASA History Office. Retrieved 3 July 2011.
  5. ^ "Astronauts Believe Lengthy EVA Building Sessions are Feasible". Aviation Week & Space Technology: 20–21. 16 December 1985.
  6. ^ NASA. "STS-61B". NASA. Retrieved 3 July 2011.
  7. ^ Fries, Colin (25 June 2007). "Chronology of Wakeup Calls" (PDF). NASA. Retrieved 13 August 2007.