Newhaven ERF

Coordinates: 50°47′46″N 0°03′22″E / 50.796°N 0.056°E / 50.796; 0.056
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 84.245.151.26 (talk) at 07:24, 5 November 2014. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

50°47′46″N 0°03′22″E / 50.796°N 0.056°E / 50.796; 0.056

Newhaven Incinerator

The Newhaven Incinerator is an incineratorfor the treatment of up to 210,000 tonnes per annum of East Sussex's municipal solid waste opened 2012. The facility, was built by Veolia Environmental Services, has been given the green light by planners at the Conservative-controlled East Sussex County Council.[1][2]

Opposition

Campaign group Defenders of the Ouse Valley and Estuary claimed that more than 11,000 objections were made to the incinerator. In its petition, the group said: "The incinerator proposed by East Sussex County Council will dominate the town of Newhaven with two chimneys towering over 230 feet (70 m) high, the main building of the incinerator will be over 100 feet (30 m) high and more than 500 feet (150 m) long. The site is on the edge of an Area of Outstanding Natural Beauty and in a valley which is between the two halves of Newhaven."

Construction

Construction of the incinerator began in April 2008 and was completed in late 2011.[3]

See also

References

  1. ^ "letsrecycle.com - News and information for the Recycling and Waste Management Community". web.archive.org. Archived from the original on 2007-09-27. Retrieved 2009-10-19.
  2. ^ Veolia given EFW green light, www.mrw.co.uk, Retrieved 22.02.07
  3. ^ http://www.veoliaenvironmentalservices.co.uk/southdowns/pages/erf.asp