Jump to content

Port Alma Wind Farm: Difference between revisions

Coordinates: 42°14′N 82°24′W / 42.233°N 82.400°W / 42.233; -82.400
From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
Line 4: Line 4:


The wind farm consists of forty four [[Siemens]] 2.3 [[megawatt|(MW)]] Mark II [[wind turbine]]s, with an installed capacity of 101.2 (MW). It is capable of generating approx. 300 [[gigawatt-hour|(GWh)]] annually, which will produce enough energy to power 30,000 households.
The wind farm consists of forty four [[Siemens]] 2.3 [[megawatt|(MW)]] Mark II [[wind turbine]]s, with an installed capacity of 101.2 (MW). It is capable of generating approx. 300 [[gigawatt-hour|(GWh)]] annually, which will produce enough energy to power 30,000 households.
<gallery>
File:http://www.sygration.com/cgi-bin/gengraph?g=PORTALMA-T1&s=s|Current Output
</gallery>


The project study area is approx. 285&nbsp;km² centered on Port Alma.
The project study area is approx. 285&nbsp;km² centered on Port Alma.
Line 30: Line 33:
[[Category:Proposed wind farms in Canada]]
[[Category:Proposed wind farms in Canada]]
[[Category:Wind farms in Ontario]]
[[Category:Wind farms in Ontario]]
<gallery>
<gallery>
File:Example.jpg|Caption1
File:Example.jpg|Caption2
</gallery>
</gallery>

Revision as of 16:52, 1 October 2010

Port Alma Wind Farm is a large wind farm project located on the north shore of Lake Erie in the Municipality of Chatham–Kent, Ontario, Canada.

It began generating electricity in November, 2008.[1] It is owned and operated by Kruger Energy. The power will be fed into the Ontario electricity market administered by the Independent Electricity System Operator.

The wind farm consists of forty four Siemens 2.3 (MW) Mark II wind turbines, with an installed capacity of 101.2 (MW). It is capable of generating approx. 300 (GWh) annually, which will produce enough energy to power 30,000 households.

The project study area is approx. 285 km² centered on Port Alma.

A substation was built to step-up the power to transmission level voltage and approximately 10 kilometres (6.2 mi) of transmission line was built for connection to the Hydro One owned 230 kV circuits about 10 kilometres (6.2 mi) east of Tilbury.[2]