Jump to content

Dufferin station: Difference between revisions

Coordinates: 43°39′36.3″N 79°26′07.5″W / 43.660083°N 79.435417°W / 43.660083; -79.435417
From Wikipedia, the free encyclopedia
Content deleted Content added
Suigi (talk | contribs)
No edit summary
Line 3: Line 3:
| type = TTC Subway Station
| type = TTC Subway Station
| style = Bloor–Danforth
| style = Bloor–Danforth
| image = TTC_Dufferin_-_Digital_Rendering.PNG
| image = Dufferin TTC station.jpg
| image_caption =
| image_caption =
| address = 1126 Bloor Street West
| address = 1126 Bloor Street West
Line 55: Line 55:
<gallery caption="" widths="200px" heights="100px" perrow="2">
<gallery caption="" widths="200px" heights="100px" perrow="2">
File:Dufferin Station - TTC.jpg|Entrance on the west side of Dufferin St.
File:Dufferin Station - TTC.jpg|Entrance on the west side of Dufferin St.
File:Dufferin TTC station.jpg|The west-side street entrance at night
</gallery>
</gallery>



Revision as of 03:53, 28 December 2010

Dufferin
TTC Subway Station
File:Dufferin TTC station.jpg
General information
Location1126 Bloor Street West
Coordinates43°39′36.3″N 79°26′07.5″W / 43.660083°N 79.435417°W / 43.660083; -79.435417
Line(s)
Platformsside
Construction
Structure typeunderground
History
Opened25 February 1966
Passengers
2023–2024[1]26,800
Services
Preceding station   TTC   Following station
Template:TTC lines

Dufferin is a station on the Bloor-Danforth line of the subway system in Toronto, Ontario, Canada. It is located at 1126 Bloor Street West at Dufferin Street. It was opened in 1966.

Nearby landmarks

Nearby landmarks include Dufferin Mall, Bloor Collegiate Institute, and the Bloor-Gladstone branch of the Toronto Public Library.

Surface connections

A transfer is required to connect between the subway and bus routes at this station

  • 29 Dufferin to Wilson Station (northbound)
  • 29 Dufferin to Exhibition Place (southbound)
  • 402 Parkdale (Community Bus)

Station modernization

Dufferin station is scheduled for upgrades and modernization under the TTC's Station Modernization programme. Preliminary work has commenced as of September 2009 and the project is expected to take two and a half years to complete. The "modernization" will include the installation of elevators for accessibility, the installation of a second entrance from Russett Ave., rebuilding of the bus waiting area, and new and modernized station finishes, art and lighting. [2]

References

  1. ^ "Subway ridership, 2023-2024" (PDF). Toronto Transit Commission. Retrieved November 12, 2024. This table shows the typical number of customer-boardings made on each subway line and the number of customers travelling to and from each station platform on a typical weekday in Sep 2023-Aug 2024.
  2. ^ http://www3.ttc.ca/Service_Advisories/Construction/Dufferin_Station_Modernization.jsp