Jump to content

The Tide (light rail network)

Route map:
From Wikipedia, the free encyclopedia
(Redirected from Witchduck (Tide station))

The Tide
Tide Light Rail train during a test run in January 2011
Overview
OwnerHampton Roads Transit
LocaleNorfolk, Virginia, U.S.
Termini
Stations11
Websitegohrt.com/services/the-tide
Service
TypeLight rail
Rolling stockSiemens S70
Daily ridership2,500 (weekdays, Q3 2024)[1]
Ridership771,500 (2023)[2]
History
OpenedAugust 19, 2011[3]
Technical
Line length7.4 mi (11.9 km)
Number of tracks2
CharacterAt-grade
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
ElectrificationOverhead line750 V DC
Route map
Map The Tide highlighted in blue
EVMC/Fort Norfolk
York Street/Freemason
Monticello
MacArthur Square
Civic Plaza
Harbor Park
Amtrak
NSU
Maintenance and
Storage Facility
Ballentine/Broad Creek
Ingleside Road
Broad Creek
Military Highway
Newtown Road

Handicapped/disabled access All stations are accessible

The Tide is a 7.4 mi (12 km) light rail line in Norfolk, Virginia, United States, owned and operated by Hampton Roads Transit (HRT). It connects Eastern Virginia Medical School, downtown Norfolk, Norfolk State University, and Newtown Road. Service began on August 19, 2011,[3] making it the first light rail system in Virginia. Fares match local bus fares and the line accepts HRT's GO Passes. Trains generally run every 15 minutes, increasing to every 10 minutes during peak periods and every 30 minutes during early mornings and late evenings. In 2023, the system had a ridership of 771,500, or about 2,500 per weekday as of the third quarter of 2024.

History

[edit]

In the late 1980s, the Tidewater Transportation District Commission (TTDC) began producing studies that would examine the feasibility of expanding transit corridors between Norfolk and its neighboring cities of Chesapeake, Portsmouth, Suffolk, and Virginia Beach; these included a study for the cost effectiveness of restoring passenger rail service in 1986 and a rail systems analysis in 1991.[4]: S-1  Four years later, TTDC pursued a Major Investment Study and in 1997, identified a locally preferred alternative for an 18-mile (29 km) east–west light rail line between downtown Norfolk and the Virginia Beach oceanfront.[5]: 10  The alignment would have run along an exclusive double-track right-of-way that followed the Norfolk Southern Railway and contained 13 stations.[4]: S-6–S-7  In 1999, the Virginia Beach City Council asked its residents in a referendum whether it should adopt a local ordinance to help develop and finance the light rail project.[6] On November 2, Virginia Beach residents voted against the referendum, 56 percent to 44 percent.[7]

After Virginia Beach pulled out of a proposal that would have seen the construction of a light rail line connecting downtown Norfolk with the Virginia Beach oceanfront in 1999, Norfolk began developing a network that would be constructed entirely within its city limits.[8]

Beginning in 2000, HRT and federal transit officials worked to create a plan that would attract federal funding. On September 22, 2006, the Federal Transit Administration announced that the proposal met federal criteria for design, and would receive funding for a final design.[8] On October 1, 2007, the FTA signed the agreement to appropriate $128 million for the construction of the network.[9] The remainder of the project will be divided three ways, with the city of Norfolk contributing $33 million, the Commonwealth of Virginia contributing $31.9 million, and $39.2 million being contributed from other federal sources.[9]

Officials announced in June 2007 that the system would be called The Tide, a name that beat out other proposed names, including Bay Runner, First Rail, Dash, Bay Breeze, Sail and Shore Line.[10]

Construction problems

[edit]

The line had been planned to open in January 2010, however cost overruns, extended testing of trains, and electronic signage required three delays.

In January 2010, HRT's executive director, Michael Townes, was pressured by the board of directors and ultimately agreed to step down after the project overshot its budget by $100 million and missed by one year its operational deadline. A majority of the board members cited poor management and communication on his part. He was to serve at full pay and benefits helping with a transition and continue to seek additional funding until September 2010, after which the board agreed to a severance package of full pay and benefits for another full year.[11] As an interim measure, the board hired former VDOT Commissioner Philip Shucet for 1 year effective February 1, 2010 at the rate of $40,000 per month to lead the agency, with a mandate to restore financial integrity and communication pending selection of a new executive director.[12]

In May 2010 elections, voters ousted Norfolk city councilman Randy Wright, a long-time incumbent, HRT board member, and light rail supporter. His opponent, also an advocate of light rail, cited the waste and delays under Towne's administration. Another HRT board member, Paige Washington, also lost a reelection bid in Hampton. News media sources reported that "Three million dollars [of HRT funds designated for projects on the Virginia Peninsula] were diverted to Norfolk to [help] pay for its light rail cost overrun".[13]

Opening

[edit]

On June 21, 2011, HRTs announced the line would open on August 19 initially with demonstration rides followed by regular service beginning on August 22.[3] Due to high ridership during the initial demonstration period, estimated at over 46,000 riders, the demonstration period was extended, with regular service to begin on August 28.[14]

On September 21, 2011, Hampton Roads Transit announced the introduction of online ticketing and onboard WiFi to The Tide.[15]

Financing

[edit]

The Tide cost $318 million to construct, and is estimated to cost $6.2 million a year to operate.

The line was primarily financed by a $232 million grant from the Federal Transit Administration approved in October 2007.[16] Additional federal funding came from a $32.8 million grant from the American Recovery and Reinvestment Act.[16] The final cost of the project was estimated to be $318.5 million, $106 million over the original estimate[14] — or approximately just under $27 million per kilometer ($43 million per mile)."[14]

Rolling stock

[edit]
The Tide Light Rail Siemens S70 train interior
The interior of one of the Siemens S70 trains as seen from the middle section

In September 2007, HRT's commission voted to purchase nine Siemens-built S70 vehicles, similar to those currently in operation in Houston, Texas and Charlotte, North Carolina.[9] These vehicles formed The Tide's initial fleet of light rail vehicles, with the first car arriving on October 6, 2009.[17] The vehicles are currently stored at the Norfolk Tide Facility at 1850 Brambleton Avenue, east of NSU station on the rail line. [18]

Service

[edit]

The trains generally run every 15 minutes; they run every 10 minutes during peak periods and every 30 minutes during early weekend mornings and late evenings.[19] Light rail service is offered from 6:00 a.m. through 10 p.m Mondays through Thursdays, 6:00 a.m. through midnight on Fridays and Saturdays, 7:00 a.m through 9:00 p.m. on Sundays, and 9:00 a.m. through 9:00 p.m. on federal holidays.[19]

Ridership

[edit]

Daily ridership in 2011 was projected at 2,900 passengers,[20] increasing to 7,130 passengers by 2030.[21] Actual daily ridership up to April 17, 2012 was approximately 4,900, allowing the service to reach its goal of 1 million rides 150 days earlier than had been projected.[22]

Route

[edit]
Part of the Tide's original route parallels I-264.

The Tide is designed with the hope that TOD (Transit-oriented development) will be constructed along the light rail line, creating a smart growth transit corridor to help guide growth using compact mixed-use development practices, as well as curbing traffic congestion.[citation needed]

Most of the Tide's route east of downtown Norfolk operates on newly-laid track along the former Norfolk Southern Railway line that runs due east to the resort area of Virginia Beach. The Norfolk Southern Railway had previously abandoned that line. That right-of-way had carried both freight and passenger traffic until the end of World War II, and then operated as a freight-only railway for several additional decades. The current eastern end of The Tide is at Newtown Road, which is the Norfolk-Virginia Beach boundary line.

By contrast, The Tide's route from the Harbor Park area west within downtown Norfolk and north-west to the Medical Center area is entirely new right-of-way.

Stations

[edit]
Key
Terminus
Parking Park and ride
Station[23] Opened Vertical alignment Platform layout Connections and notes
EVMC/Fort Norfolk August 19, 2011 At-grade 1 side platform Bus interchange: 2, 23; Parking
York Street/Freemason At-grade 2 side platforms
Monticello At-grade 1 island platform Bus interchange: 1, 3
MacArthur Square At-grade 2 side platforms Bus interchange: 6, 8, 45, 960
Civic Plaza At-grade 2 side platforms Bus interchange: 6, 8, 45, 960, 961
Harbor Park At-grade 1 island platform Amtrak Amtrak: Northeast Regional; Parking
NSU Elevated 1 island platform Bus interchange: 9, 13, 18
Ballentine/Broad Creek At-grade 1 island platform Bus interchange: 18; Parking
Ingleside Road At-grade 2 side platforms
Military Highway At-grade 2 side platforms Bus interchange: 15, 23, 967; Parking
Newtown Road At-grade 1 side platform Bus interchange: 20, 22, 25, 27, 960; Parking

Incidents

[edit]

On December 28, 2023, a 14 year old boy was shot on board one of the light rail vehicles while it was in downtown Norfolk. The driver was able to quickly get help and the injuries were reported to not be life-threatening. A 16 year old and 14 year old were arrested and charged for the crime. In response, HRT said that they would increase security on the trains and at the stations.[24][25]

Future expansion

[edit]

The Commonwealth of Virginia's Department of Rail & Public Transportation is studying possible extensions to The Tide in several different directions within the multi-city Hampton Roads area.[26]

Hampton Roads Transit, the Hampton Roads Transportation Planning Organization, and local cities are exploring extensions of the starter line. Possible extensions might run north to the Norfolk Naval Base, east to the Virginia Beach oceanfront and resort area, west to Portsmouth, and south to Chesapeake.

A ticket vending machine

Chesapeake

[edit]

One possible extension would run south from Norfolk, probably terminating in the Greenbrier area of Chesapeake, Virginia.[26]

Norfolk

[edit]

A second possible extension would continue The Tide from the Medical Center terminus to Naval Station Norfolk,[26] which would connect Old Dominion University to the light rail service. The naval base is one of the largest employers in the Hampton Roads area and ODU is a large public university. In 2018, HRT determined this extension would be too costly and instead began to focus on an extension in the eastern portion of the city to include Military Circle.

Peninsula

[edit]

The Peninsula Rapid Transit Project is exploring the feasibility of light rail in Newport News. Likely stops for The Tide on the Peninsula would include downtown Newport News, the Newport News Amtrak passenger railway station, the Oyster Point area, and Newport News/Williamsburg International Airport. An extension between downtown Newport News and downtown Hampton is also being considered.[26]

Virginia Beach

[edit]

This proposed LRT extension would continue along the former Norfolk Southern (NS) Railway right of way. Major stops would be located at Virginia Beach Town Center in the Pembroke area, near Oceana Naval Air Station, and would terminate in the resort area at the Virginia Beach Convention Center, a few blocks west of the Atlantic Ocean.[26] A possible spur would branch at the NS Railway's Oceana Junction (just east of London Bridge Road and just north of Potters Road) and use the existing abandoned railway right-of-way along the west side of Oceana Naval Air Station to the south. As another possible LRT extension, most of the former NS Railway line from the Witchduck Road area south to the Virginia Beach Municipal Center remains currently undeveloped.

In 2011 the city of Virginia Beach suggested it might extend The Tide light rail service east from the Newtown Road terminus. Virginia Beach's mayor at the time, Will Sessoms, said the city hoped to purchase the right of way. The city subsequently purchased the tracks for $40 million, using $10 million of local tax funds – which would allow a total rail length of about 18 miles (29 km). The extension is estimated to cost $254 million to the Town Center and $807 million to the Oceanfront.[27]

In 2016, voters in Virginia Beach rejected expansion of the light rail into the municipality. Consequently, all planning for extension of the system into Virginia Beach has been halted indefinitely.[28]

History

[edit]

In November 1999, the City of Virginia Beach conducted a referendum regarding the construction and operation of light rail into Virginia Beach along the Norfolk Southern (NS) railroad line. The proposed route would connect downtown Norfolk to the Virginia Beach oceanfront. The referendum led to a community discussion of the proposed light rail and feeder bus system. Local media and special interest groups debated the matter in great detail, using information provided by a Draft Environmental impact statement (DEIS). Voters of Virginia Beach rejected the proposed light rail system citing possible unwanted bad elements a passenger train could bring.[citation needed]

Virginia Beach City Council then passed a 10-year resolution declaring that the city would no longer have any future involvement in the proposed light rail line.

Years later, a major economic and development hub was built along the NS corridor, known as Virginia Beach Town Center. The new Town Center, along with record high gas prices in 2008, changed the narrative and resulted in new public interest in rail again.

Virginia Beach then purchased the section of track within their jurisdiction from NS.[29]

In April 2012, the Virginia Beach City Council voted 10–1 to allow voters to determine the fate of the extension in the November 2012 general election.[27]

In the April 2011 State of the City, Sessoms said "whether the corridor is eventually developed with Bus Rapid Transit or a light rail line is unknown at this time," citing cost and ridership issues.[30]

In April 2011, HRT paused the study until 9–12 months of ridership data from the Tide Light Rail in Norfolk is collected.

In November 2012, voters approved a non-binding referendum supporting expansion of light rail into Virginia Beach by a 62 percent majority. A study to fix costs for the project will be completed in 2014.[31] The State of Virginia has pledged $155 million towards the extension to Virginia Beach, as well as lending up to $30 million from the Virginia Transportation Infrastructure Bank.[32] The final route selected by the Virginia Beach City Council was the 3.5 mile short extension to the Town Center at Virginia Beach in mid-2015.[32][33][34]

On November 8, 2016, after a successful vote four years earlier and a 30% Preliminary Design finished a month earlier, 57% of Virginia Beach voters voted against the referendum regarding to use city funds to pay part of the Town Center extension, which would have been close to $90 million. As a result, all work on the light rail extension was stopped, including discontinuing the order for three more light rail cars and Virginia's Secretary of Transportation Aubrey Layne reappointed the $155 million back to the Smart Scale program for transportation funding throughout the Commonwealth. The cost of extending the line was $243.1 million, with around $80 million per mile. The Virginia Beach City Council had several months to decide what to do with the purchased railroad line. If they could not decide, the city had to refund the $20 million back to Virginia.[35] The Virginia Beach City Council ended up deciding to refund the $20 million back to the state.[36]

See also

[edit]

References

[edit]
  1. ^ "Transit Ridership Report Third Quarter 2024" (PDF). American Public Transportation Association. November 20, 2024. Retrieved November 23, 2024.
  2. ^ "Transit Ridership Report Fourth Quarter 2023" (PDF). American Public Transportation Association. March 4, 2024. Retrieved September 5, 2024.
  3. ^ a b c "Norfolk light rail to debut Aug. 19". Trains Magazine. June 21, 2011. Retrieved July 3, 2011.
  4. ^ a b Final Environmental Impact Statement: Norfolk–Virginia Beach Light Rail Transit System East/West Corridor Project (Report). Vol. 1. Federal Transit Administration. March 2000.
  5. ^ The Tide Light Rail Project Before-and-After Study (2015) (PDF) (Report). Federal Transit Administration. 2015. Retrieved May 11, 2020.
  6. ^ Glynn, Matt (November 4, 1999). "Beach "No" may affect light-rail here". Daily Press. Retrieved May 11, 2020.
  7. ^ Pascale, Jordan (November 8, 2016). "Virginia Beach light rail referendum fails in a landslide". The Virginian-Pilot. Retrieved May 11, 2020.
  8. ^ a b Messina, Debbie (September 26, 2006). "Norfolk light-rail line passes federal review, years of delay". The Virginian-Pilot.
  9. ^ a b c Messina, Debbie (September 30, 2007). "Norfolk's light rail gets the green light". The Virginian-Pilot.
  10. ^ "Norfolk light rail nears reality; it now has a name, too". The Virginian-Pilot. June 27, 2007.
  11. ^ Messina, Debbie (January 12, 2010). "HRT head Michael Townes, under fire, agrees to retire". The Virginian-Pilot. Retrieved August 20, 2011.
  12. ^ Messina, Debbie (January 29, 2010). "Former VDOT chief picked as interim leader of HRT". The Virginian-Pilot. Retrieved August 20, 2011.
  13. ^ Anderson, Michael (March 23, 2010). "Letters to the Editor:Woodbury's HRT". Daily Press. Retrieved August 20, 2011.
  14. ^ a b c "The Tide comes in". Railway Gazette International. August 22, 2011. Archived from the original on October 4, 2012. Retrieved August 24, 2011.
  15. ^ "Norfolk's 'The Tide' light-rail line makes changes, adds WiFi". Trains Magazine. September 21, 2011. Retrieved September 23, 2011.
  16. ^ a b "The Tide opens in Norfolk". Progressive Railroading. August 19, 2011. Archived from the original on September 1, 2011. Retrieved August 24, 2011.
  17. ^ Messina, Debbie (October 7, 2009). "Light-rail cars arrive in Norfolk". The Virginian-Pilot. Retrieved March 2, 2010.
  18. ^ Transit, Hampton Roads. "Facilities". Hampton Roads Transit. Retrieved March 11, 2024.
  19. ^ a b "Tide Map & Schedule". Hampton Roads Transit. Retrieved July 26, 2011.
  20. ^ Hixenbaugh, Mike (August 20, 2011). "Crowds continue lining up for a ride on light rail". The Virginian-Pilot. Retrieved June 12, 2019.
  21. ^ Pascale, Jordan (August 13, 2016). "Five years of the Tide light rail in Norfolk: What was said then, and the reality now". The Virginian-Pilot. Retrieved July 12, 2019.
  22. ^ "One MIllion Tide Rides". Hampton Roads Transit. April 16, 2012. Archived from the original on May 11, 2012. Retrieved May 11, 2012.{{cite news}}: CS1 maint: unfit URL (link)
  23. ^ "Route 800 EVMC/Fort Norfolk Station to Newton Road Station" (PDF). Hampton Roads Transit. March 23, 2018. Retrieved July 12, 2019.
  24. ^ Reese, Brian (December 29, 2023). "Teens charged after 14-year-old shot on light rail in downtown Norfolk". WAVY.com. Retrieved January 23, 2024.
  25. ^ Steger, Preston (December 29, 2023). "2 teens arrested after 14-year-old shot on Norfolk light rail, police say". 13newsnow.com. Retrieved January 23, 2024.
  26. ^ a b c d e "Hampton Roads Regional Vision Plan" (PDF). Virginia Department of Rail and Public Transportation. Fall 2010. Retrieved August 20, 2011.
  27. ^ a b "Virginia Beach to vote on LRT". Railway Age. April 27, 2012. Retrieved May 6, 2012.
  28. ^ Online, Pilot (November 9, 2016). "Virginia Beach light rail referendum vote fails in a landslide". The Virginian-Pilot. Retrieved September 13, 2024.
  29. ^ "Va. Beach to get $20M from state to buy possible light-rail line". The Virginian-Pilot. March 6, 2009. Retrieved May 11, 2020 – via BLET.
  30. ^ Sessoms, William D. Jr. (April 14, 2011). "Full Text: Virginia Beach State of the City Address". AltDaily. Retrieved August 20, 2011.
  31. ^ Souza, Gabriella (November 7, 2012). "Full Text: Light Rail Passes Easily In Virginia Beach". PilotOnline. Retrieved November 27, 2012.
  32. ^ a b "Virginia firms up commitment to Norfolk light rail extension". Trains Magazine. April 16, 2015. Retrieved April 24, 2015.
  33. ^ Nyczepir, Dave (March 16, 2016). "Virginia Beach Official Faces Millennial Backlash Over Transit Comments". Route Fifty. Washington, D.C.: Atlantic Media. Retrieved March 21, 2016.
  34. ^ Skelton, Alissa (April 5, 2016). "Virginia Beach council signals it wants to move forward with light rail". The Virginian-Pilot. Retrieved April 6, 2016.
  35. ^ Pascale, Jordan (November 9, 2016). "Transportation Secretary Directs State to Stop Work on Virginia Beach-Light Rail Project". Virginian Pilot.
  36. ^ Skelton, Alissa (March 21, 2017). "Virginia Beach City Council votes to pay back $20 million loan for light rail". The Virginian-Pilot. Retrieved September 13, 2024.
[edit]
KML is from Wikidata

Extensions