Jump to content

Talk:Ohio State Route 607

Page contents not supported in other languages.
From Wikipedia, the free encyclopedia

GA Review

[edit]
This review is transcluded from Talk:Ohio State Route 607/GA1. The edit link for this section can be used to add comments to the review.

Reviewer: Dough4872 (talk · contribs) 17:01, 22 October 2014 (UTC)[reply]

GA review (see here for criteria)

  1. It is reasonably well written.
    a (prose): b (MoS):
    • Looking at the route description, it doesn't appear that OH 607 goes by that many construction sites. Also, remember construction sites eventually come something once their finished.
    • In the major intersections table, why is the beginning milepost to two decimal places and the ending milepost to three decimal places?
  2. It is factually accurate and verifiable.
    a (references): b (citations to reliable sources): c (OR):
  3. It is broad in its coverage.
    a (major aspects): b (focused):
    • The lead of the article is awful short. I would look into adding a few more details.
    • Any idea when Monastery Road/Township Road 209 was initially constructed?
  4. It follows the neutral point of view policy.
    Fair representation without bias:
  5. It is stable.
    No edit wars, etc.:
  6. It is illustrated by images, where possible and appropriate.
    a (images are tagged and non-free images have fair use rationales): b (appropriate use with suitable captions):
    • An image of the road would be nice, but not required.
  7. Overall:
    Pass/Fail:

I will place this article on hold for some fixes to be made. Dough4872 17:09, 22 October 2014 (UTC)[reply]

@Dough4872: I added more to the lead, and added the 0 for the RJL. I changed the RD just a bit, and I don't there is any information online I could use that has info on when TR 209 was first constructed.—CycloneIsaac (Talk) 21:09, 22 October 2014 (UTC)[reply]

I will now pass the article. Dough4872 00:12, 23 October 2014 (UTC)[reply]