Jump to content

Tampines MRT station: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
No edit summary
Line 36: Line 36:
| map_locator={{Superimpose| base = MRT map EWDT.svg
| map_locator={{Superimpose| base = MRT map EWDT.svg
| base_width = 300px
| base_width = 300px
| base_caption = East West & Downtown Lines
| base_caption = East West & Downtown Lines (under construction)
| float = Red Dot.svg
| float = Red Dot.svg
| float_width = 5px
| float_width = 5px

Revision as of 07:46, 13 January 2016

 EW2 = DT32 
Tampines MRT Station
淡滨尼地铁站
தெம்பினிஸ்
Stesen MRT Tampines
Rapid transit
Platform of Tampines MRT station.
General information
Location20 Tampines Central 1
Singapore 529538
Coordinates1°21′9.10″N 103°56′43.16″E / 1.3525278°N 103.9453222°E / 1.3525278; 103.9453222
Operated bySMRT Trains (SMRT Corporation) (East West Line)
SBS Transit DTL (Downtown Line)
Line(s)
PlatformsIsland
Tracks2
ConnectionsBus, Taxi
Construction
Structure typeElevated (East West Line)
Underground (Downtown Line)
Platform levels2
Bicycle facilitiesYes
AccessibleYes
Other information
Station code EW2  DT32 
History
Opened16 December 1989 (East West Line)
2017 (Downtown Line)
Previous namesTampines North
Services
Preceding station   Mass Rapid Transit   Following station
Template:SMRT lines
Template:SMRT lines
Future service
Exterior of Tampines MRT Station.
Tampines MRT Station at night.

Tampines MRT Station is an elevated Mass Rapid Transit (MRT) station that is part of the East West Line in Singapore and serves the town of Tampines. Tampines station was one of the first few stations on the East West Line to be installed with barrier free facilities, excluding the tactile guide.

Tampines is one of the four MRT stations to appear in the original Singapore edition of the board game Monopoly.

The station will be an interchange station for the Downtown Line when it opens in 2017.

There will be no paid link between the East West Line and Downtown line stations, meaning commuters who want to change to the downtown line would be required to exit the East West Line Station by tapping out of the EWL station gantries. Thereafter, they would have to walk to the Downtown Line station, enter the DTL station by tapping in at the fare gantries again before getting to the platforms and vice versa.

History

Train disruptions

On 21 January 2008, a maintenance works train which was carrying out works between Tampines and Simei (westbound) broke down, causing a disruption from 5.28 am to 12.45 pm on both the eastbound and westbound services from Pasir Ris and Tanah Merah, affecting 57,000 commuters.[1] SMRT was fined S$387,176 (approximately US$280,562) on 10 March 2008 after the LTA's investigations concluded that the disruption was due to SMRT's working party not complying with operating procedures. This was specifically on securing the parked portion of the maintenance train, which comprised a locomotive and a wagon. The fine was the largest ever for a rail related incident in Singapore. According to operating procedures, during maintenance works, the portion comprising a locomotive and a Rail Grinding Vehicle will proceed with its works, while the portion of the maintenance train is detached and parked at a distance from the working zone. However, investigations from LTA and SMRT showed that SMRT did not apply the locomotive's parking brake. There was also no wheel chock placed to prevent movement along the gradient of the track. If SMRT had followed operating procedures, a roll-back would have been prevented.[2]

On 20 March 2008, SMRT announced that it had decided to appeal to the LTA against the fine. In a letter, SMRT said it had provided free shuttle bus services to help affected commuters. SMRT also mobilised more than 300 staff for on-site recovery, crowd management, dissemination of information and preparation for resumption of service.[3]

On 3 April 2008, LTA turned down SMRT's appeal for a lower fine and ordered SMRT to pay the fine in full within two weeks.[4]

Station layout

L2 Platform A Template:SMRT lines towards  EW1  Pasir Ris (→)
Island platform, doors will open on the right
Platform B Template:SMRT lines towards  EW29  Joo Koon via  EW3  Simei (←)
L1 EWL Concourse Faregates, Ticketing Machines, Station Control
Street Level Eastlink Mall, Tampines Mall, Century Square, Tampines 1, Tampines Bus Interchange
B1 Concourse Faregates, Ticketing Machines, Station Control, Transitlink Counter
B2 Platform B Template:SMRT lines (future service) towards  DT35  CG1  Expo via  DT33  Tampines East (→)
Island platform, doors will open on the right
Platform A Template:SMRT lines (future service) towards  DT1  BP6  Bukit Panjang via  DT31  Tampines West (←)

Exits

There are several exits in Tampines MRT Station. However, this will be linked together when Downtown Line opens in 2017. There will be no paid link between the East West Line and Downtown line, meaning commuters would be required tap in and tap out when transferring lines.

East West Line:

  • A: Eastlink Mall
  • B: Tampines 1
  • C: Tampines Mall, Century Square

Downtown Line:

  • A: Eastlink Mall, Tampines Bus Interchange
  • B: Tampines Concourse
  • C: Tampines Bus Interchange, Tampines Central 1

Station modifications

Installation of platform screen doors at the station started on 17 April 2011 and began operations since 2 July 2011.[5]

High volume, low speed (HVLS) fans

To improve the ventilation at elevated MRT stations, Land Transport Authority (LTA) will be embarking on an island-wide project to fit all 36 elevated MRT stations with high volume, low speed (HVLS) fans to improve the air circulation at station platforms.[6] Tampines is the first station of the 36 elevated stations, installed with Rite Hite Revolution High Volume, Low Speed (HVLS) fans, which started operating since 28 May 2012.

Transport connections

Rail

Destination First Train Last Train
Mon – Sat Sunday &
Public Holiday
Daily
colspan="7" style="background-color:#Template:SMRT color;color:white; height:25px" | East West Line
to EW1 Pasir Ris 5.21am 5.47am 12.37am
to EW29 Joo Koon 5.31am 5.57am 11.26pm
colspan="7" style="background-color:#Template:SMRT color;color:white; height:25px" | Downtown Line
to DT1 Bukit Panjang
to DT35 Expo

References

  1. ^ "57,000 affected by seven-hour MRT train disruption". Channel NewsAsia. 21 January 2008.
  2. ^ "SMRT fined almost S$400,000 for 7-hour train disruption in January". Channel NewsAsia. 10 March 2008.
  3. ^ "SMRT appeals to LTA to review S$400,000 penalty". Channel NewsAsia. 20 March 2008.
  4. ^ "LTA rejects SMRT's request for reduced penalty amount". Channel NewsAsia. 3 April 2008.
  5. ^ Wong, Siew Ying (January 26, 2008). "Above-ground MRT stations to have platform screen doors by 2012". Channel NewsAsia. Retrieved February 1, 2012.
  6. ^ "Enhancing Connectivity and Comfort for Commuters". Land Transport Authority. October 13, 2011. Retrieved July 6, 2012.