Isar Nuclear Power Plant
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
|
Isar Nuclear Power Plant | |
---|---|
Country | Germany |
Coordinates | 48°36′20.18″N 12°17′35.34″E / 48.6056056°N 12.2931500°E |
Status | Decommissioned |
Construction began | 1971 |
Commission date | 21 March 1979 |
Decommission date |
|
Owners | Isar 1: PreussenElektra (100%) Isar 2: 75% PreussenElektra; 25% SWM |
Operator | PreussenElektra |
Nuclear power station | |
Reactor type | Unit 1 BWR Unit 2 PWR |
Cooling towers | 1 |
Cooling source | Isar River |
Power generation | |
Units operational | 1 x 1485 MW (Unit 2) |
Units decommissioned | 1 x 912 MW (Unit 1) |
Nameplate capacity | 2,387 MW |
Capacity factor | 91.1% |
Annual net output | 19,051 GW·h |
External links | |
Website | Isar 1 and 2 |
Commons | Related media on Commons |
Isar I and Isar II are two base load nuclear power plants which have been built in Germany next to the Isar river. They are fourteen kilometres away from Landshut, between Essenbach and Niederaichbach.
Safety
Passive safety features
The safety feature begins with the passive safety feature which includes the radioactive materials in the reactor core (also by accidents[clarification needed]) to protect them from the outside environment. Fuel pellets, Fuel-Rod casings, reactor pressure vessel, biological shield, steel containment structure and the outer ferro concrete mantle are six of the most important passive safety features.[citation needed]
Active safety features
The passive safety installations are supplemented by a lot of automatically working active safety systems whose reliableness is based on their plural existence and their autonomously working in separate rooms. This is as necessary for the internal electric power supply as for the reactor cooling system, which guarantees the reliable thermal dissipation in every operating status, even when an implausible accident ingresses (for example a break of a primary coolant line). It constantly controls and compares all the important key operating parameters of the plant and activates automatically the necessary protection measures (independent from the plant operating personnel) if a parameter reaches a limit value. For example, the protection system may initiate a rapid shutdown and aftercooling procedure.
The future
On-site storage facilities
By law, all German nuclear power plants are forced to store their atomic waste in on-site storage facilities near the power plant. These temporary storage facilities have to be used until a final processing plant is built in a central location in Germany, to where all nuclear power plants will send their atomic waste. The usage of this storage is planned from 2030 onwards, so interim storage facilities are necessary.[citation needed]
The nuclear power plants Isar must also therefore have its own temporary storage facility, which has been under construction since 15 June 2004.[needs update]
Work on the temporary storage facility at the Isar location was marked by protest actions from environmentalist and resident groups, which voiced concern about possible health effects.[citation needed]
The interim storage facility of Isar nuclear power plant is in use since 2007 and provides capacity for 152 fuel element containers.[clarification needed]
Phasing-out of nuclear power
Concerns for the safety of nuclear power production were greatly increased after the Chernobyl accident in 1986, eventually leading to plans for its phase-out in certain countries. According to German Nuclear Phase-out regulations, Isar-I was to be shut down in 2011, with operations in Isar-II continuing until 2021. After the March 2011 Tōhoku earthquake and tsunami in Japan, however, the decision was made to expedite shutdown. Isar-I was closed as of 17 March 2011 for a three-month moratorium on nuclear power the result of that moratorium announced in the early hours of 30 May 2011 was that Isar-I would not return. Isar-II, being one of the strongest (ca. 1,400 MW) and most modern reactors in Germany, is supposed to run until the end of the phase-out (2022).
-
Isar 1 nuclear power plant
-
Isar 2 nuclear power plant
-
A view of the nuclear power plant
-
Isar 2