Jump to content

Line 6 (Chongqing Rail Transit)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 154.91.39.77 (talk) at 14:56, 26 January 2021. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Line 6
6
Hongqihegou Station platform
Overview
Statusoperational
Termini
Stations40

(28 on the main line)

(12 on the International Expo branch)
Service
Typerapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit Corp., Ltd
Daily ridership452,300 (2016 Peak)[1]
History
Opened28 September 2012; 11 years ago (2012-09-28)
Technical
Line length85.54 km (53.15 mi)
Track gauge1435 mm
Operating speed100 km/h (peak)
Route map

Chongqing E.
Chayuan
Changshenglaojie
Qiujiawan
Baileyuan
Changshengqiao
Bus interchange
Liujiaping
Changsheng depot
Shangxinjie
Xiaoshizi
Grand Theater
Jiangbeicheng
Wulidian
Hongtudi
Huangnibang
3 Bus interchange
Hongqihegou
Huahuiyuan
Dalongshan
Ranjiaba
Guangdianyuan
Dazhulin depot
Dazhulin
Kangzhuang
Jiuquhe
International
Expo branch
[a]
Lijia
Happy Valley
Jinshansi
Huangmaoping
Gaoyikou
Caojiawan
Caijia
International
Expo Center
Xiangjiagang
Yuelai
Wangjiazhuang
Qingxihe
Longfengxi depot
Caojiawan depot
Longfengxi
Liujiayuanzi
Zhuangyuanbei
Beibei Railway Station Bus interchange
Siyuan
Southwest University
Fuxing
Beibei
Bus interchange
Hongyanping
Shaheba
  1. ^ Through-service from/to main line suspended

CRT Line 6 (and the branch line branded as International Expo line) is the second heavy rail subway line in Chongqing. It opened with provisional revenue service on September 28, 2012, and connects Nan'an, Yuzhong, and Jiangbei districts in central Chongqing.

Interior of a Line 6 train

Opening timeline

Segment Commencement Length Station(s) Name
Wulidian – Kangzhuang 28 September 2012 13.91 km (8.64 mi) 9 Phase 1 (initial section)
Kangzhuang – Lijia 26 December 2012 3.9 km (2.42 mi) 1 Phase 1 (2nd section)
Ranjiaba 20 January 2013 Infill station 1
Lijia – Yuelai 15 May 2013 12.1 km (7.52 mi) 2 International Expo line Phase 1
Lijia – Beibei 31 December 2013 23.4 km (14.54 mi) 4 Phase 2 (northern section)
Jiuquhe, Tiansheng 28 September 2014 Infill stations 2
Xiangjiagang 26 November 2014 Infill station 1
Chayuan – Wulidian 30 December 2014 19.2 km (11.93 mi) 7 Phase 1 (final section) & Phase 2 (southern section)
Pingchang,[a] Huangmaoping 28 February 2015 Infill stations 2
Caojiawan, Gaoyikou 26 October 2015 Infill stations 2
Jiangbeicheng 28 January 2016 Infill station 1
Yuelai – Shaheba 31 December 2020 13.99 km (8.69 mi)[2] 7 International Expo line Phase 2
  1. ^ Currently named as Happy Valley.

Stations (south to north)

Service
routes
Station
Station name Connections Distance
km
Location
English Chinese
6/01 Template:CRT stations 茶园 0.00 0.00 Nan'an
6/02 Template:CRT stations 邱家湾 1.40 1.40
6/03 Template:CRT stations 长生桥 1.70 3.10
6/04 Template:CRT stations 刘家坪 1.80 4.90
6/05 Template:CRT stations 上新街 Loop 6.70 11.60
6/06 Template:CRT stations 小什字 1 1.40 13.00 Yuzhong
6/07 Template:CRT stations 大剧院 1.25 14.25 Jiangbei
6/08 Template:CRT stations 江北城 9 1.00 15.25
6/09 Template:CRT stations 五里店 9 Loop 1.30 16.55
6/10 Template:CRT stations 红土地 10 1.45 18.00
6/11 Template:CRT stations 黄泥磅 1.35 19.35
6/12 Template:CRT stations 红旗河沟 3 1.20 20.55 Yubei
6/13 Template:CRT stations 花卉园 4 1.35 21.90
6/14 Template:CRT stations 大龙山 5 1.85 23.75
6/15 Template:CRT stations 冉家坝 5 Loop 0.70 24.45
6/16 Template:CRT stations 光电园 2.15 26.60
6/17 Template:CRT stations 大竹林 3.05 29.65
6/18 Template:CRT stations 康庄 0.80 30.45
6/19 Template:CRT stations 九曲河 2.15 32.6
6/20 Template:CRT stations 礼嘉 1.60 34.20
6/21 Template:CRT stations 金山寺 1.35 35.55
6/22 Template:CRT stations 曹家湾 5.15 40.70 Beibei
6/23 Template:CRT stations 蔡家 1.90 42.60
6/24 Template:CRT stations 向家岗 1.95 44.55
6/25 Template:CRT stations 龙凤溪 8.75 53.30
6/26 Template:CRT stations 状元碑 1.75 55.05
6/27 Template:CRT stations[3] 西南大学[3] 2.90 57.95
6/28 Template:CRT stations 北碚 1.80 59.75
International Expo branch
6/29 Template:CRT stations 欢乐谷 2.38 36.58 Yubei
6/30 Template:CRT stations 黄茅坪 2.80 39.38
6/31 Template:CRT stations 高义口 3.44 42.82
6/32 Template:CRT stations 国博中心 2.32 45.14
6/33 Template:CRT stations 悦来 10 1.08 46.21
6/34 Template:CRT stations 王家庄 10 2.03 48.24
6/35 Template:CRT stations 清溪河 2.31 50.55 Beibei
6/36 Template:CRT stations 刘家院子 2.10 52.65
6/37 Template:CRT stations 思源 2.94 55.59
6/38 Template:CRT stations 复兴 1.70 57.29
6/39 Template:CRT stations 红岩坪 1.26 58.55
6/40 Template:CRT stations 沙河坝 1.45 59.99

Under Planning

Line 6 (main line)

  • Currently under planning & review
Eastern extension

Covering a distance of 5.2 km (3.2 mi), this 3 station extension starts from the existing southern terminus Chayuan and ends at Chongqing East Railway Station (Chongqingdong Railway Station), with 2 stations in between. Construction is expected to begin in 2020, with an estimated completion in 2023. The project is currently under planning and review.[4]

Station
Station name Connections Location
English Chinese
6/TBA Template:CRT stations 重庆东站 8 24 27 Nan'an
6/TBA Template:CRT stations 玉马路
6/TBA Template:CRT stations 蔷薇路


Notes

References

  1. ^ 重庆轨道客运量9月30日创新高 达到257.4万乘次.
  2. ^ "重庆轨道交通一号线朝天门至小什字段、五号线一期南段(跳磴至石桥铺段)、六号线支线二期(悦来至沙河坝段)、环线重庆图书馆至重庆西站至二郎段工程初期运营前安全评估服务招标公告". 2020-08-21. Archived from the original on 2020-08-30.
  3. ^ a b "重庆轨道交通4座车站于12月1日更名". 2019-11-30.
  4. ^ 重庆市城市轨道交通第四期第一批建设规划(2019-2024年)环境影响评价公众参与第二次公示. Chongqing Housing and Construction Committee (in Chinese (China)). 14 October 2019. Retrieved 16 October 2019.[permanent dead link]