Jump to content

Chengjiao line

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by WOSlinkerBot (talk | contribs) at 21:47, 20 June 2020 (remove un-needed options from tables). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Chengjiao line
 15 
A train of Zhengzhou Metro running on Chengjiao line
Overview
Other name(s)Line 9
Suburban line
StatusOperational
LocaleZhengzhou, Henan, China
Termini
Stations12
Service
TypeRapid transit
SystemZhengzhou Metro
Operator(s)Zhengzhou Metro Group Corporation
Depot(s)Mengzhuang Depot
History
Opened12 January 2017; 7 years ago (2017-01-12)
Technical
Line length31.7 km (19.70 mi)[1]
Number of tracks2
CharacterUnderground and elevated
Track gauge1,435 mm (4 ft 8+12 in)
Route map

Continues as  2  to Liuzhuang
Nansihuan
Chengnan Depot
Shibalihe
Shawoli
Shuanghudadao
Xiaoqiao
Hua'nancheng West
Hua'nancheng
Hua'nancheng Dong
Jingguangshengang HSR
Left arrow to West Kowloon
to Beijing West Right arrow
Mengzhuang Depot
Jingguang railway
Left arrow to Guangzhou
to Beijing West Right arrow
Mengzhuang
 17  Right arrow to Chang'anlu Bei
Gangqu Bei
 ZXA  Right arrow to Zhengzhou East
Kangpinghu
Lanhegongyuan
Enpinghu
Zonghebaoshuiqu
Xinzheng International Airport  17  Xinzheng Airport railway station Bus interchange
 17  Left arrow to Xuchangdong Railway Station
Terminal 3 (reserved)
Jichang Dong
Gangqu Huizhan
Zhengwan HSR/Zhenghe HSR Up arrow to Zhengzhou East
Zhengzhou Hangkonggang Railway Station Zhengzhou Hangkonggang railway station
Zhengwan HSR/Zhenghe HSR Down arrow to Wanzhou North/Hefei South

Chengjiao line of the Zhengzhou Metro (Chinese: 郑州地铁城郊线; pinyin: Zhèngzhōu Dìtiě Chéngjiāo Xiàn), planned to be part of Line 9 in the future, is a rapid transit line running from southern Zhengzhou to Xinzheng. It was opened on 12 January 2017. This line is currently 31.7 km[1] long with 12 stations.[2]

Through train services are operated on Line 2 and Chengjiao line, although they are classified as separate lines.[3]

There are 3 directly trains from Template:ZZM stations to Template:ZZM stations every day, which stop at all stations before Template:ZZM stations, and then directly to Template:ZZM stations.

Map of Zhengzhou Metro Chengjiao Line

Opening timeline

Segment Commencement Length Station(s) Name
Nansihuan — Xinzheng International Airport 12 January 2017 31.7 km (19.70 mi)[1] 11 Phase 1
Kangpinghu 16 November 2017 Infill station 1

Stations

Line name Service Route Station
Station name Connections Location
Local Rapid English Chinese
Line 2 0215 Jiahe 贾河 Huiji
0216 Huijiquzhengfu 惠济区政府
0217 Maozhuang 毛庄
0218 Huangheyingbinguan 黄河迎宾馆  7 
0219 Jinwa 金洼
0220 Jindalu 金达路
0221 Liuzhuang 刘庄 Jinshui
0222 Liulin 柳林
0223 Shamen 沙门  4 
0224 Beisanhuan 北三环 Zhengzhou BRT Zhengzhou BRT Route B3, B6
0225 Dongfenglu 东风路  8 
0226 Guanhutun 关虎屯 Zhengzhou BRT Zhengzhou BRT Route B2
0227 Huanghelu 黄河路  5 
0228 Zijingshan 紫荆山  1 
0229 Dongdajie 东大街  3  Guancheng
0230 Longhaidonglu 陇海东路 Zhengzhou BRT Zhengzhou BRT Route B5
0231 Erligang 二里岗  6 
0232 Nanwulibao 南五里堡  5 
0233 Huazhai 花寨
0234 Nansanhuan 南三环
0235 Zhanmatun 站马屯
0236/0936 Nansihuan 南四环
Chengjiao line 0937 Shibalihe 十八里河 Guancheng
0938 Shawoli 沙窝李 Xinzheng
0939 Shuanghudadao 双湖大道
0940 Xiaoqiao 小乔
0941 Hua'nancheng West 华南城西
0942 Hua'nancheng 华南城
0943 Hua'nancheng Dong 华南城东
0944 Mengzhuang 孟庄
0945 Gangqu Bei 港区北  ZXA  Mengzhuang railway station
 Zhengxu 
0946 Kangpinghu 康平湖 Xinzheng / Zhongmu Co.
0947 Lanhegongyuan 兰河公园 Xinzheng
0948 Enpinghu 恩平湖 Zhongmu Co.
0949 Zonghebaoshuiqu 综合保税区
0950 Xinzheng International Airport 新郑机场  ZXA  EZF
Zhengzhou Xinzheng International AirportCGO
 Zhengxu 
Xinzheng
0951 Terminal 3 3号航站楼
0952 Jichang Dong 机场东 Zhongmu Co.
0953 Gangqu Huizhan 港区会展
0954 Zhengzhou Hangkonggang Railway Station 郑州航空港站  ZXA  ZIF

References

  1. ^ a b c "郑州地铁1号线二期和城郊铁路一期将开通试运营". 2017-01-11.
  2. ^ "郑州地铁12日开通两条新线路 这四站或越站通过" (in Chinese). Xinhua. Retrieved 18 January 2017.
  3. ^ "郑州地铁2号线将与城郊铁路实行大小交路套跑运行" (in Chinese). Xinhua. Retrieved 18 January 2017.