This article was automatically assessed because at least one WikiProject had rated the article as start, and the rating on other projects was brought up to start class. BetacommandBot 14:17, 9 November 2007 (UTC)[reply]

Improper use of time indications

[edit]

At present the article reads The line was recently upgraded as part of the West Coast Main Line upgrade.

Leaving aside the upgrade as part of an upgrade, the "recently" was written in 2007 or earlier, nine years ago. It is important not to write material like this, or to use the present tense to say what is done "now" without dating it. Afterbrunel (talk) 11:13, 5 August 2016 (UTC)[reply]

Move discussion in progress

[edit]

There is a move discussion in progress on Talk:Chester to Manchester line which affects this page. Please participate on that page and not in this talk page section. Thank you. —RMCD bot 04:46, 2 November 2016 (UTC)[reply]

Move discussion in progress

[edit]

There is a move discussion in progress on Talk:Chester to Manchester Line which affects this page. Please participate on that page and not in this talk page section. Thank you. —RMCD bot 13:46, 4 November 2016 (UTC)[reply]

Tracks

[edit]

Is the line 4 or 2 track? Was it 4 track and reduced? Etc, etc. 2.126.206.36 (talk) 08:16, 28 April 2018 (UTC)[reply]

The line is 4 tracks as far as Adswood Road Jn, roughly 1.5 miles south of Stockport. It is then 2 tracks to Crewe, with a pair of Goods Loops at the South end of Chelford station. Whilst there are 4 tracks side-by-side from Sandbach to just outside Crewe, 2 of these are the Manchester Independent Goods lines, which avoid Crewe station. 81.133.157.60 (talk) 12:17, 10 July 2018 (UTC)[reply]