Loop line (Chongqing Rail Transit)
Appearance
Loop line | |
---|---|
Add→{{rail-interchange}} | |
Overview | |
Other name(s) | Line 0 |
Native name | 重庆轨道交通环线 |
Status | Operational |
Line number | 0 |
Locale | Chongqing, China |
Stations | 26 (operational) |
Service | |
Type | Rapid transit |
System | Chongqing Rail Transit |
Operator(s) | Chongqing Rail Transit (Group) Co., Ltd. |
History | |
Opened | 28 December 2018 |
Technical | |
Line length | 43.2 km (26.8 miles)[1][2] (operational) 51 km (when fully complete) |
Number of tracks | 2 |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | 1500 V DC Overhead line |
Loop line of CRT is a rapid transit loop line.[3] (also known as Line 0; Chinese: 〇号线 or 零号线) The northeastern section was opened on December 28, 2018. The southern section with the Egongyan Rail Transit Bridge opened on December 30, 2019.[4] When the line is fully completed, it will run through two important railway stations, Chongqing North Railway Station, and Chongqing West Railway Station.[5]
Opening timeline
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Chongqing Library — Haixialu | 28 December 2018 | 33.7 km (20.94 mi)[1] | 17 | Northeastern Section |
Min'an Ave. | 11 January 2019 | infill station | 1 | |
Luojiaba & Danzishi | 1 July 2019 | infill stations | 2 | |
Nanqiaosi | 15 December 2019 | infill station | 1 | |
Haixialu — Erlang | 30 December 2019[4] | 9.5 km (5.90 mi)[2] | 5 | Southern section |
Stations
Service routes |
Station № |
Station name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|---|---|
English | Chinese | ||||||
— ↑ Loop line towards Template:CRT stations ↑ — | |||||||
0/01 | Chongqing West Railway Station | 重庆西站 | Add→{{rail-interchange}} | — | — | Shapingba | |
0/02 | Template:CRT stations | 上桥 | |||||
0/03 | Template:CRT stations | 凤鸣山 | |||||
● | 0/04 | Template:CRT stations | 重庆图书馆 | ||||
| | 0/05 | Template:CRT stations | 天星桥 | ||||
● | 0/06 | Template:CRT stations | 沙坪坝 | Add→{{rail-interchange}}[a] Add→{{rail-interchange}} | |||
● | 0/07 | Template:CRT stations[6] | 重庆大学[6] | ||||
● | 0/08 | Template:CRT stations | 玉带山 | Jiangbei | |||
● | 0/09 | Template:CRT stations | 南桥寺 | ||||
● | 0/10 | Template:CRT stations | 体育公园 | Yubei | |||
● | 0/11 | Template:CRT stations | 冉家坝 | Add→{{rail-interchange}} Add→{{rail-interchange}} | |||
● | 0/12 | Template:CRT stations | 动步公园 | ||||
● | 0/13 | Template:CRT stations | 洪湖东路 | ||||
● | 0/14 | Template:CRT stations | 民安大道 | Add→{{rail-interchange}} | |||
● | 0/15 | Template:CRT stations | 重庆北站南广场 | Add→{{rail-interchange}} Add→{{rail-interchange}} | |||
● | 0/16 | Template:CRT stations | 渝鲁 | Jiangbei | |||
● | 0/17 | Template:CRT stations | 五里店 | Add→{{rail-interchange}} Add→{{rail-interchange}} | |||
● | 0/18 | Template:CRT stations | 弹子石 | Nan'an | |||
● | 0/19 | Template:CRT stations | 涂山 | ||||
| | 0/20 | Template:CRT stations | 仁济 | ||||
● | 0/21 | Template:CRT stations | 上新街 | Add→{{rail-interchange}} | |||
| | 0/22 | Template:CRT stations | 上浩 | ||||
● | 0/23 | Template:CRT stations | 海棠溪 | ||||
● | 0/24 | Template:CRT stations | 罗家坝 | ||||
● | 0/25 | Template:CRT stations | 四公里 | Add→{{rail-interchange}} | |||
● | 0/26 | Template:CRT stations | 南湖 | Add→{{rail-interchange}} | |||
● | 0/27 | Template:CRT stations | 海峡路 | ||||
● | 0/28 | Template:CRT stations | 谢家湾 | Add→{{rail-interchange}}[a] | Jiulongpo | ||
● | 0/29 | Template:CRT stations | 奥体中心 | Add→{{rail-interchange}} | |||
● | 0/30 | Template:CRT stations | 陈家坪 | ||||
● | 0/31 | Template:CRT stations | 彩云湖 | ||||
● | 0/32 | Template:CRT stations | 二郎 | ||||
0/33 | Template:CRT stations | 华龙 | |||||
— ↓ Loop line towards Chongqing West Railway Station ↓ — | |||||||
Accident
On January 8, 2019, a train accident occurred in the tunnel between Haixialu and Nanhu where a train struck an improperly opened and secured safety shield. As a result, 4 people got injured (including 1 death).[7]
References
- ^ a b "重庆轨道交通环线东北半环、4号线一期开通试运营". 2018-12-29.
- ^ a b "好消息!环线海峡路至二郎段进入不载客试运行阶段". 2019-09-18.
- ^ "Construction progress of Chongqing Metro Loop line". www.cqmetro.cn.
- ^ a b "重庆又有两段轨道开通:1号线尖璧段、环线西南半环". 2019-12-30.
- ^ "轨道交通4号线、5号线、10号线和环线 明年部分线路有望建成通车". May 17, 2016.
- ^ a b "重庆轨道交通4座车站于12月1日更名". 2019-11-30.
- ^ "The train accident on Chongqing Metro Loop Line".