Jump to content

Sunnybank railway station

Coordinates: 27°34′51″S 153°03′15″E / 27.5809°S 153.0543°E / -27.5809; 153.0543
From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Kerry Raymond (talk | contribs) at 19:34, 12 June 2020 (→‎top: oz tags, replaced: → {{Use Australian English|date=June 2020}}). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Sunnybank
Southbound view from Platform 1 in July 2012
General information
LocationDixon Street, Sunnybank
Coordinates27°34′51″S 153°03′15″E / 27.5809°S 153.0543°E / -27.5809; 153.0543
Owned byQueensland Rail
Operated byCity network
Line(s)Beenleigh
Distance17.57 kilometres from Central
Platforms3 (1 side, 1 island)
Tracks3
Construction
Structure typeGround
Parking231 bays
Bicycle facilitiesYes
AccessibleYes
Other information
StatusStaffed part time
Station code600209 (platform 1)
600210 (platform 2)
600211 (platform 3)
Fare zonego card 2
WebsiteTransLink
History
Rebuilt2008
ElectrifiedYes
Services
Preceding station   Queensland Rail   Following station
Template:QR lines

Sunnybank railway station is located on the Beenleigh line in Queensland, Australia. It is one of three stations serving the Brisbane suburb of Sunnybank, the others being Altandi and Banoon.

In 2008, an upgrade of the station was completed as part of the Salisbury to Kuraby triplication project. This included converting the western platform to an island, and a new footbridge with lifts.[1][2]

Services

Sunnybank station is served by all stops Beenleigh line services from Beenleigh and Kuraby to Bowen Hills and Ferny Grove.[3]

Services by platform

Platform Line Destinations Notes
1 Beenleigh Kuraby & Beenleigh [4]
2 Beenleigh Beenleigh, Bowen Hills & Ferny Grove Peak hours only[5]
3 Beenleigh Bowen Hills & Ferny Grove [6]

References

  1. ^ John Mickel (2 March 2008). "Salisbury to Kuraby rail upgrade paves the way for more train services". Queensland Government.
  2. ^ Salisbury to Kuraby Railway Upgrade RCP
  3. ^ "Beenleigh Line timetable". Translink. 2 March 2020.
  4. ^ Sunnybank Platform 1 TransLink
  5. ^ Sunnybank Platform 2 TransLink
  6. ^ Sunnybank Platform 3 TransLink