Myrtle–Willoughby Avenues station: Difference between revisions
No edit summary |
Cyberbot II (talk | contribs) Rescuing 1 sources, flagging 0 as dead, and archiving 0 sources. #IABot |
||
Line 42: | Line 42: | ||
== External links == |
== External links == |
||
* {{NYCS ref|http://www.nycsubway.org/perl/stations?207:2084|IND Crosstown Line|Myrtle–Willoughby Avenues}} |
* {{NYCS ref|http://www.nycsubway.org/perl/stations?207:2084|IND Crosstown Line|Myrtle–Willoughby Avenues}} |
||
* Station Reporter — [http://www.stationreporter.net/gtrain.htm G Train] |
* Station Reporter — [https://web.archive.org/20090724114307/http://www.stationreporter.net:80/gtrain.htm G Train] |
||
* The Subway Nut — [http://www.subwaynut.com/ind/myrtle_willoughbyg/index.php Myrtle–Willoughby Avenues Pictures] |
* The Subway Nut — [http://www.subwaynut.com/ind/myrtle_willoughbyg/index.php Myrtle–Willoughby Avenues Pictures] |
||
* [http://maps.google.com/maps?hl=en&ie=UTF8&ll=40.695355,-73.949372&spn=0,0.013314&z=17&layer=c&cbll=40.695395,-73.949062&panoid=fs3phIej979pUcA1bfUgIg&cbp=12,24.06,,0,5.22 Myrtle Avenue entrance from Google Maps Street View] |
* [http://maps.google.com/maps?hl=en&ie=UTF8&ll=40.695355,-73.949372&spn=0,0.013314&z=17&layer=c&cbll=40.695395,-73.949062&panoid=fs3phIej979pUcA1bfUgIg&cbp=12,24.06,,0,5.22 Myrtle Avenue entrance from Google Maps Street View] |
Revision as of 16:39, 18 February 2016
This article relies largely or entirely on a single source. (November 2015) |
Myrtle–Willoughby Avenues | |||||||
---|---|---|---|---|---|---|---|
![]() | |||||||
![]() Northbound platform | |||||||
Station statistics | |||||||
Address | Myrtle Avenue & Marcy Avenue Brooklyn, NY 11206 | ||||||
Borough | Brooklyn | ||||||
Locale | Bedford-Stuyvesant | ||||||
Coordinates | 40°41′41″N 73°56′57″W / 40.694631°N 73.949103°W | ||||||
Division | B (IND)[1] | ||||||
Line | IND Crosstown Line | ||||||
Services | G ![]() | ||||||
Transit | ![]() | ||||||
Structure | Underground | ||||||
Platforms | 2 side platforms | ||||||
Tracks | 2 | ||||||
Other information | |||||||
Opened | July 1, 1937 | ||||||
Opposite- direction transfer | Yes | ||||||
Traffic | |||||||
2023 | 1,265,040[2] ![]() | ||||||
Rank | 242 out of 423[2] | ||||||
Station succession | |||||||
Next north | Template:NYCS next | ||||||
Next south | Template:NYCS next | ||||||
| |||||||
| |||||||
|
Myrtle–Willoughby Avenues is a station on the IND Crosstown Line of the New York City Subway. Located at the intersection of Myrtle and Marcy Avenues in Bedford-Stuyvesant, Brooklyn, it is served by the G train at all times.
Station layout
Ground | Street level | Entrances/exits |
Mezzanine | Station agent, fare control, MetroCard machines | |
Basement 2 | Side platform | |
Northbound | ← ![]() | |
Southbound | ![]() | |
Side platform | ||
Underpass | Connection between platforms |
![](http://upload.wikimedia.org/wikipedia/commons/thumb/9/9c/Myrtle_Willoughby_G_closed_stair_jeh.jpg/250px-Myrtle_Willoughby_G_closed_stair_jeh.jpg)
This underground station, opened on July 1, 1937 as part of the extension of the Crosstown Line from Nassau Avenue to Hoyt-Schermerhorn Streets.[4] This station has two tracks and two side platforms. Both platforms have a light green trim line on a darker green border that is cut up into numerous sections due to the large name tablets, which have "MYRTLE - WILLOUGHBY AVE." on two lines in white sans serif font on a dark green background and a lighter green border. There are small directional signs pointing to fare control below the name tablets and station name signs below the trim line that alternate between "MYRTLE" and "WILLOUGHBY," both of which have white lettering on a black tile background. Vent chambers are located on the tile wall. Both platforms have blue I-beam columns at regular intervals with every other one having the standard black station name plate in white lettering.
The platforms each have one same-level fare control area at their north ends. The one on the Church Avenue-bound side has a bank of three turnstiles, token booth, and staircase going up to the northwest corner of Marcy and Myrtle Avenues. The one on the Queens-bound side is unstaffed, containing two High Entry/Exit turnstiles and one exit-only turnstile and a short double-wide staircase that goes up to a short landing before a standard perpendicular staircase goes up to the northeast corner of Myrtle and Marcy Avenues. Two staircases on both platforms adjacent to fare control go down to a crossunder to allow a free transfer between directions. Both platforms formerly had another same-level entrance/exit at their south ends and directional signs indicate they led to Willoughby Avenue. The spaces are sealed off from the platforms with chain link fences and some of the single street staircases on each side remain intact.
References
- ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
- ^ a b "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
- ^ "Facts and Figures: Annual Subway Ridership". Metropolitan Transportation Authority. Retrieved 2015-04-27.
- ^ "New Crosstown Subway Line Is Opened". Brooklyn Daily Eagle. July 1, 1937. Retrieved 24 December 2015.
External links
- nycsubway.org – IND Crosstown Line: Myrtle–Willoughby Avenues
- Station Reporter — G Train
- The Subway Nut — Myrtle–Willoughby Avenues Pictures
- Myrtle Avenue entrance from Google Maps Street View