Jump to content

Loop line (Chongqing Rail Transit)

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by 5.251.114.167 (talk) at 05:15, 5 February 2021. The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Loop line
Loop
Wulidian Station platform
Overview
Other name(s)Line 0
Native name重庆轨道交通环线
StatusOperational
Line number0
LocaleChongqing, China
Stations32 (in operation)
33
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
History
Opened28 December 2018; 5 years ago (2018-12-28)
Technical
Line length51 km (32 mi)
Number of tracks2
Track gauge1,435 mm (4 ft 8+12 in)
Electrification1500 V DC Overhead line
Route map

Honghudonglu
Min'an Ave.
Dongbu Park
Ranjiaba
Chongqing N. Station
S. Square
Chongqing North Railway Station 3 10
Yulu
Sports Park
Wulidian
Nanqiaosi
Yudaishan
Danzishi
Tushan
Tushan depot
Chongqing University
Renji
1 9 Shapingba Railway Station
Shapingba
Shangxinjie
Tianxingqiao
Shanghao
Majiayan depot
Haitangxi
Chongqing Library
Luojiaba
Fengmingshan
Sigongli depot
Shangqiao
Sigongli
5 Chongqingxi Railway Station
Chongqing W.
Nanhu
Haixialu
Hualong
Erlang
Xiejiawan
Caiyunhu
Xiejiawan
Chenjiaping
Olympic Sports Center

Loop line of CRT is a rapid transit loop line.[1] (also known as Line 0; Chinese: 〇号线 or 零号线) The northeastern section was opened on December 28, 2018. The southern section with the Egongyan Rail Transit Bridge opened on December 30, 2019.[2] The remaining section opened on January 20, 2021. It runs through two important railway stations, Chongqing North Railway Station, and Chongqing West Railway Station.[3]

Loop line train on Gaojiahuayuan Bridge

History

The line began construction on October 28, 2013.[4]

Opening timeline

Segment Commencement Length Station(s) Name
Chongqing Library – Haixialu 28 December 2018 33.7 km (20.94 mi)[5] 17 Northeastern Section
Min'an Ave. 11 January 2019 infill station 1
Luojiaba & Danzishi 1 July 2019 infill stations 2
Nanqiaosi 15 December 2019 infill station 1
Haixialu – Erlang 30 December 2019[2] 9.5 km (5.90 mi)[6] 5 Southern section
Chongqing Library – Chongqing West Railway Station – Erlang 20 January 2021 7.6 km (4.72 mi)[7] 4 Remaining section
Tianxingqiao & Renji 4 February 2021 infill station 2

Stations

Service
routes
Station
Station name Connections Distance
km
Location
E L English Chinese
↑ loop towards Template:CRT stations
0/01 Chongqing West 重庆西站 5 Shapingba
0/02 Template:CRT stations 上桥
0/03 Template:CRT stations 凤鸣山
0/04 Template:CRT stations 重庆图书馆
0/05 Template:CRT stations 天星桥
0/06 Template:CRT stations 沙坪坝 1[a] 9
0/07 Template:CRT stations[8] 重庆大学[8]
0/08 Template:CRT stations 玉带山 Jiangbei
0/09 Template:CRT stations 南桥寺
0/10 Template:CRT stations 体育公园 Yubei
0/11 Template:CRT stations 冉家坝 5 6
0/12 Template:CRT stations 动步公园
0/13 Template:CRT stations 洪湖东路
0/14 Template:CRT stations 民安大道 4
align="center" style = "background:#Template:CRT color; color:white" |↓ align="center" style = "background:#Template:CRT color; color:white" | through-service to/from Template:CRTs via Line 4
0/15 Chongqing North Station (South Square)[b] 重庆北站南广场 3 10 Yubei
0/16 Template:CRT stations 渝鲁 Jiangbei
0/17 Template:CRT stations 五里店 6 9
0/18 Template:CRT stations 弹子石 Nan'an
0/19 Template:CRT stations 涂山
0/20 Template:CRT stations 仁济
0/21 Template:CRT stations 上新街 6
0/22 Template:CRT stations 上浩
0/23 Template:CRT stations 海棠溪
0/24 Template:CRT stations 罗家坝
0/25 Template:CRT stations 四公里 3
0/26 Template:CRT stations 南湖 10
0/27 Template:CRT stations 海峡路
0/28 Template:CRT stations 谢家湾 2[a] Jiulongpo
0/29 Template:CRT stations 奥体中心 18
0/30 Template:CRT stations 陈家坪
0/31 Template:CRT stations 彩云湖
0/32 Template:CRT stations 二郎
0/33 Template:CRT stations 华龙
↓ loop towards Chongqing West
  1. ^ a b Out of system transfer.
  2. ^ The former translation is South Square of Chongqingbei Railway Station, which has been changed since the opening of the Line 10's station

Accident

On January 8, 2019, a train accident occurred in the tunnel between Haixialu and Nanhu where a train struck an improperly opened and secured safety shield. As a result, one person was killed and three people were injured.[9]

References

  1. ^ "Construction progress of Chongqing Metro Loop line". www.cqmetro.cn.
  2. ^ a b "重庆又有两段轨道开通:1号线尖璧段、环线西南半环". 2019-12-30.
  3. ^ "轨道交通4号线、5号线、10号线和环线 明年部分线路有望建成通车". May 17, 2016.
  4. ^ "招标公告 - 重庆城市交通开发投资(集团)有限公司". www.cqjtkt.cn. Retrieved 2021-01-20.
  5. ^ "重庆轨道交通环线东北半环、4号线一期开通试运营". 2018-12-29.
  6. ^ "好消息!环线海峡路至二郎段进入不载客试运行阶段". 2019-09-18.
  7. ^ "重庆轨道交通一号线朝天门至小什字段、五号线一期南段(跳磴至石桥铺段)、六号线支线二期(悦来至沙河坝段)、环线重庆图书馆至重庆西站至二郎段工程初期运营前安全评估服务招标公告". 2020-08-21. Archived from the original on 2020-08-30.
  8. ^ a b "重庆轨道交通4座车站于12月1日更名". 2019-11-30.
  9. ^ "The train accident on Chongqing Metro Loop Line".