Jump to content

Shanghai–Suzhou–Huzhou high-speed railway

From Wikipedia, the free encyclopedia

This is an old revision of this page, as edited by Grahamec (talk | contribs) at 11:20, 13 July 2020 (add map). The present address (URL) is a permanent link to this revision, which may differ significantly from the current revision.

Shanghai–Huzhou
high-speed railway
沪苏湖铁路
Overview
StatusUnder construction
LocaleShanghai
Huzhou
Termini
Stations7
Service
Operator(s)China Railway High-speed
Technical
Line length164 km (102 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed350 km/h (217 mph)
Route map

km
Nanxiang
Shanghai EMU depot
Fengbang yard
Hongqiao yard
(start of this line)
Shanghai HongqiaoShanghai Metro  2  10  17 
Shanghai SouthShanghai Metro  1  3  15 
Qibao
Lijiatang
XinzhuangShanghai Metro  1  5 
Chunshen
Xinqiao (connect to Songjiang Tram T1 Songjiang Tram)
existing section of Shanghai–Kunming railway on left
new route through Shanghai Songjiang on right
Songjiang North
Shanghai SongjiangShanghai Metro  9 
Liantang
Suzhou South
Shengze
Huzhou Nanxun
Huzhou East
Huzhou
km

The Shanghai–Huzhou high-speed railway is a high-speed railway in China.[1]

History

Construction began in June 2020.[2]

Stations

Station Name Chinese Metro
transfers/connections
Shanghai Hongqiao 上海虹桥 Shanghai Metro  2   10   17 
Songjiang South 松江南 Shanghai Metro  9 
Fenhu 汾湖
Shengze 盛泽
Nanxun 南浔
Huzhou East 湖州东
Huzhou 湖州

References

  1. ^ "沪苏湖高铁正式获批!开工进入"倒计时"". WeChat Official Accounts Platform. Retrieved 2020-07-02.
  2. ^ "沪苏湖铁路来了,长三角交通网越织越密-新华网". sh.xinhuanet.com. Retrieved 2020-07-02.