Line 2 (Xiamen Metro)
Line 2 | |
---|---|
2 | |
Overview | |
Status | In operation |
Locale | Xiamen, Fujian, China |
Termini | |
Stations | 32 (29 in operation[a]) |
Service | |
Type | Rapid transit |
System | Xiamen Metro |
History | |
Opened | 25 December 2019[1] |
Technical | |
Line length | 41.64 km (25.87 mi)[2] |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Operating speed | 80 km/h (50 mph) |
Line 2 of the Xiamen Metro is a subway line in Xiamen. The line running from Template:XiamenM stations to Template:XiamenM stations, has 32 stations and is 41.64 kilometres (25.87 mi) long.[2] It was opened on December 25, 2019.[1]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Wuyuanwan — Tianzhushan | 25 December 2019[1] | 41.64 km (25.87 mi)[2] | 29[a] | Phase 1 & 2 |
Stations
Construction mishap
In mid-December 2019, construction works near the Siming District were affected by subsidence. A major water pipe burst, and dirty water flooded the construction site, affecting the concourse, platform and metro lines under construction. The subsidence also caused a collapse of the surface road and a resulting crater of approximately 500 square metres (5,400 sq ft). The cause is believed to be a burst water pipe. Water also penetrated the now-opened Lücuo station of Line 1, and flooded the concourse and platform.[3]
References
- ^ a b c "厦门地铁2号线开通运营时间 起点终点路线站点图完整版". 2019-12-20.
- ^ a b c "厦门地铁2号线全线"轨通"!预计年底前开通试运营". 2019-05-13.
- ^ https://news.ltn.com.tw/news/world/breakingnews/3007554