Jump to content

Chipilima Hydro Electric Project

Coordinates: 21°21′13.03″N 83°55′0.99″E / 21.3536194°N 83.9169417°E / 21.3536194; 83.9169417
From Wikipedia, the free encyclopedia

This is the current revision of this page, as edited by InternetArchiveBot (talk | contribs) at 02:24, 23 September 2023 (Rescuing 1 sources and tagging 0 as dead.) #IABot (v2.0.9.5) (Whoop whoop pull up - 15149). The present address (URL) is a permanent link to this version.

(diff) ← Previous revision | Latest revision (diff) | Newer revision → (diff)

Chipilima Hydro Power plant
Power grids in CHEP
Map
Official nameଚିପିଲିମା ଜଳବିଦ୍ୟୁତ ପ୍ରକଳ୍ପ (Odia)
Country
  • India
LocationChipilima, Sambalpur, Odisha
Coordinates21°21′13.03″N 83°55′0.99″E / 21.3536194°N 83.9169417°E / 21.3536194; 83.9169417
StatusFunctional
OwnersOdisha Hydro Power Corporation, Bhubaneswar[1]
Thermal power station
Primary fuelHydropower
Power generation
Nameplate capacity75 MW[2][3]

Chipilima Hydro Electric Project (CHEP) is a hydropower plant located at Chipilima, Sambalpur, Odisha, India.

The Odisha government has plans for the modernisation of 5th and 6th unit of Burla Hydro Electric Project (BHEP) and 3rd unit of Chipilima Hydro Electric Project (CHEP) during the 11th five year plan tenure.[3] which in effect lead to modernisation and renovation of the 1st and the 2nd unit of Chipilima Hydro-Electric Project (CHEP) has been completed lengthening the longevity of these two units. This project being a part of the other hydro electric projects of Odisha collectively contributed 5234 million unit in 2005–06, to 7354 million units in 2006–07, and to 7883 million units in 2008–09.[3]

Location

[edit]

It is situated at Chipilima, 32.2 km from Sambalpur on the National Highway 6. Nearest airport is Raipur, Chhattisgarh. (262 km)

Footnotes

[edit]
  1. ^ "NBC ASIA : Profile : Clients List". Archived from the original on 31 January 2012. Retrieved 17 October 2011.
  2. ^ OHPC to add 171 megawatt
  3. ^ a b c Odisha government plans to take up modernisation of 5th and 6th unit of BHEP and 3rd unit of CHEP during the 11th five year plan period.12 August 2008

References

[edit]